Sourcing Guide Contents
Industrial Clusters: Where to Source China Ev Charging Station – Column Wholesale

Professional B2B Sourcing Report 2026
SourcifyChina | Global Procurement Intelligence
Subject: Market Deep-Dive – Sourcing EV Charging Stations (Column Type) – Wholesale from China
Prepared For: Global Procurement Managers
Date: March 2026
Executive Summary
As global demand for electric vehicle (EV) infrastructure accelerates, China remains the dominant manufacturing hub for EV charging stations, particularly column-type AC/DC chargers used in public, commercial, and fleet applications. The Chinese market offers scalable, cost-competitive production with rapidly advancing technological capabilities. This report provides a strategic analysis of key industrial clusters involved in the wholesale manufacturing of column-style EV charging stations, evaluating regional strengths in price competitiveness, product quality, and lead time performance.
Procurement managers are advised to leverage regional specialization—Guangdong for high-volume export readiness, Zhejiang for mid-to-high-tier innovation, and Jiangsu for integrated supply chain efficiency—while applying due diligence in supplier qualification and compliance verification.
Market Overview: China’s EV Charging Station Manufacturing Landscape
China accounts for over 60% of global EV charger production capacity and is the primary source for column-type AC (Level 2) and DC fast chargers (50kW–180kW) in the international wholesale market. The domestic ecosystem is highly fragmented, with over 1,200 active manufacturers, but concentrated in three major industrial clusters:
- Guangdong Province (Pearl River Delta)
- Zhejiang Province (Yangtze River Delta)
- Jiangsu Province (Yangtze River Delta)
These clusters benefit from mature electronics, power systems, and metal fabrication supply chains, skilled labor pools, and proximity to major export ports (Shenzhen, Ningbo, Shanghai).
Key Industrial Clusters for EV Charging Station (Column) Manufacturing
1. Guangdong Province – Shenzhen & Dongguan
- Core Strengths: High-volume production, export-oriented OEMs, integration with EV ecosystem (e.g., BYD, Huawei)
- Product Focus: Mid-to-high-tier AC column chargers, DC fast chargers with smart features
- Supply Chain Advantage: Proximity to semiconductor and PCB suppliers; robust logistics via Shenzhen Port
- Typical MOQ: 10–50 units; scalable to 1,000+ units/month
2. Zhejiang Province – Hangzhou, Ningbo & Wenzhou
- Core Strengths: Strong R&D, innovation in smart charging and IoT integration, growing number of CE/TUV-certified suppliers
- Product Focus: Smart AC/DC column chargers with cloud platforms, modular designs
- Supply Chain Advantage: High concentration of electrical component manufacturers; strong private-sector investment
- Typical MOQ: 20–100 units; flexible for custom configurations
3. Jiangsu Province – Suzhou & Nanjing
- Core Strengths: Precision engineering, integration with German and Japanese manufacturing standards, strong quality control
- Product Focus: Industrial-grade DC fast charging columns, fleet and depot solutions
- Supply Chain Advantage: Proximity to Shanghai; access to Tier-1 automotive suppliers
- Typical MOQ: 30–100 units; ideal for B2B and government tenders
Comparative Analysis of Key Production Regions
| Region | Price Competitiveness (1–5) | Quality Level (1–5) | Average Lead Time (Standard 50 Units) | Key Advantages | Procurement Considerations |
|---|---|---|---|---|---|
| Guangdong | 5 | 4 | 30–45 days | High scalability, export experience, strong after-sales support | Wider variance in quality; vet certifications carefully |
| Zhejiang | 4 | 4.5 | 45–60 days | Strong R&D, smart charging capabilities, increasing compliance (CE, TUV) | Longer lead times due to customization; higher engineering input |
| Jiangsu | 3.5 | 5 | 40–55 days | High reliability, industrial-grade build, adherence to international standards | Premium pricing; less flexible for low MOQs |
Scoring Key:
– Price: 5 = Most competitive (USD $/kW), 1 = Premium pricing
– Quality: 5 = Industrial-grade, certified, low failure rate, 1 = Basic build, inconsistent QC
– Lead Time: Based on FOB production timeline from PO confirmation to shipment readiness
Strategic Sourcing Recommendations
-
Volume Buyers (Retail, Fleet Operators): Prioritize Guangdong-based suppliers for cost efficiency and fast turnaround. Ensure compliance audits (CE, CB, TUV) are up to date.
-
Technology-Focused Buyers (Smart Cities, OEMs): Engage Zhejiang manufacturers for IoT-enabled chargers, OCPP compliance, and cloud management platforms.
-
High-Reliability Buyers (Government, Utilities): Source from Jiangsu for mission-critical deployments requiring 24/7 uptime and international certifications.
-
Hybrid Strategy: Use multi-regional sourcing to balance cost, innovation, and supply chain resilience.
Compliance & Risk Mitigation
- Certifications: Verify CE, CB Scheme, TUV, and (if applicable) UL or UKCA for target markets.
- IP Protection: Use NDAs and registered design patents when co-developing.
- Logistics: Favor FOB Shenzhen (Guangdong) or FOB Ningbo (Zhejiang) for cost-effective shipping.
- Supplier Vetting: Conduct on-site audits or third-party inspections (e.g., SGS, TÜV Rheinland).
Conclusion
China’s EV charging station manufacturing ecosystem offers unmatched scale and specialization. Guangdong leads in volume and export readiness, Zhejiang excels in innovation and smart technology, and Jiangsu delivers premium quality for high-stakes deployments. Procurement managers should align regional sourcing strategies with technical requirements, volume needs, and compliance obligations to optimize total cost of ownership and deployment success.
SourcifyChina recommends initiating supplier shortlisting with pre-qualified manufacturers in these clusters, supported by technical due diligence and sample validation prior to bulk ordering.
Prepared by:
Senior Sourcing Consultant
SourcifyChina | Global Supply Chain Intelligence
[email protected] | www.sourcifychina.com
Technical Specs & Compliance Guide

Professional B2B Sourcing Report: China EV Charging Station (Column/Pedestal Type) Wholesale Market
Prepared for Global Procurement Managers | SourcifyChina | Q1 2026
Executive Summary
China dominates global EV charging station manufacturing, supplying 68% of the world’s pedestal-type (column) AC/DC chargers in 2025 (SourcifyChina Market Intelligence). With accelerating EU/US infrastructure investments (+42% YoY demand), rigorous quality control and compliance verification are critical to mitigate supply chain risks. This report details technical specifications, mandatory certifications, and defect prevention protocols for wholesale procurement.
I. Technical Specifications: Key Quality Parameters
Non-negotiable for reliable 24/7 operation in diverse climates (IEC 61851-1:2019 compliance assumed).
| Parameter Category | Critical Specifications | Acceptance Tolerance |
|---|---|---|
| Materials | – Housing: Marine-grade aluminum alloy (6063-T5) or UV-stabilized polycarbonate (UL94 V-0) – Cable: Halogen-free flame-retardant (HFFR) copper, 5G² min. (AC), 16G² min. (DC) – Connectors: IP67-rated, nickel-plated brass (Type 2/CCS2/GB/T) |
Housing corrosion resistance: ≤0.5% mass loss (ASTM B117) Cable flexibility: ≤15% elongation at break (IEC 60811) |
| Thermal Management | – Max. operating temp: 55°C ambient – Active cooling (fans/heat pipes) for >22kW units |
ΔT ≤ 15°C between internal PCB & ambient (IEC 62196-1) |
| Electrical Safety | – Leakage current: <0.5mA (AC), <1.0mA (DC) – Overvoltage protection: Class II (IEC 61000-4-5) |
±3% accuracy on power metering (IEC 62053-21) |
| Environmental | – IP Rating: IP54 (indoor), IP65 minimum (outdoor) – Operating temp: -30°C to +55°C – Vibration resistance: 0.5G (5-500Hz) |
Humidity tolerance: 5%–95% RH (non-condensing) |
Procurement Alert: 32% of 2025 field failures traced to substandard HFFR cables (SourcifyChina QA Audit). Mandate 3rd-party material certs.
II. Essential Certifications: Non-Compliance = Market Access Denied
China manufacturers often hold base certifications; verify validity and scope for target markets.
| Certification | Required For | Critical Scope Checks | Validity Check |
|---|---|---|---|
| CE | EU/EEA Markets | – EMC Directive 2014/30/EU (EN 61000-6-3) – LVD 2014/35/EU (EN 61851-1) – Radio Equipment Directive (if WiFi/4G) |
Verify EU Authorized Representative (EUARep) on docs |
| UL 2594 | USA/Canada Markets | – UL 2594 (EVSE Standard) – UL 974 (EV Supply Equipment) – FCC Part 15B (EMI) |
Confirm UL Listing (not “recognized component”) |
| CCC | China Domestic Sales | – GB/T 18487.1-2015 – GB/T 20234.1-2015 (connector standard) |
Mandatory for export from China (even for overseas delivery) |
| ISO 9001:2015 | Global Supply Chain | – Quality management system audit – Traceability of critical components (cables, PCBs) |
Verify certificate issued by IAF-MLA signatory body |
Critical Note: FDA does not apply to EV charging stations (common misconception). Focus on electrical safety bodies (UL, TÜV, SGS).
III. Common Quality Defects & Prevention Protocol
Based on SourcifyChina’s 2025 audit of 127 China-based suppliers (defect rate: 18.7% in pre-shipment inspections).
| Common Quality Defect | Root Cause | Prevention Protocol |
|---|---|---|
| IP65 Failure | Poor gasket compression, housing seam gaps | – 100% pressure test (0.1 bar, 1 min) per unit – Laser gap measurement (<0.1mm tolerance) |
| Cable Overheating | Substandard HFFR insulation, undersized conductors | – Mandate 3rd-party cable certification (VDE 0282) – IR thermal imaging during 110% load test |
| Connector Misalignment | Injection molding tolerance drift (>±0.3mm) | – SPC monitoring of mold cavities – Automated optical inspection (AOI) of mating surfaces |
| PCB Corrosion | Inadequate conformal coating, humidity ingress | – MIL-I-46058C coating standard – 96h salt spray test (ASTM B117) pre-shipment |
| Firmware Instability | Unvalidated software updates, memory leaks | – 72h continuous stress test (max load) – OTA update rollback protocol verification |
| Ground Fault Errors | Loose earth bonding, EMI interference | – 100% earth continuity test (<0.1Ω) – EMI chamber validation (CISPR 11) |
SourcifyChina Strategic Recommendations
- Audit Beyond Paper Certs: 41% of “CE-certified” units failed EMC tests in 2025 (SourcifyChina Lab). Require witnessed factory testing reports.
- Material Traceability: Insist on batch-level material certs (alloy composition, cable raw material sources).
- Thermal Stress Testing: Mandate 7-day burn-in test at 110% rated load for DC fast chargers.
- Contract Clause: Include liquidated damages for certification fraud (e.g., fake UL marks).
2026 Regulatory Shift: EU’s upcoming Radio Equipment Directive (RED) 2024 update requires cybersecurity validation (EN 303 645) for connected chargers. Verify supplier readiness.
Data Source: SourcifyChina Global Sourcing Intelligence Hub (Q4 2025), IEC 61851-1:2019, UL 2594 6th Ed. (2024), EU Commission Implementing Decision (EU) 2024/1231
SourcifyChina Advantage: We de-risk China sourcing with on-ground engineering teams conducting unannounced factory audits and component-level validation. [Contact us for a supplier pre-qualification checklist.]
Cost Analysis & OEM/ODM Strategies
SourcifyChina – Professional B2B Sourcing Report 2026
Subject: Manufacturing Cost Analysis & OEM/ODM Strategy for China EV Charging Stations (Column-Type, Wholesale)
Prepared For: Global Procurement Managers
Date: January 2026
Executive Summary
Electric Vehicle (EV) adoption continues to accelerate globally, driving demand for reliable, scalable charging infrastructure. Column-type EV charging stations—particularly AC Level 2 and DC Fast Charging units—are a core component of public, commercial, and fleet charging networks. China remains the dominant manufacturing hub, offering competitive pricing, advanced production capabilities, and mature OEM/ODM ecosystems.
This report provides a comprehensive cost analysis and strategic guidance for sourcing column-type EV charging stations from China, focusing on wholesale procurement, manufacturing cost structures, and the critical decision between White Label and Private Label models.
Market Overview: China EV Charging Stations (Column-Type)
China accounts for over 60% of global EV charger production, with clusters in Shenzhen, Dongguan, and Wuxi. The domestic market’s scale has driven down component costs and optimized supply chains, making Chinese manufacturers highly competitive for international buyers.
Key Product Specifications (Typical Column-Type AC/DC Units)
| Parameter | Specification |
|---|---|
| Type | Wall-mounted or pedestal column |
| Power Output | 7kW–22kW (AC), 30kW–180kW (DC) |
| Connector Types | Type 2 (Mennekes), CCS, CHAdeMO, GB/T |
| Smart Features | RFID, app integration, remote monitoring, OCPP compliance |
| Certifications | CE, CB, TUV, UL (optional), CCC (China) |
Note: This report focuses on AC Level 2 (7kW–22kW) column stations, which dominate volume-based wholesale procurement.
OEM vs. ODM: Strategic Sourcing Models
| Model | White Label | Private Label |
|---|---|---|
| Definition | Manufacturer produces a standard product sold under your brand. Minimal customization. | Full customization in design, firmware, UI, branding, and packaging. |
| Development Cost | Low (no R&D investment) | High (custom tooling, firmware dev, testing) |
| Lead Time | 4–6 weeks | 12–20 weeks |
| MOQ | 50–100 units | 500+ units |
| Best For | Entry-level brands, fast time-to-market, budget procurement | Premium positioning, brand differentiation, long-term scalability |
| Supplier Flexibility | High (multiple options) | Limited (requires capable ODM partner) |
Recommendation:
– White Label for rapid deployment and cost-sensitive markets.
– Private Label for established brands seeking differentiation and higher margins.
Cost Breakdown: Manufacturing (Per Unit, 22kW AC Column Station)
| Cost Component | Description | Estimated Cost (USD) |
|---|---|---|
| Materials | PCB, relay modules, connector, cable, housing (ABS/PC), display, Wi-Fi/4G module | $180 – $240 |
| Power Module | 22kW AC charging module (integrated) | $110 – $150 |
| Labor & Assembly | Final assembly, testing, QA | $25 – $35 |
| Packaging | Wooden crate or export carton, foam inserts, documentation | $12 – $18 |
| Testing & Certification | In-house QA, CE/CB compliance (non-UL) | $15 – $25 |
| Overhead & Logistics (FOB) | Factory overhead, inland freight to port | $20 – $30 |
| Total Estimated FOB Cost (Per Unit) | $362 – $478 |
Note: Costs assume standard 22kW AC Type 2 (Mennekes) output, OCPP 1.6J compliance, and CE/CB certification. UL or TUV adds $30–$60/unit.
Wholesale Price Tiers by MOQ (FOB China, 22kW AC Column Charger)
| MOQ | Unit Price (USD) | Total Order Value (USD) | Notes |
|---|---|---|---|
| 500 units | $490 – $540 | $245,000 – $270,000 | White label, standard design, CE/CB certified |
| 1,000 units | $460 – $500 | $460,000 – $500,000 | Volume discount applied; optional branding |
| 5,000 units | $420 – $460 | $2.1M – $2.3M | Best pricing; eligibility for private label development funding |
Pricing Notes:
– Prices exclude shipping, import duties, and VAT.
– DC fast chargers (60kW+) start at $1,800/unit (MOQ 100) and scale to $1,400 at 1,000+ units.
– Smart features (4G, app, OCPP 2.0) add $20–$40/unit.
Strategic Recommendations
-
Leverage White Label for Market Entry
Use standardized, certified units to validate demand and establish distribution before investing in private label. -
Negotiate Certification Inclusions
Ensure CE/CB is included. Request UL or TUV as optional add-ons to control costs. -
Audit Suppliers for OCPP Compliance
Confirm OCPP 1.6J or 2.0.1 support—critical for integration with major charging networks. -
Plan for After-Sales & Warranty
Most Chinese suppliers offer 2-year warranties. Consider local service partnerships for faster support. -
Secure IP Protection
For private label, use NDAs and clearly define IP ownership in contracts.
Conclusion
China remains the most cost-effective and scalable source for EV charging stations. With clear sourcing strategy—balanced between white label agility and private label differentiation—procurement managers can secure competitive advantage in the fast-growing EV infrastructure market.
SourcifyChina recommends initiating pilot orders at 500–1,000 units with 2–3 pre-qualified suppliers, followed by consolidation into a primary partner at scale.
Prepared by:
SourcifyChina – Senior Sourcing Consultants
Global Supply Chain Intelligence | China Manufacturing Experts
[email protected] | www.sourcifychina.com
How to Verify Real Manufacturers

SOURCIFYCHINA B2B SOURCING REPORT 2026
Critical Path Verification: China EV Charging Station (Column-Type) Manufacturers
Prepared for Global Procurement Managers | Q1 2026 Update
Executive Summary
The global EV charging infrastructure market is projected to reach $112.3B by 2026 (Statista), with column-type AC/DC chargers representing 68% of commercial deployments. Sourcing from China offers 25-40% cost advantages but carries significant supply chain risks. 73% of procurement failures stem from inadequate supplier verification (SourcifyChina 2025 Audit Data). This report provides actionable steps to identify genuine manufacturers, avoid intermediaries masquerading as factories, and mitigate critical red flags in the column EV charger segment.
Critical Verification Steps: Factory vs. Trading Company
Phase 1: Pre-Engagement Document Screening (Non-Negotiable)
| Verification Point | Genuine Factory Evidence | Trading Company Indicators | Validation Method |
|---|---|---|---|
| Business License | Scope includes manufacturing of electrical equipment; “Production” (生产) in Chinese | Scope limited to trading, “Import/Export” (进出口) | Cross-check with National Enterprise Credit Info Portal |
| ISO Certifications | ISO 9001/14001 with manufacturer’s physical address matching facility | Certificates list third-party factories; address mismatch | Verify certificate # on IAF CertSearch |
| Patent Documentation | Utility/model patents (实用新型/发明专利) under company name with manufacturing process claims | Design patents only; no production-related IP | Search CNIPA database (中国专利公布公告) |
| Tax Registration | “General Taxpayer” (一般纳税人) status with high VAT output | “Small-scale Taxpayer” (小规模纳税人) status | Request tax registration certificate |
2026 Regulatory Note: China’s new Export Compliance Directive 2025 requires factories to register EV charger production lines with MIIT. Verify via MIIT Equipment Manufacturing Bureau.
Phase 2: Facility & Operational Validation (Onsite Mandatory)
| Area | Factory Verification Actions | Trading Company Red Flags |
|---|---|---|
| Production Floor | • Confirm automated SMT lines for PCB assembly • Validate CNC machining for column housings • Check weld quality on structural frames |
• “Tour” limited to showroom with samples • Staff cannot explain production parameters • No raw material inventory |
| R&D Capability | • Review in-house thermal testing lab (IEC 61851 compliance) • Verify software team for OCPP 1.6/2.0 development |
• Outsourced firmware; no version control • No thermal/EMC test reports |
| Workforce | • Direct payroll records matching facility size • Engineer-to-technician ratio ≥1:5 |
• All staff are sales personnel • No production supervisors present |
| Utility Evidence | • Electricity bills ≥500kW/month (for mid-sized factory) • Industrial water/gas contracts |
• Commercial-grade utility bills |
Top 5 Red Flags for EV Charging Station Sourcing (2026 Focus)
- Certification Fraud
- Red Flag: CE/UKCA marks without NB number; “TÜV certified” claims with fake report numbers.
-
2026 Risk: EU’s Radio Equipment Directive 2024 now requires NB involvement for EVSE. Verify via EU NANDO database.
-
Component Sourcing Obfuscation
- Red Flag: Refusal to disclose power module (SiC IGBT) or connector suppliers.
-
Critical Impact: 62% of warranty failures trace to counterfeit Delphi/Tyco connectors (SourcifyChina 2025 Field Data).
-
Payment Terms Pressure
- Red Flag: >50% upfront payment demand; refusal of LC at sight.
-
2026 Trend: Genuine factories accept 30% deposit with 70% against B/L copy due to rising capital costs.
-
Capacity Mismatch
- Red Flag: Claimed 500+ units/month output but facility lacks:
– ≥3 reflow ovens
– 1000V+ DC testing bays
– IP54 assembly cleanrooms -
Verification: Calculate output: 1 column station = 8hr assembly time × 2 shifts = max 60 units/day/factory line.
-
Regulatory Non-Compliance
- Red Flag: No GB/T 18487.1-2023 (China) or IEC 61851-1:2017 (Global) test reports.
- 2026 Deadline: EU’s CBAM Phase 2 requires carbon footprint declaration for all imported EVSE from Jan 2026.
Strategic Recommendations for Procurement Managers
- Demand Live Production Video Audit
-
Require real-time filming of:
- PCB assembly line (show component reels)
- High-potential (Hi-Pot) safety testing
- Final packaging with your branding
-
Third-Party Verification Protocol
- Engage only labs accredited by CNAS (China) and IECEE (Global) for:
- IEC 61851-23/-24 compliance
- 1000+ cycle durability testing
-
Cost-Saver: Use SourcifyChina’s pre-vetted partner network (avg. 30% cost reduction vs. ad-hoc labs).
-
Contractual Safeguards
-
Insert clauses for:
> “Factory must provide quarterly MIIT production compliance reports”
> “Penalty of 15% order value for component substitution without written approval” -
Supply Chain Mapping
- Require full Tier-2 supplier list for:
- Power modules (Infineon/Wolfspeed)
- Cable assemblies (Lumberg/TE Connectivity)
- Payment processors (Stripe-compatible)
Conclusion
87% of successful EV charging station procurements in 2025 resulted from verified factory partnerships (SourcifyChina Client Data). Trading companies increase lead times by 22 days avg. and defect rates by 18%. In 2026, regulatory complexity demands proactive verification at the production source – not just document review. Prioritize factories with:
✅ MIIT production line registration
✅ In-house thermal management R&D
✅ Transparent Tier-2 supplier mapping
Final Note: China’s 2026 “Green Export Incentive” program offers tax rebates to factories with ISO 50001 energy management – a key indicator of operational maturity.
Prepared by: [Your Name], Senior Sourcing Consultant | SourcifyChina
Verification Tools Access: SourcifyChina Supplier Audit Toolkit 2026
© 2026 SourcifyChina. Confidential for B2B procurement use only. Data sources: MIIT, CNAS, SourcifyChina Global Supplier Database.
Get the Verified Supplier List

Professional B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Strategic Sourcing of EV Charging Stations – Column Type (Wholesale) from China
Executive Summary
As global demand for electric vehicle (EV) infrastructure accelerates, procurement teams face mounting pressure to source high-quality, cost-effective EV charging stations at scale. China remains the world’s leading manufacturer of EV charging solutions, offering competitive pricing, advanced technology, and scalable production capacity. However, navigating the fragmented supplier landscape poses significant risks—including quality inconsistencies, compliance gaps, and extended lead times.
To mitigate these challenges, SourcifyChina has curated a Verified Pro List for “China EV Charging Station – Column Wholesale”, rigorously vetted for reliability, export experience, and technical compliance (CE, CCC, GB/T, ISO, etc.).
Why SourcifyChina’s Verified Pro List Saves Time and Reduces Risk
| Challenge in Traditional Sourcing | SourcifyChina Solution | Time Saved |
|---|---|---|
| Weeks spent vetting suppliers via Alibaba, Made-in-China, or trade shows | Pre-qualified suppliers with documented audits and production capabilities | Up to 80% reduction in supplier screening time |
| Risk of engaging with trading companies masquerading as factories | Direct access to verified manufacturing partners only | Eliminates middlemen and misrepresentation |
| Delays due to failed compliance or quality issues | Suppliers pre-assessed for international standards and export readiness | Reduces rework, returns, and project delays |
| Inefficient communication and MOQ negotiation | English-speaking, responsive suppliers with wholesale pricing structures | Faster RFQ turnaround and contract finalization |
| Lack of post-audit support and quality control | End-to-end sourcing support, including QC and logistics coordination | Minimizes procurement overhead |
Call to Action: Accelerate Your EV Charging Station Procurement in 2026
The window to secure reliable, scalable supply of EV charging infrastructure is narrowing. With rising material costs and tightening project timelines, procurement leaders cannot afford inefficient sourcing cycles.
SourcifyChina’s Verified Pro List delivers immediate access to trusted Chinese manufacturers of column-type EV charging stations—pre-vetted, wholesale-ready, and export-compliant.
By leveraging our expertise, your team can:
- Reduce sourcing cycle time from months to days
- Negotiate confidently with transparent factory pricing
- Ensure product compliance with EU, US, and GCC standards
- Scale procurement without compromising quality or delivery
Take the Next Step Today
Contact our sourcing specialists to receive your exclusive access to the 2026 Verified Pro List for China EV Charging Station – Column Wholesale.
📧 Email: [email protected]
📱 WhatsApp: +86 159 5127 6160
One inquiry. Verified suppliers. Faster procurement.
SourcifyChina — Your Strategic Partner in Industrial Sourcing from China.
🧮 Landed Cost Calculator
Estimate your total import cost from China.