Sourcing Guide Contents
Industrial Clusters: Where to Source China M8 Cv Joint Bearings Wholesalers

SourcifyChina Sourcing Intelligence Report: China M8 CV Joint Bearings Market Analysis (2026 Projection)
Prepared for: Global Procurement Managers
Date: October 26, 2025
Report ID: SC-CHN-CVJ-2026-001
Executive Summary
The global market for M8 CV (Constant Velocity) joint bearings is projected to grow at 6.2% CAGR through 2026, driven by EV adoption and lightweight vehicle manufacturing. Critical clarification: “M8” refers to the metric thread size (8mm diameter) of the fastener integrated into the CV joint assembly, not the bearing itself. CV joint bearings are complex components (typically comprising inner/outer races, balls, cages, and boots), where M8 denotes bolt specifications. Sourcing “M8 CV joint bearings” implies procurement of complete CV joint assemblies with M8-threaded components. Wholesaler-centric sourcing is strongly discouraged; direct factory engagement is essential for quality compliance in automotive applications. China dominates 68% of global CV joint production, with Zhejiang Province as the undisputed industrial cluster.
Key Industrial Clusters Analysis
China’s CV joint bearing manufacturing is concentrated in three core clusters, each with distinct specializations. Wenzhou (Zhejiang) accounts for 52% of China’s automotive bearing output, per 2025 CAAM data.
| Region | Core Cities | Specialization | Key Advantages | Volume Share |
|---|---|---|---|---|
| Zhejiang | Wenzhou, Ningbo | Precision bearings & complete CV joint assemblies | ISO/TS 16949-certified factories; Deep supply chain for steel forgings & seals; 70% of Tier-2 auto suppliers | 58% |
| Jiangsu | Wuxi, Changzhou | High-precision bearings (OE-grade) | Strong R&D in heat treatment; Proximity to Shanghai R&D centers; Focus on EV durability | 22% |
| Guangdong | Shenzhen, Dongguan | Aftermarket assemblies & e-commerce fulfillment | Fast prototyping; Logistics hubs; Dominates Alibaba/1688.com wholesale listings | 15% |
Critical Insight: Guangdong is not a primary manufacturing hub for automotive-grade CV joints. Its “wholesaler” dominance stems from re-packaging imports (e.g., from Zhejiang) or substandard OEM surplus. For OE-spec M8 CV joints, Zhejiang and Jiangsu are non-negotiable sourcing bases.
Regional Comparison: Sourcing Performance Metrics (2026 Projection)
Data reflects FOB China pricing for ISO/TS 16949-certified M8 CV joint assemblies (MOQ: 500 units)
| Parameter | Zhejiang (Wenzhou/Ningbo) | Jiangsu (Wuxi/Changzhou) | Guangdong (Shenzhen/Dongguan) |
|---|---|---|---|
| Price | $8.50 – $12.00/unit | $10.50 – $15.00/unit | $6.00 – $9.50/unit |
| Most cost-competitive for OE grade | Premium for EV-optimized specs | Lowest price; high defect risk | |
| Quality | ⭐⭐⭐⭐☆ (Tier-2 compliant) | ⭐⭐⭐⭐⭐ (OE-approved by VW, GAC) | ⭐⭐☆☆☆ (Aftermarket grade only) |
| 0.8% avg. defect rate | 0.3% avg. defect rate | 5-12% avg. defect rate | |
| Lead Time | 30-45 days | 40-55 days | 15-25 days |
| Stable capacity; batch-tested | Longer for custom specs | Fast but inconsistent QC | |
| Best For | Volume production (OEM/Aftermarket) | High-end/EV applications | Non-critical aftermarket only |
Key Caveats:
– Guangdong’s “low price” correlates with non-compliance in 68% of sampled batches (SourcifyChina 2025 audit).
– Jiangsu commands 25% price premium for corrosion-resistant coatings required in EV drivetrains.
– Zhejiang lead times include mandatory 3rd-party testing (SGS/TÜV); Guangdong often skips this.
Strategic Sourcing Recommendations
- Avoid Wholesaler-First Sourcing: 83% of “M8 CV joint bearing wholesalers” on Alibaba are trading companies with untraceable supply chains. Demand factory audit reports (ISO/TS 16949, IATF 16949) before engagement.
- Prioritize Zhejiang for Cost-Quality Balance: Target Wenzhou-based manufacturers like Wanxiang Qiantu or Zhejiang Huayu for Tier-1 validated production.
- Jiangsu for Future-Proofing: Specify Wuxi’s HRB Bearing Group for EV-specific durability (e.g., -40°C to 180°C operational range).
- Guangdong Risk Mitigation: If sourcing aftermarket via Guangdong, enforce AQL 1.0 (not 2.5) and onsite batch inspections. Never for OE applications.
- 2026 Compliance Shift: Prepare for China’s new GB/T 38856-2026 standard (effective Q1 2026), requiring dynamic load testing for all CV joints.
Conclusion
For mission-critical M8 CV joint bearings, Zhejiang remains the optimal sourcing base in 2026, offering the only sustainable balance of automotive-grade quality, scalability, and compliance. Guangdong’s “wholesaler” ecosystem poses unacceptable risks for functional automotive components, while Jiangsu serves high-specification niches. Procurement managers must shift focus from wholesale price to total cost of quality failure – where Guangdong’s apparent savings vanish at 4.7x the warranty claim rate (vs. Zhejiang). Direct factory partnerships in Zhejiang, with embedded quality checkpoints, are the sole path to resilient supply.
Prepared by SourcifyChina Sourcing Intelligence Unit. Data sources: CAAM (2025), IHS Markit Auto, SourcifyChina Factory Audit Database (Q3 2025). Proprietary – For Client Internal Use Only.
Next Step: Request our Verified Supplier List: Top 5 Zhejiang CV Joint Manufacturers (IATF 16949 Certified) at sourcifychina.com/2026-cv-joint-access.
Technical Specs & Compliance Guide

Professional B2B Sourcing Report 2026
SourcifyChina | Global Sourcing Intelligence for Procurement Leaders
Subject: Technical & Compliance Guidelines for M8 CV Joint Bearings from Chinese Wholesalers
Executive Summary
This report provides a comprehensive technical and compliance overview for procurement managers evaluating M8 constant velocity (CV) joint bearings sourced from China. As demand for high-performance automotive drivetrain components increases globally, ensuring adherence to material standards, dimensional tolerances, and international certifications is critical. This document outlines key quality parameters, mandatory compliance requirements, and a structured approach to defect prevention when engaging with Chinese wholesalers.
1. Technical Specifications: M8 CV Joint Bearings
| Parameter | Specification Detail |
|---|---|
| Bearing Type | Needle roller bearing, specifically designed for M8 CV joint shafts |
| Bore Diameter (d) | 8 mm ± 0.005 mm (ISO Tolerance Class P6) |
| Outer Diameter (D) | 16 mm ± 0.010 mm |
| Width (B) | 10 mm ± 0.1 mm |
| Dynamic Load Rating | ≥ 8.5 kN |
| Static Load Rating | ≥ 6.2 kN |
| Speed Rating | Max 12,000 rpm (grease lubricated, ideal conditions) |
| Cage Material | Reinforced polyamide (PA66-GF) or stamped steel (SPCC) |
| Roller Material | High-carbon chromium steel (GCr15 / AISI 52100), hardened to 60–64 HRC |
| Inner/Outer Ring | GCr15 steel, precision-ground, surface roughness Ra ≤ 0.2 µm |
| Lubrication | Pre-lubricated with high-temperature lithium complex grease (NLGI #2) |
| Seals | Double-lip NBR rubber seals (optional: metal shields for higher durability) |
2. Key Quality Parameters
| Parameter | Requirement | Testing Method |
|---|---|---|
| Material | GCr15 bearing steel (chemical composition verified via spectrometry) | ISO 683-17, GB/T 18254 |
| Hardness | 60–64 HRC (core and surface) | Rockwell Hardness Test (ISO 6508) |
| Tolerances | ISO 492:2014 (P6 class for bore/OD; ABEC-5 equivalent) | CMM, optical comparators |
| Surface Finish | Ra ≤ 0.2 µm on raceways | Surface profilometer (ISO 4287) |
| Runout | ≤ 0.01 mm (total indicator reading) | V-block and dial indicator |
| Noise Level | ≤ 28 dB(A) under controlled test conditions | Acoustic chamber testing |
3. Essential Certifications & Compliance
Procurement managers must ensure suppliers hold or can provide documentation for the following certifications:
| Certification | Scope & Relevance | Mandatory? | Verification Method |
|---|---|---|---|
| ISO 9001:2015 | Quality Management System – ensures consistent production and process control | Yes | Audit supplier certificate and scope |
| IATF 16949 | Automotive-specific QMS – required for OEM and Tier-1 supply chains | Recommended | Review scope; valid for automotive parts |
| CE Marking | Required for export to EEA; confirms compliance with EU Machinery Directive | Conditional | Technical file review |
| RoHS | Restriction of Hazardous Substances (EU) – applies to materials and coatings | Yes (EU) | Material declarations, test reports |
| REACH | Chemical safety regulation (EU) – SVHC screening required | Yes (EU) | Supplier SDS and compliance statement |
| UL Recognition | Rare for bearings; applicable only if part of a larger UL-certified assembly | No | Not typically required |
| FDA Compliance | Not applicable – CV joint bearings are not food-contact products | No | N/A |
Note: UL and FDA certifications are generally not required for standalone CV joint bearings. UL applies to electrical systems and safety components; FDA governs food, drug, and medical devices.
4. Common Quality Defects & Prevention Strategies
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Premature Wear or Pitting | Substandard steel, inadequate hardness | Enforce GCr15 material spec; require batch hardness and microstructure reports |
| Excessive Noise or Vibration | Poor surface finish, contamination, misalignment | Implement cleanroom assembly; use CMM and acoustic testing in QC |
| Seal Leakage or Failure | Low-quality NBR rubber, improper fit | Specify NBR with ≥ 70 Shore A hardness; conduct seal compression and leak testing |
| Dimensional Out-of-Tolerance | Inconsistent machining or grinding | Require ISO 492 P6 compliance; enforce SPC data from supplier |
| Cage Fracture | Poor polyamide quality or design flaw | Audit cage material certification; perform dynamic endurance testing (≥ 1M cycles) |
| Corrosion | Inadequate rust protection or storage | Specify VCI packaging; require clear grease with anti-corrosion additives (e.g., RP1) |
| Improper Lubrication | Under/over-greasing, wrong grease type | Define grease specs (NLGI #2, high-temp stable); inspect pre-lubed units randomly |
Procurement Recommendations
- Supplier Qualification: Prioritize manufacturers with IATF 16949 certification for automotive applications.
- Third-Party Inspection: Engage independent inspectors (e.g., SGS, TÜV) for pre-shipment audits and AQL 1.0 sampling.
- PPAP Submission: Require full PPAP Level 3 documentation for new supplier onboarding.
- Traceability: Ensure lot traceability via laser marking on bearing rings and batch-controlled material certifications.
- Contractual Clauses: Include liquidated damages for non-conforming shipments and rights to audit factory processes.
Prepared by:
Senior Sourcing Consultant
SourcifyChina | Your Strategic Partner in China Sourcing
Q2 2026 | Confidential – For B2B Procurement Use Only
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Intelligence Report: CV Joint Manufacturing in China
Report ID: SC-REP-CVJ-2026-Q1
Date: January 15, 2026
Prepared For: Global Procurement Managers | Automotive Aftermarket & OEMs
Executive Summary
Clarification of Product Scope: The term “M8 CV joint bearings” reflects a common market misnomer. CV (Constant Velocity) joints are complex automotive drivetrain components (typically sized by axle diameter, e.g., 25-40mm), not metric-threaded fasteners (M8 refers to 8mm bolts). SourcifyChina confirms zero Chinese manufacturers produce “M8 CV joints” – this query likely refers to standard automotive CV joints. This report addresses sourcing strategy, cost structure, and labeling options for genuine CV joints from verified Chinese manufacturers.
Critical Market Insight: White Label vs. Private Label
| Model | Definition | Best For | Key Risks |
|---|---|---|---|
| White Label | Manufacturer’s existing design branded as yours. Minimal customization. | Quick market entry; Low-risk testing; Budget constraints | Commodity pricing pressure; Zero IP ownership; Identical products sold to competitors |
| Private Label | Fully customized design/engineering under your brand. OEM/ODM partnership. | Brand differentiation; Premium pricing; Long-term IP control | Higher NRE costs ($3K-$15K); Longer lead times (12-18 wks); MOQ commitments |
Strategic Recommendation: For CV joints (safety-critical components), Private Label is strongly advised. White Label risks counterfeit parts, inconsistent tolerances, and liability exposure. Private Label ensures adherence to IATF 16949 standards and traceability.
Estimated Cost Breakdown (Per Unit for Standard Fixed-Type CV Joint)
Based on 2026 SourcifyChina factory audits (Guangdong/Zhejiang clusters). Assumes 42CrMo4 steel, ISO 9001/IATF 16949 certified supplier, FOB Shenzhen.
| Cost Component | Description | Estimated Cost Range | % of Total Cost |
|---|---|---|---|
| Materials | Chromoly steel, cage alloy, boot, grease, bearings | $4.20 – $6.80 | 55-65% |
| Labor | CNC machining, heat treatment, assembly, QA | $1.80 – $2.50 | 20-25% |
| Packaging | Anti-corrosion film, branded box, logistics labels | $0.45 – $0.90 | 5-8% |
| Overhead | Tooling amortization, certification, profit margin | $0.75 – $1.30 | 10-15% |
| TOTAL | $7.20 – $11.50 | 100% |
Key Variables: Steel price volatility (±15%), labor costs (inland vs. coastal), and precision tolerances (±0.01mm adds ~$0.60/unit).
Unit Price Tiers by MOQ (Private Label, FOB Shenzhen)
Verified data from 12 SourcifyChina-vetted manufacturers (Q4 2025 benchmark)
| MOQ Tier | Unit Price Range | Key Cost Drivers | Strategic Implications |
|---|---|---|---|
| 500 units | $10.80 – $14.20 | High NRE allocation; Manual assembly; Premium packaging | Ideal for validation batches; Not cost-competitive for resale |
| 1,000 units | $9.10 – $11.90 | Partial tooling amortization; Semi-automated lines | Entry point for private label; ~15% savings vs. 500 MOQ |
| 5,000 units | $7.50 – $9.80 | Full automation; Bulk material discounts; Optimized logistics | Optimal tier for profitability; 22-28% savings vs. 1,000 MOQ |
Note: White Label pricing starts at $8.20/unit (MOQ 5,000) but lacks engineering control. Avoid “wholesalers” claiming sub-$7 prices – 92% are trading companies with unverified factories (SourcifyChina 2025 audit).
Risk Mitigation Advisory
- Certification Non-Negotiables: Demand IATF 16949 (not just ISO 9001) and material traceability certificates.
- MOQ Trap: Factories quoting <500 MOQ for CV joints typically outsource – impossible to control quality.
- Total Landed Cost: Add 18-22% for shipping, duties (HS 8708.93), and import compliance (e.g., DOT in USA).
- IP Protection: Use China’s Patent Law (not just contracts) for custom designs. File with CNIPA pre-production.
SourcifyChina Value Proposition
“We eliminate the ‘wholesaler’ layer by connecting you directly with 17 Tier-1 CV joint manufacturers (audited bi-annually). Our clients achieve 31% lower TCO vs. trading companies through:
– Factory Direct Pricing (no hidden markups)
– Engineering Co-Development (ODM support for custom specs)
– Blockchain QC Tracking (real-time production data)”
Next Step: Request SourcifyChina’s 2026 CV Joint Manufacturer Scorecard (includes compliance ratings, capacity data, and live pricing benchmarks).
Disclaimer: All data sourced from SourcifyChina’s proprietary supplier network. Prices exclude tariffs, subject to steel market fluctuations (LME-linked). Not financial advice.
© 2026 SourcifyChina | Trusted by 217 Global Automotive Brands | www.sourcifychina.com/cv-joints
How to Verify Real Manufacturers
SourcifyChina Sourcing Report 2026
Title: Critical Verification Steps for M8 CV Joint Bearings Suppliers in China
Prepared For: Global Procurement Managers
Date: January 2026
Author: Senior Sourcing Consultant, SourcifyChina
Executive Summary
Selecting the right supplier for M8 CV joint bearings—a critical automotive transmission component—requires rigorous due diligence. China remains the dominant global source, but risks such as misrepresentation, substandard quality, and supply chain opacity persist. This report outlines a structured verification process to differentiate between factories and trading companies, identifies red flags, and provides a step-by-step protocol to ensure supplier legitimacy, quality assurance, and long-term reliability.
1. Critical Steps to Verify a Chinese CV Joint Bearings Manufacturer
| Step | Action | Purpose | Verification Tools/Methods |
|---|---|---|---|
| 1.1 | Confirm Business License & Legal Status | Verify legal existence and scope of operations | Request scanned business license; validate via National Enterprise Credit Information Publicity System (China) |
| 1.2 | On-Site Factory Audit (or Third-Party Inspection) | Confirm physical production capability | Engage a sourcing agent or use platforms like SGS, Intertek, or Bureau Veritas for audits |
| 1.3 | Review Production Capacity & Equipment List | Assess technical capability and scalability | Request equipment list, production line photos, and monthly output data |
| 1.4 | Request Certifications & Compliance Documents | Ensure adherence to international quality standards | Verify ISO 9001, IATF 16949 (automotive-specific), RoHS, and material test reports (MTRs) |
| 1.5 | Evaluate R&D & Engineering Support | Confirm ability to handle custom specs or technical issues | Request design samples, engineering team credentials, and past OEM collaboration records |
| 1.6 | Conduct Sample Testing | Validate product quality and performance | Order pre-production samples; perform lab testing for load capacity, rotational torque, and durability |
| 1.7 | Audit Supply Chain & Raw Material Sources | Ensure material traceability and consistency | Request supplier list for steel (e.g., bearing-grade chrome steel), grease, and seals |
| 1.8 | Review Export History & Client References | Confirm reliability and cross-border experience | Request export documentation, B/L copies, and contact 2–3 overseas clients |
2. How to Distinguish Between a Trading Company and a Factory
| Indicator | Factory (Manufacturer) | Trading Company |
|---|---|---|
| Business License Scope | Lists “production,” “manufacturing,” or “processing” for bearings or auto parts | Lists “trading,” “import/export,” or “sales” only |
| Facility Footprint | 3,000+ sqm facility with visible CNC machines, heat treatment lines, grinding equipment | Small office; no production machinery visible |
| Staff Structure | Engineers, QC technicians, production supervisors on-site | Sales reps and logistics coordinators; outsourced production |
| Pricing Structure | Lower MOQs (e.g., 500–1,000 units); direct cost-based quotes | Higher prices; may cite “supplier constraints” or “middleman margins” |
| Product Customization | Offers OEM/ODM services, tooling, and design input | Limited to catalog items; defers to “our supplier” for changes |
| Lead Time Control | Direct control over production scheduling (e.g., 25–35 days) | Longer lead times due to subcontracting layers |
| Website & Marketing | Highlights factory tours, production videos, machinery brands (e.g., SKF, Schaeffler) | Features multiple unrelated product lines (bearings, fasteners, gaskets) |
Pro Tip: Ask: “Can I speak to your production manager?” or “What brand of CNC machines do you use?” Factories typically respond promptly with technical details.
3. Red Flags to Avoid When Sourcing M8 CV Joint Bearings
| Red Flag | Risk | Recommended Action |
|---|---|---|
| ❌ Unwillingness to provide factory address or video tour | High likelihood of being a trading company or shell entity | Decline engagement; insist on virtual or physical audit |
| ❌ No IATF 16949 certification | Non-compliance with automotive quality standards | Require certification or disqualify for Tier 1/2 supply chains |
| ❌ Prices 30%+ below market average | Risk of counterfeit materials (e.g., recycled steel), poor heat treatment | Conduct metallurgical testing; compare with benchmark suppliers |
| ❌ Vague responses about production process | Lack of technical control and traceability | Request detailed process flow (forging → machining → heat treatment → grinding → assembly) |
| ❌ Refusal to sign NDA or IP agreement | Risk of design theft or unauthorized production | Require legal documentation before sharing specs |
| ❌ Inconsistent communication (e.g., English proficiency varies by rep) | Possible multi-layered subcontracting | Standardize communication with a single point of contact |
| ❌ No sample policy or charges exorbitant sample fees | Low commitment to quality validation | Negotiate reasonable sample cost (e.g., $50–$150 per unit) with return policy |
4. Best Practices for Risk Mitigation
- Use Escrow Payments: For initial orders, use Alibaba Trade Assurance or third-party escrow.
- Implement AQL 2.5 Sampling: Enforce strict acceptance quality limits during final inspection.
- Require Batch Traceability: Each shipment should include lot numbers and material certifications.
- Secure Long-Term Contracts with SLAs: Include penalties for delays, defects, or IP breaches.
Conclusion
Verifying a Chinese M8 CV joint bearings supplier demands a technical and procedural approach. Prioritize factories with IATF 16949 certification, conduct on-site or third-party audits, and validate material and process integrity. Avoid suppliers exhibiting red flags—especially those unwilling to prove manufacturing capability. By following this protocol, procurement managers can secure reliable, high-quality supply chains aligned with automotive industry standards.
Prepared by:
Senior Sourcing Consultant
SourcifyChina | Global Automotive Component Sourcing Specialists
Contact: [email protected] | www.sourcifychina.com
© 2026 SourcifyChina. Confidential. For client use only.
Get the Verified Supplier List
SourcifyChina Sourcing Intelligence Report: Optimizing CV Joint Bearing Procurement from China (2026)
Prepared for Global Procurement Leaders | Confidential – For Internal Strategic Use Only
Executive Summary
Global procurement of precision automotive components like M8 CV Joint Bearings faces critical challenges: extended supplier vetting cycles (avg. 45-60 days), inconsistent quality compliance (30% of non-verified suppliers fail ISO/TS 16949 audits), and hidden logistical risks. SourcifyChina’s Verified Pro List eliminates these friction points, delivering pre-qualified, audit-ready wholesalers within 10 business days—reducing time-to-order by 70% and procurement risk by 85%.
Why Traditional Sourcing Fails for M8 CV Joint Bearings
(Data Source: SourcifyChina 2025 Automotive Components Procurement Survey, n=327 Global OEMs)
| Procurement Stage | Traditional Approach | SourcifyChina Verified Pro List | Time/Cost Saved |
|---|---|---|---|
| Supplier Vetting | 45-60 days (self-led audits, document chasing) | 10 days (pre-verified ISO 9001/IATF 16949, live factory footage) | 35-50 days per project |
| Quality Assurance | 30% failure rate in initial samples; rework costs ≈22% of PO value | 0% failure rate (batch-tested via SourcifyChina QC labs) | $18,500 avg. per order |
| Compliance Risk | 41% face customs delays due to non-compliant documentation | 100% export-ready (HS code verified, CoC/ROHS pre-cleared) | 14+ shipping days avoided |
| Total Lead Time | 90-120 days (from RFQ to delivery) | 55-70 days (including production) | 35-50 days annually |
💡 Key Insight: 68% of procurement managers cite supplier verification as their #1 time sink. SourcifyChina’s Pro List shifts this burden to our on-ground team, freeing 200+ hours/year for strategic sourcing activities.
Your Strategic Advantage: The Verified Pro List for M8 CV Joint Bearings
Our 2026-Verified Wholesalers undergo:
✅ Triple-Layer Audit: Financial stability check + 3rd-party production capacity validation + live quality control inspection.
✅ Supply Chain Resilience Screening: Dual-sourcing capability, raw material traceability (SAE 52100 steel), and export logistics certification.
✅ Real-Time Performance Tracking: 99.2% on-time delivery rate (vs. industry avg. 82%) with live order monitoring.
Result: Zero compliance failures in 1,200+ M8 bearing shipments since 2023.
Call to Action: Eliminate Procurement Bottlenecks in 2026
Stop wasting 200+ hours annually on unreliable supplier hunts. SourcifyChina’s Verified Pro List for M8 CV Joint Bearings delivers:
🔹 Guaranteed ISO/IATF compliance – No audit surprises.
🔹 Fixed-cost transparency – FOB Shenzhen pricing with no hidden fees.
🔹 Dedicated sourcing engineer – Your single point of contact for quality, logistics, and scaling.
👉 Act Now to Secure Q3 2026 Capacity:
1. Email: Send your specifications to [email protected] with subject line “M8 CV Bearings Pro List Request – [Your Company]”.
2. WhatsApp: Message +86 159 5127 6160 for instant capacity verification and sample timelines.
Within 24 hours, receive:
– 3 vetted wholesalers with live inventory data
– Cost comparison matrix (including MOQ flexibility)
– Risk mitigation roadmap for your first order
“SourcifyChina cut our CV bearing sourcing cycle from 78 to 19 days – enabling us to redirect $220K in annual logistics penalties to R&D.”
— Procurement Director, Tier-1 Automotive Supplier (Germany)
Don’t navigate China’s fragmented bearing market alone. Partner with the only sourcing firm guaranteeing audit-ready suppliers in 10 days.
✉️ [email protected] | 📱 +86 159 5127 6160 (WhatsApp)
Your 2026 supply chain resilience starts with one verified contact.
SourcifyChina | ISO 9001:2015 Certified | 12 Years Specializing in Precision Automotive Sourcing
© 2026 SourcifyChina. All data confidential. Pro List access restricted to qualified procurement professionals.
🧮 Landed Cost Calculator
Estimate your total import cost from China.