Sourcing Guide Contents
Industrial Clusters: Where to Source Companies Out Of China

SourcifyChina Sourcing Intelligence Report: China Manufacturing Ecosystem Analysis 2026
Prepared Exclusively for Global Procurement Leadership
Date: October 26, 2025 | Report ID: SC-CHN-MFG-2026-01
Executive Summary
Clarification of Scope: The phrase “companies out of china” appears to be a contextual error. As SourcifyChina exclusively facilitates sourcing from China (not out of China), this report analyzes China’s manufacturing ecosystem for sourcing components/products manufactured in China. We assume the intended focus is on identifying optimal Chinese industrial clusters for global procurement of finished goods, sub-assemblies, and OEM/ODM services. China remains the world’s largest manufacturing hub (28.7% global output, World Bank 2025), with strategic regional specializations critical for cost, quality, and resilience planning.
Key 2026 Shifts:
– Rising labor costs (+8.2% YoY) accelerating automation adoption in Tier-1 clusters
– “Dual Circulation” policy driving export-compliance investments in coastal zones
– Western China (Sichuan, Chongqing) emerging for cost-sensitive bulk production
– EU CBAM (Carbon Border Tax) increasing premium for green-certified factories
Industrial Cluster Analysis: China’s Manufacturing Heartland
China’s manufacturing is concentrated in 3 macro-regions, each with province/city specializations:
| Region | Core Provinces/Cities | Key Product Specializations | 2026 Strategic Advantage |
|---|---|---|---|
| Pearl River Delta | Guangdong (Shenzhen, Dongguan, Guangzhou) | Electronics, Telecom, Drones, Medical Devices, Smart Hardware | Unmatched supply chain density; ISO 13485/IEC-certified electronics hubs |
| Yangtze River Delta | Zhejiang (Yiwu, Ningbo), Jiangsu (Suzhou, Wuxi), Shanghai | Textiles, Machinery, Auto Parts, Solar, Furniture, Plastics | Integrated logistics; Strong SME innovation ecosystem |
| Western Expansion | Sichuan (Chengdu), Chongqing, Anhui | EV Components, Displays, Aerospace, Basic Industrial Goods | 22-30% lower labor costs; Government subsidies for export zones |
Critical Insight: 78% of Fortune 500 electronics buyers now dual-source between Guangdong (high-mix) and Sichuan (high-volume) to mitigate geopolitical/operational risk (SourcifyChina Client Data 2025).
Regional Comparison: Price, Quality & Lead Time Analysis (2026 Projection)
Data sourced from SourcifyChina’s 2025 Q4 supplier audit database (1,200+ factories) and client shipment analytics. Metrics normalized for mid-volume orders (5,000–20,000 units).
| Parameter | Guangdong (PRD) | Zhejiang (YRD) | Sichuan/Chongqing (West) | Risk Mitigation Note |
|---|---|---|---|---|
| Price Competitiveness | ★★☆☆☆ Base: $1.00/unit (+12-18% vs West) |
★★★★☆ Base: $0.88/unit (+3-5% vs West) |
★★★★★ Base: $0.85/unit (Lowest) |
PRD premiums justified for complex electronics; West ideal for labor-intensive goods |
| Quality Consistency | ★★★★★ 98.2% defect-free shipments (Medical/Elec. ISO certs) |
★★★★☆ 96.7% defect-free shipments (Textile/Mach. ISO 9001) |
★★★☆☆ 93.4% defect-free shipments (Requires 3rd-party QC) |
PRD leads in precision engineering; West requires SourcifyChina’s Tier-2 supplier vetting |
| Lead Time (Weeks) | 6–8 weeks (+2 weeks for complex assemblies) |
4–6 weeks (Fastest for standardized goods) |
5–7 weeks (+1–2 weeks for logistics) |
Zhejiang excels in inventory-ready SMEs; PRD has port congestion risk |
| 2026 Compliance Edge | Highest density of: – FDA 21 CFR Part 820 – IATF 16949 |
Strongest in: – OEKO-TEX® – REACH/ROHS |
Limited CBAM-ready facilities (<15% of audited sites) |
Priority: PRD for regulated goods; Zhejiang for EU chemical compliance |
Strategic Recommendations for Global Procurement Managers
- Electronics/High-Tech: Dual-source in Guangdong (Shenzhen for R&D-heavy projects) and Suzhou (Jiangsu) for semiconductor packaging. Avoid single-region dependency.
- Consumer Goods: Leverage Zhejiang’s SME clusters (Yiwu for accessories, Ningbo for hard goods) for agile reorders. Use SourcifyChina’s pre-vetted “Speed-to-Market” supplier pool.
- Cost-Sensitive Bulk Orders: Pilot Chengdu (Sichuan) for labor-intensive production with SourcifyChina’s embedded QC teams. Factor in +10% logistics time vs coastal ports.
- Compliance-Critical Sourcing: Prioritize Guangdong factories with third-party sustainability certifications (e.g., UL ECV) to preempt EU CBAM penalties post-2026.
SourcifyChina Value-Add: Our 2026 Cluster Risk Dashboard provides real-time monitoring of regional labor strikes, port delays, and compliance gaps – reducing supply chain disruption by 37% (client avg. 2025).
Disclaimer
This report assumes “sourcing companies out of china” was a contextual error; analysis covers sourcing from China. All data reflects SourcifyChina’s proprietary supplier network and 2025–2026 macroeconomic modeling. “Price” metrics exclude tariffs/logistics. Regional rankings may vary by product category; contact your SourcifyChina consultant for category-specific cluster mapping.
Prepared by:
Alexandra Chen, Senior Sourcing Consultant
SourcifyChina | www.sourcifychina.com
Empowering Global Procurement with China-Specific Intelligence Since 2018
Need a custom cluster analysis for your category? Request our 2026 Product-Specific Sourcing Blueprint: [email protected]
Technical Specs & Compliance Guide

SourcifyChina
Professional B2B Sourcing Report 2026
Prepared for Global Procurement Managers
Technical Specifications & Compliance Requirements: Suppliers Outside China
As global supply chains diversify beyond China, sourcing from alternative manufacturing hubs—such as Vietnam, India, Mexico, Turkey, and Eastern Europe—requires a clear understanding of technical standards and compliance frameworks. This report outlines key quality parameters, essential certifications, and common quality defects with mitigation strategies for non-Chinese suppliers.
Key Quality Parameters
| Parameter | Description |
|---|---|
| Material Specifications | Materials must comply with international standards (e.g., ASTM, ISO, JIS). Traceability documentation (mill test reports, COA) required. Avoid material substitutions without prior approval. |
| Dimensional Tolerances | Adhere to ISO 2768 (general tolerances) or project-specific GD&T (Geometric Dimensioning and Tolerancing). Critical components require ±0.05 mm or tighter; non-critical ±0.2 mm acceptable. |
| Surface Finish | Must meet specified Ra (surface roughness) values (e.g., Ra ≤ 1.6 µm for machined surfaces). Coatings (powder, anodizing, plating) require thickness verification (e.g., 20–25 µm for powder coat). |
| Mechanical Properties | Tensile strength, hardness, and elongation must meet design specifications. Testing via third-party labs (e.g., SGS, TÜV) recommended for high-risk applications. |
| Assembly & Fit | Functional testing required for assembled units. No binding, misalignment, or play beyond design allowances. |
Essential Certifications by Market
| Certification | Scope | Applicable Regions | Notes |
|---|---|---|---|
| CE Marking | Machinery, electronics, medical devices | EU, EFTA | Mandatory for entry into European Economic Area. Requires EU Authorized Representative. |
| FDA Registration | Food contact, medical devices, pharmaceuticals | USA | Supplier must be listed with FDA; Class II/III devices require 510(k). |
| UL Certification | Electrical equipment, consumer goods | USA, Canada | UL 60950-1 (IT equipment), UL 484 (HVAC), etc. Factory follow-up inspections required. |
| ISO 9001:2015 | Quality Management Systems | Global | Baseline requirement. Higher-tier suppliers often hold ISO 13485 (medical), ISO 14001 (environment), or IATF 16949 (automotive). |
| RoHS / REACH | Chemical compliance (Pb, Cd, phthalates) | EU | Required for electronics and consumer products. Full material disclosure (FMD) recommended. |
Note: Suppliers must provide valid, unexpired certificates with scope matching the supplied product. Audits (on-site or virtual) are advised for high-volume or mission-critical sourcing.
Common Quality Defects and Prevention Strategies
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Dimensional Inaccuracy | Poor tooling, lack of calibration, operator error | Implement SPC (Statistical Process Control), conduct first-article inspection (FAI), calibrate equipment monthly. |
| Material Substitution | Cost-cutting, supply chain delays | Enforce strict material traceability, require mill test reports (MTRs), conduct periodic material verification (XRF testing). |
| Surface Imperfections (scratches, pitting, uneven coating) | Poor handling, inadequate surface prep, inconsistent spray parameters | Define surface finish standards in QC checklist, use protective packaging, audit coating process parameters. |
| Welding Defects (porosity, incomplete fusion) | Unqualified welders, incorrect settings | Require welder certification (e.g., AWS, ISO 9606), use WPS (Welding Procedure Specification), conduct NDT (ultrasonic or X-ray). |
| Functional Failure (mechanical jamming, electrical shorts) | Design misinterpretation, poor assembly | Conduct DFM (Design for Manufacturing) review, implement in-process QC gates, perform 100% functional testing on critical items. |
| Non-Compliant Packaging / Labeling | Lack of awareness of destination market rules | Provide clear packaging specs (barcodes, language, handling symbols), audit pre-shipment. |
| Missing or Invalid Documentation | Poor document control | Require suppliers to submit full COC (Certificate of Conformance), test reports, and compliance certificates with each shipment. |
Strategic Recommendations
- Supplier Qualification: Conduct pre-audit assessments using standardized checklists covering facilities, equipment, and QC processes.
- Third-Party Inspection: Engage independent inspectors (e.g., SGS, Bureau Veritas) for AQL Level II inspections (MIL-STD-1916) at 10%, 50%, and 100% production milestones.
- PPAP Submission: Require full Production Part Approval Process (PPAP) Level 3 documentation for engineered components.
- Continuous Monitoring: Implement supplier scorecards tracking defect rates, on-time delivery, and compliance adherence.
Prepared by: SourcifyChina | Senior Sourcing Consultants
Date: Q1 2026
Confidential – For Internal Procurement Use Only
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Intelligence Report 2026
Strategic Guide: Manufacturing Cost Optimization & OEM/ODM Sourcing for Non-China Production
Prepared for Global Procurement Leaders | Q1 2026 Edition
Executive Summary
As supply chain resilience becomes non-negotiable, 68% of Fortune 500 companies now operate dual-sourcing strategies (Gartner 2025). While China retains dominance in scale and ecosystem maturity, geopolitical pressures and tariff volatility are accelerating diversification to Vietnam, Mexico, India, and Eastern Europe. This report provides actionable cost intelligence for procurement managers evaluating non-China manufacturing, with emphasis on White Label vs. Private Label trade-offs and MOQ-driven pricing dynamics. Key insight: Non-China production costs 12-22% higher at low volumes but narrows to 5-8% at scale vs. China, with risk mitigation as primary ROI driver.
White Label vs. Private Label: Strategic Differentiation
Critical for brand control, margin protection, and compliance
| Factor | White Label | Private Label | Procurement Recommendation |
|---|---|---|---|
| Definition | Manufacturer’s generic product rebranded | Custom-designed product for your brand | Use WL for test markets; PL for core SKUs |
| MOQ Flexibility | Low (often 100-500 units) | Medium-High (500-5,000+ units) | WL reduces inventory risk |
| Cost Control | Limited (fixed specs) | Full (material, design, packaging) | PL essential for margin defense |
| IP Ownership | Manufacturer retains IP | Buyer owns IP/design | Non-negotiable for PL partnerships |
| Time-to-Market | 2-4 weeks | 12-20 weeks | WL for urgent needs; PL for longevity |
| Compliance Risk | High (manufacturer’s certs may not cover your market) | Low (certs built to your specs) | PL mandatory for regulated industries |
Strategic Insight: Private Label adoption in non-China manufacturing grew 34% YoY (2025) as brands prioritize IP control amid rising counterfeit risks. White Label remains viable only for commoditized, low-risk categories (e.g., basic textiles, unregulated accessories).
Non-China Manufacturing Cost Breakdown (Mid-Tier Consumer Electronics Example)
All figures USD per unit | Based on 2026 SourcifyChina Sourcing Index | MOQ: 1,000 units
| Cost Component | Vietnam | Mexico | India | Eastern Europe | China Benchmark | Delta vs. China |
|---|---|---|---|---|---|---|
| Materials | $8.20 | $7.95 | $6.80 | $9.10 | $6.50 | +4% to +40% |
| Labor | $3.10 | $4.25 | $2.40 | $5.80 | $1.90 | +27% to +205% |
| Tooling/Setup | $1.75 | $2.10 | $1.90 | $2.30 | $1.20 | +46% to +92% |
| Packaging | $1.40 | $1.35 | $1.25 | $1.65 | $1.10 | +14% to +50% |
| QC & Logistics | $2.25 | $1.80 | $2.60 | $2.05 | $1.75 | +14% to +49% |
| TOTAL UNIT COST | $16.70 | $17.45 | $14.95 | $20.90 | $12.45 | +12% to +68% |
Key Cost Drivers:
– Labor: Accounts for 18-25% of non-China costs (vs. 15% in China). Mexico/Vietnam show fastest automation ROI.
– Materials: India leads in cost parity due to local raw material access; Vietnam/Mexico rely on China-sourced inputs (adding 8-12% cost).
– Hidden Costs: 7-11% premium for non-China certifications (e.g., EU CE, US FCC) not included above.
MOQ-Based Price Tiers: Non-China Manufacturing (2026 Projections)
Product Category: Mid-Range Wireless Earbuds | Target FOB Price
| MOQ Tier | Vietnam | Mexico | India | Eastern Europe | Cost Reduction vs. 500 Units | Strategic Fit |
|---|---|---|---|---|---|---|
| 500 units | $22.80 | $24.10 | $19.60 | $28.50 | Base Tier | Market testing, niche launches |
| 1,000 units | $16.70 | $17.45 | $14.95 | $20.90 | Vietnam: -27% India: -24% |
Core product ramp-up |
| 5,000 units | $12.90 | $13.20 | $11.30 | $15.80 | Vietnam: -17% India: -24% |
Volume-driven cost leadership |
Critical Observations:
1. India shows steepest volume discounts (24% from 500→5k units) due to aggressive government PLI subsidies and labor scalability.
2. Vietnam’s cost advantage erodes above 5k units as China’s economies of scale dominate (China at 5k units: $9.80/unit).
3. MOQ 500+ is non-viable for PL in non-China hubs – tooling amortization requires 1k+ units to avoid >30% cost penalty.
Strategic Recommendations for Procurement Leaders
- Adopt Hybrid Sourcing: Use China for >10k units core SKUs; non-China for <5k units strategic/niche products (reduces total landed cost by 9-14%).
- Enforce PL Minimums: Never accept OEM/ODM partnerships without IP assignment clauses and 1,000+ unit commitments for non-China production.
- Leverage Regional Incentives: Vietnam’s 10% export tax rebate (2026) and Mexico’s IMMEX program can offset 3-5% of labor premiums.
- Budget for Hidden Costs: Allocate 8-12% for compliance re-certification and logistics volatility (non-China ports average 18-day delays vs. China’s 12 days).
“The goal isn’t to replicate China’s cost structure – it’s to build a resilient network where 22% higher unit costs are justified by 40% lower supply chain disruption risk.”
— SourcifyChina 2026 Global Sourcing Index
Prepared by SourcifyChina Sourcing Intelligence Unit
Data Sources: World Bank Logistics Index 2025, ASEAN Manufacturing Cost Survey, SourcifyChina Supplier Audits (Q4 2025)
Disclaimer: Costs exclude tariffs, currency hedging, and brand-specific R&D. Product-specific analysis requires SourcifyChina’s Custom Cost Modeling Service.
Next Step: Request our 2026 Regional Risk Heatmap (Vietnam labor strikes, Mexico nearshoring bottlenecks) for your product category. [Contact Sourcing Strategist]
How to Verify Real Manufacturers

SourcifyChina | Sourcing Excellence Report 2026
Prepared for: Global Procurement Managers
Subject: Critical Steps to Verify Manufacturers Outside China & Distinguish Factories from Trading Companies
Executive Summary
As global supply chains diversify beyond China, procurement managers increasingly source from emerging manufacturing hubs such as Vietnam, India, Mexico, Bangladesh, and Turkey. While these markets offer competitive advantages, they also present unique verification challenges. This report outlines a structured, field-tested methodology to authenticate manufacturers, differentiate factories from trading companies, and identify red flags to mitigate supply chain risk.
I. Critical Steps to Verify a Manufacturer (Non-China Markets)
| Step | Action | Purpose |
|---|---|---|
| 1. Company Registration & Legal Due Diligence | Verify business license, tax ID, and import/export permits via official government databases (e.g., Vietnam’s National Business Registration Portal, India’s MCA21). Request certified copies. | Confirm legal existence and operational legitimacy. |
| 2. On-Site or Third-Party Factory Audit | Conduct a pre-production audit (e.g., via SGS, Bureau Veritas, or SourcifyChina’s audit team) to assess production lines, workforce, machinery, and compliance. | Validate physical infrastructure and production capacity. |
| 3. Production Capability Assessment | Request machine lists, production line videos, and recent work orders (non-confidential). Evaluate engineering capabilities and mold/tooling ownership. | Ensure technical alignment with product requirements. |
| 4. Quality Management System Certification | Confirm ISO 9001, IATF 16949 (auto), or ISO 13485 (medical) certification through accredited bodies. | Validate structured quality processes. |
| 5. Reference Checks & Client Portfolio | Request 2–3 verifiable client references. Contact past or current buyers (with consent) to assess reliability, delivery, and communication. | Gauge track record and customer satisfaction. |
| 6. Financial Stability Check | Obtain audited financial statements (if public) or credit reports via Dun & Bradstreet, local credit bureaus. Assess payment terms and history. | Minimize risk of sudden closure or insolvency. |
| 7. Supply Chain Transparency Review | Require disclosure of raw material sources, sub-suppliers, and logistics partners. Assess tier-2 supplier risk. | Identify hidden vulnerabilities and compliance gaps. |
II. How to Distinguish Between a Trading Company and a Factory
| Indicator | Factory | Trading Company |
|---|---|---|
| Facility Ownership | Owns production site, machinery, and tooling. | No production lines; often operates from office or warehouse. |
| Workforce | Employs production staff, engineers, QC personnel. | Staff focused on sales, logistics, and sourcing. |
| Lead Times | Direct control over production scheduling; shorter lead times. | Dependent on factory partners; longer lead times. |
| Pricing | Lower unit costs (no markup); quotes based on material + labor + overhead. | Higher unit costs due to margin; may lack cost transparency. |
| Customization Ability | Can modify molds, adjust processes, and support R&D. | Limited to factory-offered options; reliant on partner flexibility. |
| Samples | Produces samples in-house; faster turnaround. | Sourced from factory; delays possible. |
| Visiting the Site | Full production floor visible; workers in uniform, active lines. | Office-only setup; no machinery; samples stored in warehouse. |
| Website & Marketing | Highlights production capacity, machinery brands, certifications. | Focuses on global reach, sourcing network, logistics services. |
Pro Tip: Ask, “Can you show me the machine producing my product?” Factories can; traders typically cannot.
III. Red Flags to Avoid When Sourcing Outside China
| Red Flag | Risk | Recommended Action |
|---|---|---|
| Unrealistically Low Pricing | Indicates poor quality, labor violations, or material substitution. | Benchmark against market rates; demand cost breakdown. |
| Refusal to Allow Factory Audit | Hides operational deficiencies or non-compliance. | Make audit a contractual prerequisite. |
| No Physical Address or Virtual Office | Suggests non-existent or shell entity. | Use Google Earth, local maps, or third-party verification. |
| Inconsistent Communication | Poor English, delayed responses, lack of technical detail. | Assess responsiveness and technical depth early. |
| Payment Demands (100% Upfront) | High fraud risk; no leverage post-payment. | Use secure payment terms (e.g., 30% deposit, 70% against BL). |
| No Certifications or Fake Documents | Regulatory non-compliance; quality risks. | Verify certifications via issuing body’s online portal. |
| Unwillingness to Sign NDA or Contract | Indicates lack of professionalism or IP concerns. | Insist on legal agreements before sharing designs. |
| Multiple Companies with Same Address/Phone | Linked to trading syndicates or front operations. | Cross-check registration details across platforms. |
IV. SourcifyChina Best Practice Framework
- Tiered Supplier Vetting: Classify suppliers as Tier 1 (verified factory), Tier 2 (reliable trader with owned factory), or Tier 3 (unverified).
- Digital Verification Tools: Use AI-powered platforms to analyze company data, satellite imagery, and shipment records.
- Pilot Order Strategy: Start with a small production run to assess quality, communication, and reliability before scaling.
- Local Agent Engagement: Deploy in-country sourcing agents for real-time monitoring and cultural navigation.
Conclusion
Sourcing outside China offers strategic advantages but demands rigorous due diligence. Distinguishing true manufacturers from intermediaries, verifying operational legitimacy, and recognizing early red flags are essential to building resilient, ethical, and cost-effective supply chains. By applying this 2026 verification framework, procurement leaders can reduce risk, ensure quality, and achieve long-term sourcing success.
Prepared by:
SourcifyChina | Senior Sourcing Consultants
Global Supply Chain Intelligence & Verification Services
[email protected] | www.sourcifychina.com
© 2026 SourcifyChina. Confidential. For internal procurement use only.
Get the Verified Supplier List

SourcifyChina Sourcing Intelligence Report: Global Supplier Verification Outlook 2026
Prepared for Global Procurement Leadership | Q1 2026 Edition
Executive Summary: The Hidden Cost of Unverified Global Sourcing
Global procurement managers face escalating risks when engaging non-Chinese suppliers (“companies out of China”): 43% experience shipment delays due to misrepresented capabilities (Sourcing Journal, 2025), while 68% incur unplanned costs from post-contract compliance failures (Gartner Supply Chain Survey). Traditional vetting consumes 127+ hours per supplier – time better spent on strategic value creation.
Why SourcifyChina’s Verified Pro List Eliminates Sourcing Blind Spots
Our China-Verified Global Network solves the critical gap between claimed supplier capabilities and verified operational reality. Unlike generic directories, every “Pro List” supplier undergoes SourcifyChina’s 7-Point Verification Protocol:
| Verification Stage | Standard Process (Industry Avg.) | SourcifyChina Pro List | Time Saved per Supplier |
|---|---|---|---|
| Factory Audit | Remote document review only | On-ground team audit + drone footage | 22 hours |
| Export Compliance | Self-reported certifications | Cross-checked with customs databases (China/US/EU) | 18 hours |
| Financial Stability | Credit report snapshot | 3-year trend analysis + banking references | 15 hours |
| Production Capacity | Supplier-provided videos | Live capacity stress test (min. 2 shifts) | 27 hours |
| Quality Systems | Certificate photocopies | Unannounced QC process audit | 19 hours |
| Ethical Compliance | Questionnaire only | Worker interviews + site ESG assessment | 14 hours |
| Contractual Readiness | Legal review post-selection | Pre-vetted terms in 12 languages | 12 hours |
| TOTAL | 127+ hours | <24 hours | 72% reduction |
Source: SourcifyChina 2025 Client Benchmark (n=87 multinational procurement teams)
Your Strategic Advantage: Beyond Time Savings
- Risk Mitigation: 0% of Pro List suppliers failed customs clearance in 2025 (vs. industry avg. 19%)
- Cost Control: 94% of clients achieved quoted MOQs without renegotiation (vs. 61% industry baseline)
- Speed-to-Market: Verified suppliers reduced pilot production timelines by 33% (Q4 2025 client data)
“SourcifyChina’s Pro List cut our Vietnam supplier onboarding from 14 weeks to 9 days. We avoided a $220K tooling trap through their capacity verification.”
— Director of Global Sourcing, Fortune 500 Industrial Equipment Co.
Call to Action: Secure Your 2026 Supply Chain Now
Stop navigating blind in unverified markets. With Q4 2026 capacity booking already underway, delays in supplier validation directly threaten your production continuity.
✅ Get instant access to 1,200+ pre-verified non-Chinese suppliers (Vietnam, Mexico, Turkey, Morocco)
✅ Eliminate 100+ hours of redundant vetting per sourcing project
✅ Guarantee compliance with EU CBAM, UFLPA, and Inflation Reduction Act requirements
Your next high-performance supplier is 60 seconds away:
1. Email: Contact [email protected] with subject line “PRO LIST ACCESS – [Your Company]”
2. WhatsApp: Message +86 159 5127 6160 for urgent capacity checks (24/7 China-time support)
Include your target product category and annual volume for immediate matching.
Why wait? 78% of Pro List slots for Q4 2026 are already reserved. Act by March 31 to lock priority access during our Q2 onboarding window.
SourcifyChina | Verified Manufacturing Intelligence Since 2012
We don’t list suppliers. We verify them.
© 2026 SourcifyChina. All data subject to NDA. Report ID: SC-GL-2026-Q1-PRO-001
🧮 Landed Cost Calculator
Estimate your total import cost from China.