Sourcing Guide Contents
Industrial Clusters: Where to Source Drone China Company

SourcifyChina B2B Sourcing Report 2026
Title: Strategic Sourcing of Drone Manufacturers in China: Industrial Clusters, Regional Comparisons & Procurement Insights
Prepared For: Global Procurement Managers
Prepared By: SourcifyChina – Senior Sourcing Consultants
Date: April 5, 2026
Executive Summary
China remains the global epicenter of drone manufacturing, accounting for over 70% of global commercial and industrial drone production. With increasing demand across sectors such as agriculture, surveying, logistics, and defense, procurement managers are prioritizing reliable, scalable, and cost-effective sourcing strategies from Chinese OEMs and ODMs. This report provides a deep-dive analysis of China’s key industrial clusters for drone manufacturing, evaluates regional strengths, and delivers a data-driven comparison of core production provinces to support strategic decision-making.
Key Industrial Clusters for Drone Manufacturing in China
Drone manufacturing in China is highly concentrated in advanced technology and electronics manufacturing hubs. The following provinces and cities are recognized as dominant industrial clusters:
1. Guangdong Province (Shenzhen, Guangzhou, Dongguan)
- Epicenter: Shenzhen is the undisputed leader in drone innovation and production.
- Key Players: DJI (global market leader), Autel Robotics, EHang.
- Ecosystem: Dense supply chain for motors, batteries, gimbals, and flight controllers. Home to world-class PCB and electronics assembly.
- Strengths: R&D leadership, rapid prototyping, integration of AI and camera systems.
2. Zhejiang Province (Hangzhou, Ningbo, Yiwu)
- Epicenter: Hangzhou (Alibaba’s tech ecosystem) and Ningbo (industrial manufacturing).
- Key Players: XAG (agricultural drones), ZeroTech.
- Strengths: Strong in mid-tier industrial and agricultural drones; cost-efficient mass production.
- Supply Chain: Access to lightweight composites, injection molding, and IoT integration.
3. Jiangsu Province (Suzhou, Nanjing, Wuxi)
- Epicenter: Suzhou Industrial Park (high-tech manufacturing zone).
- Strengths: Precision engineering, advanced materials, and integration with German-Japanese automation standards.
- Applications: Industrial inspection, thermal imaging drones.
4. Beijing-Tianjin-Hebei Region (Beijing, Tianjin)
- Focus: High-end R&D, defense, and government-grade drones.
- Strengths: Strong academic and military-industrial partnerships (e.g., Beihang University).
- Limitations: Export restrictions on certain models; longer lead times.
5. Shanghai & Anhui (Hefei)
- Focus: Smart city applications, logistics drones.
- Hefei: Emerging hub due to government investment in AI and robotics (e.g., iFlytek ecosystem).
Regional Comparison: Drone Manufacturing in China (2026)
The table below compares key production regions based on three critical procurement KPIs: Price, Quality, and Lead Time. Ratings are on a scale of 1–5 (5 = best).
| Region | Key Cities | Price Competitiveness | Quality Level | Average Lead Time (Days) | Best For |
|---|---|---|---|---|---|
| Guangdong | Shenzhen, Guangzhou | 3.5 | 5.0 | 30–45 | High-performance commercial & enterprise drones; innovation-driven projects |
| Zhejiang | Hangzhou, Ningbo | 4.5 | 4.0 | 35–50 | Mid-range industrial & agricultural drones; cost-sensitive volume orders |
| Jiangsu | Suzhou, Nanjing | 3.0 | 4.5 | 40–60 | High-precision inspection & thermal drones; EU/US compliance-focused |
| Beijing-Tianjin | Beijing, Tianjin | 2.5 | 4.5 | 50–75+ | Government, defense, and specialized R&D projects |
| Shanghai/Anhui | Shanghai, Hefei | 3.0 | 4.0 | 40–55 | Urban logistics, smart city drones; AI-integrated platforms |
Notes:
– Price: Based on FOB Shenzhen comparisons for standard 1,000-unit orders of mid-tier commercial drones (e.g., 4K camera, 30-min flight time).
– Quality: Assessed via defect rates (PPM), component sourcing (e.g., Sony sensors vs. domestic), and certification compliance (CE, FCC, ISO).
– Lead Time: Includes production, QA, and customs clearance for export.
Strategic Sourcing Recommendations
-
For Premium Performance & Innovation:
Source from Guangdong (Shenzhen). Despite higher costs, unmatched R&D, component quality, and ecosystem integration justify investment for high-margin or cutting-edge applications. -
For Cost-Effective Volume Orders:
Zhejiang offers the best balance of cost and reliability, especially for agricultural spraying or inspection drones. -
For EU/NA Compliance & Precision Engineering:
Consider Jiangsu, where manufacturers adhere to stricter quality control and offer better documentation for regulatory approval. -
For Government & Restricted Applications:
Exercise caution with Beijing-Tianjin due to export controls; use only for domestic or sanctioned international contracts. -
For Future-Forward Applications (AI, Logistics):
Monitor Hefei (Anhui) as an emerging cluster with strong state backing and integration into smart infrastructure networks.
Conclusion
China’s drone manufacturing landscape is both mature and evolving. While Guangdong remains the gold standard, procurement managers must align regional sourcing decisions with product requirements, cost targets, and time-to-market goals. A multi-cluster sourcing strategy—leveraging Zhejiang for volume and Guangdong for innovation—can optimize total cost of ownership and supply chain resilience.
SourcifyChina recommends conducting on-site audits and engaging local sourcing partners to navigate compliance, intellectual property, and logistics complexities in 2026.
Prepared by:
SourcifyChina Senior Sourcing Consultants
Global Supply Chain Intelligence Division
[email protected] | www.sourcifychina.com
Technical Specs & Compliance Guide
SourcifyChina B2B Sourcing Intelligence Report: Industrial Drone Procurement from China (2026 Outlook)
Prepared Exclusively for Global Procurement Managers
Date: January 15, 2026 | Report ID: SC-DRN-2026-001
Executive Summary
Chinese drone manufacturers now supply 78% of global industrial UAVs (per Gartner 2025). While cost advantages remain compelling (15-25% below Western OEMs), quality variance and compliance gaps pose significant supply chain risks. This report details non-negotiable technical and regulatory requirements for industrial-grade drones (excludes consumer models). Critical note: “Drone China Company” is not a standardized product category – specifications must be defined per use case (e.g., surveying, delivery, inspection).
I. Technical Specifications: Non-Negotiable Quality Parameters
Procurement managers must enforce these in RFQs. Tolerances below represent 2026 market baseline for Tier-1 suppliers.
| Parameter | Industrial Drone Requirement (2026) | Why This Matters |
|---|---|---|
| Structural Materials | Carbon fiber frame (T700/T800 grade), aerospace-grade aluminum alloy arms (6061-T6) | Prevents vibration-induced sensor drift; withstands -20°C to 50°C operating temps. Avoid suppliers using recycled composites. |
| Motor Tolerances | ±0.05mm shaft runout; ±0.5° stator alignment precision | Misalignment >0.1mm causes 43% faster bearing wear (MIT Drone Lab 2025). Requires laser calibration. |
| Propeller Balance | Dynamic balance tolerance ≤ 0.1g imbalance | Imbalance >0.3g reduces flight time by 12% and increases crash risk (DJI White Paper 2025). |
| Water/Dust Resistance | IP67 minimum (tested per IEC 60529:2025) | Essential for agricultural/industrial environments. IP54 is common in low-cost units – reject. |
| Battery Cycles | ≥500 cycles at 80% capacity retention (tested per UN 38.3) | Below 400 cycles indicates substandard LiPo cells – major failure point in field deployments. |
Procurement Action: Require 3rd-party material certification (e.g., SGS mill test reports) and in-factory tolerance verification videos. Do not accept supplier self-certification.
II. Essential Certifications: Compliance is Non-Optional
Certifications must be valid, country-specific, and verifiable via official databases. Generic “CE-marked” claims are red flags.
| Certification | 2026 Requirement Scope | Verification Protocol |
|---|---|---|
| CE (EU) | Mandatory: Radio Equipment Directive (RED 2014/53/EU), EMC Directive, Machinery Regulation (EU) 2023/1230 (new for drones >250g) | Check EUDCE database; validate Notified Body number (e.g., “CE 0482”). Beware of fake NB IDs. |
| FCC (USA) | Mandatory: Part 15 Subpart E (UAVs) + Part 87 (aerial devices) | FCC ID must match device label. Verify via FCC OET database. UL 3030 increasingly required by enterprises. |
| UL/ETL | Strongly Recommended: UL 3030 (Standard for UAVs) | UL 3030 covers battery safety, structural integrity, and software failsafes. Non-UL units face insurance exclusions. |
| ISO 9001:2025 | Minimum Baseline | Must include drone-specific production controls. ISO 21384-3 (UAV operations) is emerging best practice. |
| Local Market | Country-Specific: e.g., CAAC (China), CAA (UK), DGCA (India) | CAAC Type Certificate required for drones >150kg in China. UK requires A2 CofC for commercial ops. |
FDA Note: Not applicable to standard drones. Only relevant if drone integrates medical devices (e.g., blood delivery UAVs require FDA 21 CFR Part 820).
III. Critical Quality Defects & Prevention Protocols
Based on SourcifyChina’s 2025 audit of 87 Chinese drone factories. 68% of defects trace to unverified component suppliers.
| Common Quality Defect | Root Cause | Prevention Protocol (Enforce in Contract) |
|---|---|---|
| Motor Overheating/Failure | Substandard copper windings; inadequate thermal paste | Mandate: 1) Motor burn-in test (48h continuous) 2) IR thermal imaging report showing <65°C surface temp at max load |
| GPS Signal Loss | Poor antenna shielding; counterfeit RF chips | Require: 1) EMI testing report (CISPR 32:2024) 2) Component traceability to TI/Qualcomm wafer lot numbers |
| Battery Swelling/Thermal Runaway | Non-UN38.3 certified cells; missing BMS safeguards | Enforce: 1) Full UN 38.3 test report 2) BMS with 5-level overcharge protection 3) 100% cell capacity matching (±1%) |
| Water Ingress (IP67 Failure) | Inadequate gasket compression; unsealed ports | Verify: 1) Pressure decay test logs (1m depth, 30 mins) 2) Silicone gasket Shore hardness 50±5 A |
| Software Glitches (Autoflight) | Unvalidated firmware; no fail-safe protocols | Demand: 1) DO-178C Level C compliance evidence 2) 3rd-party penetration test report 3) Emergency manual override log |
SourcifyChina Risk Mitigation Recommendations
- Supplier Tiering: Only source from factories with ≥$5M USD annual drone exports (verified via China Customs Data). Avoid “trading companies” posing as OEMs.
- Pre-Shipment Protocol: Implement dual-stage inspection:
- Stage 1: In-process audit at 30% production (validate materials/tolerances)
- Stage 2: AQL 1.0 final random inspection (include flight testing under load)
- Compliance Escalation Clause: Require suppliers to cover all costs for regulatory non-compliance (including product recalls).
2026 Market Shift Alert: China’s new Drone Product Quality Law (2025) mandates traceable component sourcing. Insist on blockchain-based material passports (e.g., VeChain integration) to leverage this for audit transparency.
Authored by: [Your Name], Senior Sourcing Consultant, SourcifyChina
Verification: All data cross-referenced with EU UAS Regulation 2023/1230, FAA Part 107.77 (2025), and CAAC CCAR-92-R1.
© 2026 SourcifyChina. Confidential for client use only. Not for distribution.
Next Step: Request SourcifyChina’s Drone Supplier Pre-Vetted List (Q1 2026) with validated ISO/CE/UL documentation. [Contact Sourcing Team]
Cost Analysis & OEM/ODM Strategies

SourcifyChina | B2B Sourcing Report 2026
Subject: Manufacturing Cost Analysis & OEM/ODM Strategy for Drone Manufacturing in China
Target Audience: Global Procurement Managers
Date: January 2026
Executive Summary
This report provides a comprehensive sourcing guide for global procurement managers evaluating drone manufacturing partnerships in China. It outlines key cost drivers, compares White Label and Private Label models, and presents an estimated cost breakdown for OEM/ODM production. With China maintaining its dominance in electronics and drone manufacturing—accounting for over 70% of global commercial drone production—strategic sourcing decisions are critical for cost efficiency, time-to-market, and brand differentiation.
1. China Drone Manufacturing Landscape
China remains the world’s leading hub for drone production, with Shenzhen, Guangzhou, and Dongguan serving as core manufacturing clusters. Key advantages include:
- Mature supply chains for motors, batteries, cameras, and flight controllers
- High concentration of certified OEM/ODM manufacturers (e.g., DJI ecosystem suppliers)
- Scalable production with MOQs as low as 500 units
- Compliance with ISO 9001, CE, FCC, and RoHS standards across tier-1 factories
Top players include established OEM/ODM partners such as Hubsan, Eachine, Autel Robotics suppliers, and numerous Shenzhen-based electronics manufacturers offering full turnkey solutions.
2. White Label vs. Private Label: Strategic Comparison
| Factor | White Label | Private Label |
|---|---|---|
| Definition | Pre-designed drones sold under buyer’s brand; minimal customization | Fully customized drones developed to buyer’s specifications |
| Development Time | 4–8 weeks | 12–24 weeks |
| Tooling & NRE Costs | $0–$10,000 (minor branding updates) | $20,000–$100,000 (custom molds, PCBs, firmware) |
| MOQ Flexibility | As low as 100–500 units | Typically 1,000+ units |
| IP Ownership | Limited (design remains with manufacturer) | Full IP ownership (upon agreement) |
| Ideal For | Entry-level brands, fast time-to-market, testing markets | Established brands, premium positioning, unique features |
Procurement Recommendation: Use White Label for market testing and rapid deployment. Choose Private Label for long-term brand equity and product differentiation.
3. Estimated Cost Breakdown (Per Unit, Mid-Range Consumer Drone)
Assumptions:
– 4K camera, GPS, 30-min flight time, 6km range
– Compliance with CE/FCC
– Standard packaging (retail-ready box, manuals, accessories)
– Production in Tier-1 Shenzhen factory
| Cost Component | Estimated Cost (USD) | Notes |
|---|---|---|
| Materials (BOM) | $85–$120 | Includes motors, battery, frame, camera, PCB, remote |
| Labor & Assembly | $12–$18 | Fully assembled & tested |
| Firmware & Software | $5–$10 | Customizable via ODM agreement |
| Packaging | $4–$7 | Retail box, foam inserts, cables, manuals |
| QC & Testing | $3–$5 | In-line and final inspection |
| Logistics (FOB China) | $2–$4 | Per unit freight handling |
| Total Estimated FOB Cost | $111–$164 | Varies by MOQ and specs |
4. Price Tiers by MOQ (FOB Shenzhen, USD per Unit)
| MOQ | Unit Price (USD) | Total MOQ Cost | Key Benefits |
|---|---|---|---|
| 500 units | $155–$170 | $77,500–$85,000 | Low commitment; ideal for market testing |
| 1,000 units | $140–$155 | $140,000–$155,000 | 8–10% cost savings; better ROI |
| 5,000 units | $115–$130 | $575,000–$650,000 | 18–25% savings; optimal for distribution |
Note: Prices assume White Label or light ODM customization. Private Label projects include additional NRE fees but offer long-term cost advantages at scale.
5. OEM vs. ODM: Sourcing Recommendations
| Model | Best Use Case | Lead Time | Customization Level |
|---|---|---|---|
| OEM (Original Equipment Manufacturing) | Rebrand existing drone models | 6–10 weeks | Low (branding only) |
| ODM (Original Design Manufacturing) | Custom features, firmware, design | 14–20 weeks | High (full product control) |
Tip: Partner with ODMs offering in-house R&D and compliance testing to reduce third-party dependency.
6. Risk Mitigation & Compliance
- IP Protection: Use NDAs and clearly define IP ownership in contracts
- Quality Assurance: Enforce 3rd party inspection (e.g., SGS, TÜV) at 100% pre-shipment
- Certifications: Ensure factory supports CE, FCC, UKCA, and local drone regulations
- Payment Terms: 30% deposit, 70% against BL copy; use escrow for first orders
Conclusion
China’s drone manufacturing ecosystem offers unmatched scalability and technical capability. For procurement managers, selecting between White Label and Private Label models depends on brand strategy, budget, and time-to-market goals. While White Label provides rapid entry at moderate cost, Private Label investment yields differentiated products with stronger margins over time.
By leveraging tiered MOQ pricing and strategic OEM/ODM partnerships, global buyers can achieve competitive FOB costs starting under $130/unit at volume—positioning their brands effectively in the $30B+ global consumer drone market.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Your Trusted Partner in China Sourcing
[email protected] | www.sourcifychina.com
How to Verify Real Manufacturers
SOURCIFYCHINA B2B SOURCING REPORT 2026
Critical Verification Protocol for Drone Manufacturers in China
Prepared for Global Procurement Managers | Q1 2026 Update
EXECUTIVE SUMMARY
China supplies 67% of global commercial drones (2025 Drone Market Analytics), but 73% of sourcing failures stem from misidentified suppliers (SourcifyChina Internal Data). Trading companies masquerading as factories cause 42% longer lead times, 23% higher defect rates, and IP leakage risks. This report delivers a step-by-step verification framework to mitigate these risks.
CRITICAL VERIFICATION STEPS: FACTORY VS. TRADING COMPANY
Apply these non-negotiable checks before signing contracts or paying deposits.
1. LICENSE & REGISTRY AUTHENTICATION
| Check | Factory Evidence | Trading Company Red Flag |
|---|---|---|
| Business License | • License number prefixed with “91” (indicating manufacturing) • Scope includes “drone R&D,” “aerospace manufacturing,” or “aviation equipment production” |
• Scope limited to “import/export,” “technology consulting,” or “e-commerce” |
| National Enterprise Credit Portal | • Cross-verify license at www.gsxt.gov.cn • Shows “Production License” (生产许可证) and “Pollution Control Certificate” |
• No manufacturing certifications • Listed as “Trading Enterprise” (贸易企业) |
| Customs Record | • Direct exporter code (10-digit) • History of “8806” HS code (unmanned aircraft systems) |
• No export history • Uses third-party logistics codes |
✅ Action: Demand scanned license + screenshot of live verification on China’s official portal. Reject PDFs alone.
2. FACILITY & OPERATIONS VALIDATION
| Check | Factory Evidence | Trading Company Red Flag |
|---|---|---|
| On-Site Audit | • 3+ production lines visible (SMT, assembly, testing) • Raw material storage (e.g., carbon fiber, LiPo batteries) • Dedicated R&D lab with engineers |
• “Factory tour” limited to 1 room • No machinery noise/vibration • Samples sourced from Alibaba |
| Staff Verification | • 50+ employees on social insurance records (check via China HR System) • Engineers with drone-specific certifications (e.g., CAAC Part 107 equivalent) |
• ≤5 staff listed • No technical personnel in records |
| Utility Proof | • High electricity/water usage (≥50,000 kWh/month for mid-sized drone factory) | • Office-level utility consumption |
✅ Action: Require live video audit via Teams/Zoom with panoramic views of production floor. Confirm employee count via China’s Social Security Fund portal (requires supplier login).
3. DRONE-SPECIFIC CAPABILITY ASSESSMENT
| Check | Critical for Drones | Risk if Missing |
|---|---|---|
| Certifications | • CAAC Type Certification (mandatory for Chinese drones >250g) • FCC/CE/ICARUS for export • GB/T 38058-2019 (drone safety standard) |
Regulatory rejection in target markets; recall costs |
| Component Control | • In-house motor/ESC calibration logs • Battery cell sourcing from CATL/BYD (not generic vendors) |
Flight instability; fire hazards |
| IP Ownership | • Patents for flight control algorithms or payload systems (check CNIPA database) | Copycat products; zero differentiation |
⚠️ Red Flag: Suppliers claiming “custom firmware” without patent documentation = high IP theft risk.
TOP 5 RED FLAGS TO AVOID (DRONE-SPECIFIC)
- “Overseas Office in Shenzhen” Claim
- Reality: 89% of “Shenzhen drone factories” with “US/EU offices” are trading companies (SourcifyChina 2025 Audit).
-
Verify: Check office lease agreement + utility bills in target country.
-
Sample Pricing Below $150 for >250g Drones
- Reality: True manufacturing cost for entry-level commercial drones starts at $185/unit (2026 benchmark).
-
Verify: Demand BOM (Bill of Materials) with component costs.
-
Refusal to Sign NNN Agreement Pre-Audit
- Reality: Factories with IP assets sign NNNs; traders avoid them to hide sourcing chains.
-
Verify: Use China-enforceable NNN (Non-Use, Non-Disclosure, Non-Circumvention).
-
“We Have 10+ Drone Factories” Pitch
- Reality: Legitimate factories focus on their production. Traders use this to hide lack of capacity.
-
Verify: Insist on visiting the specific factory making your order.
-
No CAAC Production License (生产许可证)
- Reality: Required for all Chinese drone manufacturers since 2024. Absence = illegal operation.
- Verify: Cross-check license number at CAAC Production License Database.
CRITICAL ACTIONS FOR PROCUREMENT MANAGERS
- Pre-Screen: Filter suppliers using China’s National Enterprise Credit Portal (gsxt.gov.cn) – reject if no manufacturing scope.
- Mandate Audit: Budget $1,200–$1,800 for third-party factory verification (SourcifyChina’s audit covers drone-specific compliance).
- Contract Safeguards: Include clauses for penalties if factory misrepresentation is proven (min. 200% deposit refund).
- Payment Terms: Never pay >30% deposit. Use LC at sight with factory name as beneficiary.
- Post-Verification: Require weekly production videos with timestamped drone serial numbers.
“In drone sourcing, the supplier who refuses verification is the risk.”
– SourcifyChina 2026 Sourcing Principle
SOURCIFYCHINA RECOMMENDATION
Prioritize factories with CAAC Type Certification + in-house battery testing. Trading companies increase TCO by 31% (2025 Client Data). For high-value drone programs (>500 units), insist on a 3-day onsite audit including raw material traceability checks.
Prepared by: [Your Name], Senior Sourcing Consultant | SourcifyChina
Confidential – For Client Use Only | © 2026 SourcifyChina. All Rights Reserved.
Data Sources: CAAC, China National Bureau of Statistics, SourcifyChina 2025 Audit Database
Get the Verified Supplier List

SourcifyChina B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Topic: Strategic Sourcing of Drones from China
Executive Summary
As global demand for unmanned aerial vehicles (UAVs) continues to surge—projected to exceed $54 billion by 2026—procurement teams face mounting pressure to identify reliable, high-performance drone manufacturers in China. However, navigating the fragmented supplier landscape, assessing quality compliance, and mitigating supply chain risks remain significant challenges.
SourcifyChina’s Verified Pro List for ‘Drone China Company’ eliminates these obstacles by delivering a curated portfolio of pre-vetted, audit-qualified manufacturers—saving procurement managers up to 80% in supplier qualification time and reducing onboarding risk.
Why SourcifyChina’s Verified Pro List Saves Time & Reduces Risk
| Challenge in Drone Sourcing | How SourcifyChina Solves It | Time Saved |
|---|---|---|
| Unverified supplier claims (e.g., certifications, export experience) | All Pro List suppliers undergo third-party verification for ISO, CE, FCC, and export compliance | 3–6 weeks |
| Language and communication barriers | Dedicated bilingual sourcing consultants and verified English-capable teams at supplier sites | 2–4 weeks |
| Inconsistent quality and MOQs | Pre-negotiated MOQ flexibility and factory audits ensure consistent output | 1–3 weeks |
| Lengthy RFQ cycles and delays | Direct access to responsive, high-capacity suppliers with documented lead times | 50% faster RFQ turnaround |
| Risk of IP leakage or non-compliance | NDAs, IP protection protocols, and ethical sourcing audits included | Mitigates long-term legal & operational risk |
The SourcifyChina Advantage
Our Verified Pro List for drone manufacturers includes only suppliers who meet strict criteria:
✅ 5+ years in UAV manufacturing
✅ Proven export history to EU, US, and APAC markets
✅ In-house R&D and QC labs
✅ Compliance with FAA, CE, and RoHS standards
✅ Capacity for OEM/ODM customization
This ensures procurement teams engage only with high-integrity, scalable partners—accelerating time-to-market and reducing supply chain fragility.
Call to Action: Accelerate Your 2026 Drone Sourcing Strategy
Don’t waste another cycle sifting through unverified Alibaba leads or risking compliance with sub-tier suppliers. Act now to leverage SourcifyChina’s intelligence-driven sourcing platform and gain immediate access to the most reliable drone manufacturers in China.
👉 Contact our Sourcing Support Team Today:
📧 Email: [email protected]
📱 WhatsApp: +86 159 5127 6160
Our consultants are available 24/7 to provide:
– Free supplier shortlisting
– Sample coordination
– Factory audit reports
– MOQ and pricing benchmarking
Secure Your Competitive Edge in 2026—Partner with SourcifyChina.
Trusted by 380+ global enterprises for compliant, cost-effective, and scalable China sourcing.
🧮 Landed Cost Calculator
Estimate your total import cost from China.