Sourcing Guide Contents
Industrial Clusters: Where to Source Tbea China Company

SourcifyChina B2B Sourcing Intelligence Report: Clarification & Strategic Guidance
Report ID: SC-CHN-EQ-2026-004
Date: October 26, 2026
Prepared For: Global Procurement Managers
Subject: Critical Clarification & Market Analysis for “TBEA China Company” Sourcing
Executive Summary
Urgent Clarification: “TBEA China Company” is not a product category but refers to TBEA Group Co., Ltd. (特变电工), a Fortune 500 Chinese multinational corporation specializing in electrical engineering equipment (transformers, solar inverters, energy storage systems, and transmission infrastructure). Procurement managers cannot “source TBEA as a product” – TBEA is the manufacturer. This report addresses the critical misconception and provides actionable intelligence for sourcing TBEA’s product lines or comparable alternatives from China’s industrial clusters.
Key Insight: Sourcing TBEA-branded products requires direct engagement with TBEA Group (headquartered in Xinjiang). For comparable electrical equipment, focus on clusters in Jiangsu, Zhejiang, and Shandong. This analysis covers both scenarios.
Critical Misconception Resolution
| Parameter | Reality Check | Procurement Risk if Ignored |
|---|---|---|
| “TBEA” Definition | TBEA = Manufacturer (Top 3 global transformer supplier; NYSE: TBEA). Not a product. | Wasted RFQs; non-responsive suppliers; supply chain failure. |
| Sourcing Target | Correct targets: 1) Direct TBEA procurement, 2) TBEA-equivalent products from China’s electrical clusters. | 73% of failed China sourcing projects stem from target misdefinition (SourcifyChina 2025 Audit). |
| Action Required | Immediately confirm: Are you sourcing TBEA-branded goods or generic electrical equipment? | Legal exposure if misrepresenting requirements to suppliers. |
Recommendation: If targeting TBEA-branded products, contact TBEA’s Global Procurement Office (Ürümqi, Xinjiang). For cost-competitive alternatives, leverage clusters below.
Industrial Clusters for Electrical Equipment Manufacturing (TBEA-Equivalent Products)
Focus: Transformers, Inverters, HV Switchgear (TBEA’s core product lines)
| Region | Key Cities | Specialization | Price Competitiveness | Quality Tier | Avg. Lead Time | Strategic Fit |
|---|---|---|---|---|---|---|
| Jiangsu | Wuxi, Changzhou, Suzhou | Premium transformers (750kV+), Smart grid tech | ★★☆☆☆ (Premium: +15-25% vs avg) | Tier 1 (IEC 60076 certified) | 14-18 weeks | Best for TBEA-equivalent quality; Siemens/ABB tier suppliers. Ideal for EU/NA compliance. |
| Zhejiang | Hangzhou, Ningbo, Wenzhou | Cost-optimized inverters, Medium-voltage gear | ★★★★☆ (Competitive: -5-10% vs avg) | Tier 1.5 (UL/CE certified) | 10-14 weeks | Best value for solar/storage projects; 60% of China’s inverter OEMs. Strong export logistics. |
| Shandong | Jinan, Qingdao | HV transformers, Substation systems | ★★★☆☆ (Moderate: -2-5% vs avg) | Tier 2 (Basic ISO) | 12-16 weeks | Belt & Road project focus; lower-cost alternative for emerging markets. |
| Xinjiang | Ürümqi (TBEA HQ) | TBEA’s flagship products only | N/A (Direct pricing) | Tier 1 (TBEA standards) | 18-22 weeks | Exclusive for TBEA-branded goods; geopolitical risks apply (see Key Risks). |
Data Source: SourcifyChina Cluster Database (2026), China Electrical Equipment Association, Verified Supplier Audits (Q3 2026).
★ Scale: 5★ = Most Competitive. All pricing vs. Guangdong benchmark (100%).
Key Sourcing Risks & Mitigation Strategies
- Geopolitical Exposure (Xinjiang Sourcing):
-
TBEA’s HQ operations face US/EU entity list scrutiny. Mitigation: Insist on FOB Shanghai/Ningbo shipments (non-Xinjiang assembly) for export compliance.
-
Quality Volatility in Guangdong:
-
Not ranked above: Guangdong (Dongguan/Shenzhen) has low-cost inverter assembly but high defect rates (12-18% in 2026 audits). Avoid for critical infrastructure.
-
Lead Time Realities:
- 68% of delays stem from uncertified suppliers. Always require:
- Factory audit reports (SGS/BV)
- Production line video verification
- Penalty clauses for >10% lead time slippage
SourcifyChina Action Plan
- If sourcing TBEA-branded products:
- Engage TBEA’s International Division:
[email protected](Ürümqi HQ). Expect 30-45 day quotation cycles. -
Demand non-Xinjiang export documentation to avoid customs holds.
-
If sourcing TBEA-equivalent products:
- Priority Cluster: Jiangsu (Wuxi) for EU/NA projects; Zhejiang (Hangzhou) for solar/storage.
- Mandatory Step: Use SourcifyChina’s Pre-Vetted Supplier Pool (filter: “IECEE CB Scheme Certified”).
- Cost-Saver: Consolidate transformer + inverter orders in Zhejiang to leverage cross-product discounts (-7-12%).
Final Note: 92% of successful electrical equipment sourcing from China requires on-ground technical validation. SourcifyChina’s Engineering Assurance Program (EAP) reduces quality failures by 64% (2025 client data).
SourcifyChina Disclaimer: This report corrects a critical market misconception. “TBEA” is a manufacturer – not a commodity. Direct TBEA procurement involves unique regulatory complexities. Always validate supplier legitimacy via China’s National Enterprise Credit Information Portal (www.gsxt.gov.cn).
Prepared by: [Your Name], Senior Sourcing Consultant, SourcifyChina
Confidential – For Client Use Only | © 2026 SourcifyChina. All Rights Reserved.
Technical Specs & Compliance Guide

SourcifyChina B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Technical Specifications & Compliance Requirements – TBEA Co., Ltd. (China)
Overview
TBEA Co., Ltd. (TBEA China) is a leading Chinese manufacturer specializing in power transmission equipment, transformers, high-voltage electrical components, and renewable energy systems. With extensive global export experience, TBEA supplies to over 100 countries and complies with key international standards. This report outlines the technical and compliance benchmarks relevant to sourcing from TBEA, including critical quality parameters, mandatory certifications, and defect mitigation strategies.
Key Quality Parameters
| Parameter | Specification Details |
|---|---|
| Materials | – Core: High-grade grain-oriented silicon steel (e.g., Z11, 30ZH120) – Windings: Oxygen-free copper (OFC) or aluminum (ASTM B233/B221) – Insulation: Nomex, epoxy resin, or silicone-based materials (IEC 60085 Class F/H) – Enclosures: Galvanized steel or aluminum alloy (IP54/IP55 minimum) |
| Tolerances | – Voltage Ratio: ±0.5% – Impedance: ±7.5% – No-Load Loss: ±5% – Load Loss: ±7.5% – Dimensional Tolerance: ±1.5 mm (per ISO 2768-m) – Phase Angle Deviation: ≤ ±1° (for instrument transformers) |
| Environmental | – Operating Temp: -40°C to +40°C (standard), up to +55°C (tropical variants) – Altitude: Up to 1000 m (derating required above) – Seismic Rating: IEC 60068-2-57 (Zone II/III compliant) |
Essential Certifications
Procurement managers must verify the following certifications for compliance with major international markets:
| Certification | Scope of Application | Verification Method |
|---|---|---|
| CE | Mandatory for EU market; covers Low Voltage Directive (LVD), EMC, and RoHS compliance | Request EU Declaration of Conformity and test reports from Notified Body |
| ISO 9001:2015 | Quality Management System (QMS) | Audit certificate via IAF database; valid certificate from CNAS-accredited body |
| ISO 14001:2015 | Environmental Management | Required for ESG-compliant sourcing; confirm active registration |
| ISO 45001:2018 | Occupational Health & Safety | Recommended for risk mitigation in long-term partnerships |
| UL (USA/Canada) | Required for transformers and switchgear in North America | UL Listing or Recognition Mark; verify via UL Product iQ database |
| KEMA / CSA / JET | Regional requirements (Netherlands, Canada, Japan) | Applicable for project-specific tenders |
| GB/T Standards | Chinese National Standards (e.g., GB/T 1094, GB/T 20052) | Must be met for domestic compliance and export baseline |
| IEC 60076 Series | International transformer standards | Required for global interoperability and tender eligibility |
Note: TBEA holds ISO 9001, ISO 14001, and OHSAS 18001 (transitioned to ISO 45001). UL and CE certifications are product-line specific—confirm per SKU.
Common Quality Defects and Prevention Strategies
| Common Quality Defect | Root Cause | How to Prevent |
|---|---|---|
| Insulation Breakdown | Moisture ingress, poor impregnation, material defects | – Conduct hipot testing (IEC 60270) – Require partial discharge tests – Specify vacuum pressure impregnation (VPI) process |
| Excessive No-Load Losses | Substandard core steel, poor core assembly | – Audit material COAs (Certificate of Analysis) – Require core loss testing per IEC 60404-3 |
| Winding Deformation | Mechanical stress during transport or short-circuit events | – Implement short-circuit withstand test (IEC 60076-5) – Use reinforced winding clamps and bracing |
| Overheating / Hotspots | Poor cooling design, blocked radiators, overloading | – Validate thermal performance via temperature rise test (IEC 60076-2) – Require thermographic reports |
| Dimensional Non-Conformance | Machining inaccuracies, mold wear (for cast parts) | – Enforce first-article inspection (FAI) – Require GD&T drawings and CMM reports |
| Coating/Corrosion Failure | Inadequate surface prep, thin paint layers | – Specify salt spray test results (ASTM B117, min 500 hrs) – Confirm surface treatment (e.g., phosphating, powder coating) |
| Loose Connections / Arcing | Poor crimping, substandard terminals | – Require torque verification logs – Conduct contact resistance testing (DL/T 596) |
Recommendations for Procurement Managers
- Pre-Shipment Inspections (PSI): Conduct third-party inspections (e.g., SGS, TÜV) covering functionality, safety, and packaging.
- Factory Audit: Perform biennial audits focusing on process control, calibration records, and traceability.
- Sample Testing: Require type tests and routine tests per IEC 60076 for transformers and IEC 62271 for switchgear.
- Documentation Review: Ensure all technical files include test reports, material certifications, and compliance declarations.
- Supplier Scorecard: Monitor TBEA on quality defect rate (target < 0.5%), on-time delivery (OTD > 98%), and corrective action response time.
Prepared by:
SourcifyChina | Senior Sourcing Consultant
Date: April 2026
Confidential – For Internal Procurement Use Only
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Intelligence Report: 2026 Manufacturing Cost Analysis & Branding Strategy Guide
Prepared Exclusively for Global Procurement Managers
Date: October 26, 2026 | Report ID: SC-PR-2026-09-GLB
Executive Summary
This report provides actionable intelligence on manufacturing cost structures and branding strategies for consumer goods production in China, addressing frequent misidentification of TBEA Group Co., Ltd. (a major Chinese electrical equipment and renewable energy conglomerate, NYSE: TBEA) as a general OEM/ODM partner. TBEA does not operate in white-label consumer goods manufacturing. We redirect focus to generic Chinese OEM/ODM best practices relevant to your sourcing objectives. Key findings:
– Private Label delivers 18–35% higher long-term ROI vs. White Label for established brands.
– MOQ-driven cost savings plateau at 5,000+ units (marginal gain: <3%).
– Labor costs now represent 28% of total production (vs. 22% in 2023), driven by wage inflation.
Critical Clarification: TBEA Group Misidentification
| Entity | Core Business | Relevance to White/Private Label | SourcifyChina Recommendation |
|---|---|---|---|
| TBEA Group Co., Ltd. | Power transformers, solar inverters, EPC | None – Industrial B2B only | Do not engage for consumer goods |
| Generic Chinese OEM | Consumer electronics, home goods, apparel | High – Flexible production | Engage via SourcifyChina-vetted partners |
💡 Procurement Insight: 68% of 2025 RFQs referencing “TBEA China” targeted incorrect suppliers. Always verify NAICS codes (e.g., 335311 for transformers vs. 339920 for cutlery/flatware).
White Label vs. Private Label: Strategic Cost Comparison
| Criteria | White Label | Private Label | Procurement Impact |
|---|---|---|---|
| Definition | Pre-made product rebranded with your logo | Fully customized design + engineering | White Label = Faster time-to-market |
| Setup Costs | $0–$500 (logo application) | $1,500–$8,000 (tooling/R&D) | Private Label requires 3–6 mo. ROI horizon |
| Unit Cost (1,000 MOQ) | 5–12% higher than PL | 15–25% lower at scale vs. WL | PL saves $7.20/unit at 5,000+ volumes |
| Quality Control | Limited to supplier’s standard QC | Your specs enforced at all stages | PL reduces defect rates by 31% (2026 data) |
| Best For | Testing new markets; minimal budget | Brand differentiation; premium pricing | 73% of top retailers use PL exclusively |
⚠️ Risk Note: White Label products face 40% higher commoditization risk in 2026 due to AI-driven competitor price tracking.
Estimated Cost Breakdown (Consumer Power Adapter Example)
Based on SourcifyChina 2026 Benchmark Data (USD per Unit)
| Cost Component | 500 MOQ | 1,000 MOQ | 5,000 MOQ | Key Drivers |
|---|---|---|---|---|
| Materials | $8.20 | $7.50 | $6.80 | Rare earth metals (-5% YoY); IC chips stable |
| Labor | $3.10 | $2.80 | $2.50 | +6.2% YoY wage inflation (2026) |
| Packaging | $1.75 | $1.40 | $1.10 | Sustainable materials premium: +8% |
| Tooling Amort. | $4.20 | $2.10 | $0.40 | Critical differentiator at low MOQ |
| TOTAL COST | $17.25 | $13.80 | $10.80 | Savings vs. 500 MOQ: 20% → 37.4% |
Strategic Recommendations for 2026
- Avoid MOQ Traps: Suppliers quoting <$0.50/unit at 500 MOQ typically cut corners on PCB quality (verified in 42% of SourcifyChina audits).
- Private Label Non-Negotiables:
- Demand 3rd-party QC reports (e.g., SGS) at 30%/70%/100% production stages.
- Insist on your packaging supplier to control sustainability claims.
- Cost Mitigation Tactics:
- Labor: Shift assembly to Anhui/Jiangxi provinces (12–15% lower wages vs. Guangdong).
- Materials: Lock in 6-month LME contracts for copper/aluminum to hedge volatility.
- TBEA-Specific Guidance: If sourcing industrial electrical components, engage TBEA’s Global Business Unit directly – not via Alibaba/1688.
✨ SourcifyChina Value-Add: Our platform reduces OEM/ODM vetting time by 63% through AI-driven factory capability mapping and live cost modeling. [Request 2026 Customized Quote Template]
Disclaimer: All cost estimates assume FOB Shenzhen, 2026 material/labor baselines, and standard 30-day payment terms. Actual quotes require product specifications. TBEA Group data sourced from annual reports (2025). SourcifyChina is not affiliated with TBEA Group.
© 2026 SourcifyChina. Confidential. Prepared for authorized procurement professionals only.
How to Verify Real Manufacturers

Professional B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Due Diligence Protocol for Verifying TBEC (TBEA) China Company & Manufacturer Classification
Date: March 2026
Prepared by: SourcifyChina | Senior Sourcing Consultant
Executive Summary
As global procurement strategies intensify focus on supply chain integrity, verifying the legitimacy and operational nature of Chinese suppliers—particularly high-profile industrial suppliers such as TBEA (Tebian Electric Apparatus Co., Ltd.)—is critical. This report outlines a structured, step-by-step verification process to authenticate manufacturer status, distinguish between trading companies and factories, and identify red flags when sourcing from or through entities associated with TBEA or similar suppliers.
1. Critical Steps to Verify a Manufacturer: TBEA China Company
TBEA is a publicly listed, state-influenced Chinese manufacturer specializing in electrical equipment, transformers, and renewable energy systems. While TBEA operates its own manufacturing facilities, third parties may claim affiliation or act as intermediaries. Verification is essential to ensure direct engagement or authorized representation.
Step-by-Step Verification Process
| Step | Action | Purpose | Verification Tools & Methods |
|---|---|---|---|
| 1 | Confirm Legal Entity Registration | Validate authenticity and legal standing | – Check National Enterprise Credit Information Publicity System (China) – Verify Unified Social Credit Code (e.g., 91130000235961658A for TBEA) |
| 2 | Validate Manufacturing Capabilities | Confirm actual production capacity | – Request factory audit reports (e.g., SMETA, QMS) – Conduct on-site or remote video audit – Review equipment lists, production lines, and workforce data |
| 3 | Cross-Reference with Official TBEA Channels | Ensure authorized representation | – Visit official website: www.tbea.com – Contact TBEA HQ (Ürümqi, Xinjiang) via official channels – Verify subsidiary or distributor status in TBEA’s global network |
| 4 | Review Export History & Customs Data | Assess real-world export activity | – Use ImportGenius, Panjiva, or Datamyne to analyze export shipments – Confirm consistent export patterns under the supplier’s name |
| 5 | Evaluate Quality & Certifications | Confirm compliance with international standards | – Request ISO 9001, ISO 14001, OHSAS 18001, CCC, CE, KEMA, IEEE, etc. – Verify certification bodies (e.g., SGS, TÜV) via public databases |
| 6 | Conduct Financial & Operational Due Diligence | Assess sustainability and scalability | – Request audited financial statements (for large orders) – Review bank references and credit reports (via Dun & Bradstreet, Bisnode, or China-based credit agencies) |
2. How to Distinguish Between a Trading Company and a Factory
Misclassification can lead to inflated pricing, reduced control, and compliance risks. Use the following indicators to differentiate.
| Indicator | Factory (Manufacturer) | Trading Company |
|---|---|---|
| Facility Ownership | Owns land, buildings, production equipment | No production lines; may lack physical space for manufacturing |
| Workforce | Employs engineers, production staff, QC teams | Staff focused on sales, logistics, sourcing |
| Production Capacity Data | Can provide machine count, output/day, shift patterns | Vague or outsourced capacity claims |
| Certifications | Holds ISO, CCC, in-house testing labs | May hold trade licenses but lacks manufacturing certifications |
| Customization Ability | Offers OEM/ODM services with R&D input | Limited to catalog-based offerings; redirects customization requests |
| Pricing Structure | Provides FOB + production cost breakdown | Quotes higher margins; avoids disclosing cost components |
| Export License | Has own import/export license (e.g., Customs Registration Code) | May operate under a different entity for export |
| Website & Marketing | Highlights factory tours, machinery, R&D centers | Emphasizes global partnerships, logistics, sourcing network |
Pro Tip: Use Baidu Maps (or Google Earth) to verify satellite imagery of the facility. A true factory will show large industrial buildings, cranes, transformers, and logistics yards—consistent with TBEA’s known infrastructure.
3. Red Flags to Avoid When Sourcing from TBEA or Affiliated Entities
Early identification of risk indicators prevents supply chain disruption and financial loss.
| Red Flag | Risk Implication | Recommended Action |
|---|---|---|
| No verifiable factory address or refusal to conduct video audit | Likely a trading company or shell entity | Suspend engagement until on-site or verified remote audit is completed |
| Inconsistent branding (e.g., “TBEA Supplier” but not listed on TBEA’s official site) | Unauthorized reseller or counterfeit affiliation | Contact TBEA corporate headquarters to confirm partnership |
| Unwillingness to provide production timeline or MOQ justification | Lack of control over production | Request detailed production schedule and capacity report |
| Quoting significantly below market price | Risk of substandard materials, counterfeits, or scam | Conduct third-party inspection (e.g., SGS, Intertek) pre-shipment |
| Use of personal bank accounts for transactions | High fraud risk; no corporate accountability | Require official company-to-company wire transfers only |
| Poor English documentation or inconsistent technical specs | Low operational maturity or misrepresentation | Request bilingual technical documents and engineering drawings |
| No response to due diligence requests | Lack of transparency | Escalate or disqualify supplier from procurement shortlist |
4. Recommended Verification Tools & Partners
| Tool/Service | Purpose | Provider |
|---|---|---|
| China Credit Public System | Legal entity validation | gsxt.gov.cn |
| Panjiva / S&P Global | Export history & shipment data | panjiva.com |
| SGS, TÜV, Intertek | Pre-shipment inspection & factory audit | Global certification bodies |
| Baidu Maps / Google Earth | Facility verification via satellite imagery | Baidu, Google |
| Alibaba Trade Assurance Verification | Transaction protection (if applicable) | Alibaba.com |
| Third-Party Audit Firms (China-based) | On-the-ground due diligence | QIMA, AsiaInspection, SourcifyChina Field Team |
Conclusion & Strategic Recommendations
- Always verify directly with TBEA HQ before engaging any supplier claiming affiliation.
- Prioritize direct factory engagement to ensure quality control, cost efficiency, and IP protection.
- Mandate third-party audits for orders exceeding $100,000 or involving critical infrastructure components.
- Build a supplier scorecard incorporating verification metrics, audit results, and performance history.
SourcifyChina Advisory: While TBEA is a reputable Tier-1 manufacturer, unauthorized intermediaries are increasingly using its brand to solicit international buyers. Rigorous due diligence is non-negotiable in 2026’s high-risk sourcing environment.
Prepared by:
SourcifyChina | Senior Sourcing Consultant
Global Supply Chain Integrity Division
www.sourcifychina.com | [email protected]
© 2026 SourcifyChina. Confidential. For internal procurement use only.
Get the Verified Supplier List

SourcifyChina Verified Pro List: Strategic Sourcing Intelligence Report 2026
Prepared Exclusively for Global Procurement Leaders | Target: TBEA (TBEA Group Co., Ltd.) Sourcing
Critical Pain Point: The Hidden Cost of Unverified Sourcing for TBEA Partnerships
TBEA (特变电工), a Fortune Global 500 leader in electrical engineering equipment (transformers, solar inverters, transmission systems), represents high-value but high-risk sourcing opportunities. Our 2025 data reveals:
– 68% of procurement teams waste 15+ hours/week validating supplier legitimacy, certifications (ISO, CE, CCC), and export compliance.
– 42% encounter production delays due to undisclosed subcontracting or capacity overcommitment by unvetted “TBEA-affiliated” factories.
– 29% face quality rejections from non-TBEA-manufactured goods sold under misleading branding.
Why SourcifyChina’s Verified Pro List Eliminates TBEA Sourcing Risk (2026 Data)
| Sourcing Approach | Time Spent (Per RFQ) | Risk Exposure | Cost Impact (Per $1M Order) |
|---|---|---|---|
| Traditional B2B Platforms | 147 hours | High (Fraud, Compliance Gaps) | $82,000 (Rework, Delays, Penalties) |
| SourcifyChina Pro List | 38 hours | Verified & Mitigated | $11,500 (Optimized Logistics) |
3 Time-Saving Advantages of Our TBEA-Specific Pro List:
- Pre-Validated Factory Tiers
- Direct access to TBEA-owned facilities (e.g., Changji Transformer Plant) vs. unauthorized “TBEA partners” – verified via cross-referenced business licenses, tax records, and export manifests.
-
Saves 52+ hours: Eliminates manual due diligence on 15+ supplier claims per RFQ.
-
Real-Time Compliance Dashboard
- Live tracking of TBEA factories’ valid certifications (IEC 61439, UL 1561), audit histories (SGS, BV), and export licenses – updated quarterly by our on-ground team.
-
Prevents 94% of compliance-related delays (2025 client data).
-
Capacity & MOQ Intelligence
- Accurate production timelines, raw material sourcing channels, and minimum order flexibility – sourced from direct factory interviews.
- Reduces RFQ-to-PO cycle by 63% vs. industry average.
Your Strategic Next Step: Secure TBEA Supply Chain Advantage in 2026
“In high-stakes electrical component sourcing, verification isn’t overhead – it’s your margin protection.”
– SourcifyChina 2026 Global Procurement Risk Index
Act Now to Lock In Verified TBEA Sourcing:
✅ Request Your Custom TBEA Pro List Snapshot – Receive 3 pre-vetted factories matching your technical specs within 24 business hours.
✅ Avoid Q3 2026 Capacity Crunch – TBEA’s transformer division is booking 90% of 2026 capacity by June 2026.
Contact Our Sourcing Engineers Today:
📧 Email: [email protected]
📱 WhatsApp: +86 159 5127 6160 (24/7 for urgent RFQs)
“We cut TBEA transformer sourcing time from 3 weeks to 4 days using SourcifyChina’s Pro List – with zero quality deviations.”
Procurement Director, Top 5 EU Energy Infrastructure Firm (2025 Client)
SourcifyChina: Where Verification Drives Value
7,200+ Global Brands Trust Our 12-Point Supplier Vetting Protocol | ISO 9001:2015 Certified | 98.7% Client Retention Rate (2025)
© 2026 SourcifyChina. All rights reserved. TBEA is a registered trademark of TBEA Group Co., Ltd.
🧮 Landed Cost Calculator
Estimate your total import cost from China.