Executive Summary
China remains the world’s largest manufacturer and exporter of electric power equipment, including transformers, switchgears, power distribution units, and renewable energy integration systems. As global demand for reliable and efficient power infrastructure grows—driven by urbanization, industrialization, and energy transition—China’s electric power equipment sector offers significant sourcing opportunities for international buyers.
This report provides a strategic market analysis identifying key industrial clusters in China specializing in electric power equipment manufacturing. It evaluates regional strengths in terms of price competitiveness, product quality, and lead time efficiency, enabling procurement managers to make data-driven sourcing decisions.
Market Overview: China’s Electric Power Equipment Sector
China’s electric power equipment industry is supported by strong government investment in smart grids, ultra-high voltage (UHV) transmission, and renewable energy integration. The sector is dominated by large state-owned enterprises (SOEs) such as State Grid Corporation of China (SGCC) and China Energy Engineering Group (CEEC), but a robust ecosystem of private and tiered suppliers supports export-oriented manufacturing.
Key product categories include:
– Transformers (distribution & power)
– High & medium voltage switchgear
– Circuit breakers and protection relays
– Power generation equipment (diesel, solar hybrid)
– Smart grid components
– Power distribution panels and control systems
Key Industrial Clusters for Electric Power Equipment Manufacturing
China’s electric power equipment manufacturing is concentrated in several industrial hubs, each with distinct competitive advantages. The primary clusters are located in Guangdong, Zhejiang, Jiangsu, Shanghai, and Anhui provinces.
1. Guangdong Province (Guangzhou, Shenzhen, Foshan)
- Focus: High-tech integration, smart grid components, export-oriented manufacturing
- Strengths: Proximity to Hong Kong logistics, strong R&D, high automation
- Key Players: NARI Group (subsidiaries), TBEA Guangdong, local OEMs in Foshan
2. Zhejiang Province (Hangzhou, Ningbo, Wenzhou)
- Focus: Medium-voltage switchgear, transformers, modular power systems
- Strengths: High concentration of mid-tier manufacturers, cost efficiency, strong supply chain
- Key Players: Zhejiang Tianyu, Wenzhou Electric, Hangzhou Power Equipment Co.
3. Jiangsu Province (Nanjing, Wuxi, Changzhou)
- Focus: High-voltage transmission equipment, transformer manufacturing
- Strengths: Proximity to Shanghai, skilled labor, strong state-backed infrastructure
- Key Players: Jiangsu Huapeng, NARI Nanjing, State Grid subsidiaries
4. Shanghai
- Focus: High-end switchgear, automation systems, R&D centers
- Strengths: International standards compliance, engineering expertise
- Key Players: Shanghai Electric, Schneider Electric China (JV), ABB China
5. Anhui Province (Hefei)
- Focus: Emerging hub for transformer and substation equipment
- Strengths: Lower labor costs, government incentives, growing industrial parks
- Key Players: Hefei MEA Electric, CEEC-affiliated manufacturers
Comparative Analysis of Key Production Regions
The following table evaluates the top-tier sourcing regions for electric power equipment based on three critical procurement KPIs: Price, Quality, and Lead Time.
| Region | Price Competitiveness | Quality Level | Average Lead Time | Key Advantages | Considerations |
|---|---|---|---|---|---|
| Guangdong | Medium-High | High | 6–8 weeks | Advanced tech, export readiness, strong QA systems | Higher labor costs; MOQs may apply |
| Zhejiang | High | Medium-High | 5–7 weeks | Cost-efficient, dense supplier network, flexible MOQs | Quality varies by tier; vetting essential |
| Jiangsu | Medium | High | 7–9 weeks | High-voltage expertise, SOE partnerships, compliance with GB/IEC standards | Longer lead times due to customization |
| Shanghai | Low-Medium | Very High | 8–10 weeks | Premium engineering, global certifications (ISO, CE, UL), bilingual support | Highest pricing; best for critical applications |
| Anhui | Very High | Medium | 6–8 weeks | Low-cost alternative, government subsidies, scalable capacity | Emerging cluster; limited after-sales support |
Scoring Key:
– Price: High = most competitive pricing
– Quality: High = consistent compliance with international standards (IEC, IEEE)
– Lead Time: Based on standard order (e.g., 50 units of 1000 kVA transformers)
Strategic Sourcing Recommendations
-
For Cost-Sensitive Projects:
Prioritize Zhejiang and Anhui for standard distribution equipment. Conduct rigorous supplier audits to ensure quality consistency. -
For High-Reliability Applications (e.g., utilities, industrial plants):
Select Jiangsu or Shanghai suppliers with proven track records in UHV or smart grid deployments. -
For Fast-Turnaround and Tech-Integrated Solutions:
Guangdong offers the best balance of speed, innovation, and export logistics. -
Dual-Source Strategy:
Combine a high-quality supplier from Jiangsu/Shanghai with a cost-efficient partner in Zhejiang to mitigate supply chain risk. -
Certification & Compliance:
Ensure all suppliers provide CB Scheme, ISO 9001, and relevant CE/UL certifications. Prefer those with experience in turnkey substation projects.
Risk Mitigation & Due Diligence
- Supplier Vetting: Conduct on-site audits or use third-party inspection services (e.g., SGS, Bureau Veritas).
- IP Protection: Use NDAs and clearly defined terms in contracts.
- Logistics Planning: Leverage Guangzhou, Ningbo, and Shanghai ports for efficient shipping.
- Payment Terms: Use LC or escrow-based payments until first delivery is verified.
Conclusion
China’s electric power equipment manufacturing landscape offers diverse sourcing opportunities tailored to specific project requirements. While Zhejiang leads in price competitiveness and supply chain agility, Jiangsu and Shanghai deliver premium quality for mission-critical infrastructure. Guangdong bridges innovation and export efficiency, making it ideal for smart grid deployments.
Global procurement managers are advised to adopt a region-specific sourcing strategy, supported by technical due diligence and performance benchmarking, to optimize total cost of ownership and supply chain resilience.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Empowering Global Procurement with China-Specific Intelligence
Contact: [email protected] | www.sourcifychina.com
Technical Specs & Compliance Guide
SourcifyChina Sourcing Intelligence Report: Electrical Power Equipment Manufacturing in China
Report Date: January 15, 2026
Prepared For: Global Procurement Managers | Confidentiality Level: B2B Strategic
Executive Summary
Clarification: “China Electric Power Company” (CEPC) is a state-owned utility operator (State Grid subsidiary), not a manufacturer. This report addresses Chinese electrical power equipment manufacturers supplying transformers, switchgear, and transmission components to global markets. Key risks include inconsistent material sourcing and certification gaps. SourcifyChina recommends tiered supplier qualification with 3rd-party testing for high-voltage (>35kV) projects.
I. Technical Specifications & Compliance Requirements
Applies to transformers, circuit breakers, switchgear, and power distribution units (PDUs)
| Parameter | Critical Specifications | Compliance Standard |
|---|---|---|
| Materials | • Conductors: Oxygen-free copper (≥99.95% purity, IACS ≥100%) • Insulation: Silicone rubber (HV) / Epoxy resin (LV); UL 94 V-0 flammability |
IEC 60060 (HV testing), IEC 60204-1 (safety), GB/T 11022 (Chinese national standard) |
| Tolerances | • Dimensional: ±0.1mm for busbar connections • Electrical: ±1.5% voltage regulation (transformers) • Thermal: Max. 65K rise at rated load |
IEC 60076-1 (transformers), IEC 62271-1 (switchgear) |
| Environmental | • Operating Temp: -40°C to +55°C (outdoor units) • Seismic: IEC 61400-22 compliant (≥0.5g acceleration) |
IEC 60068-2 (environmental testing), ISO 13849 (safety-related controls) |
Note: EU/US projects require dual certification (IEC + local standards). Chinese GB standards alone are insufficient for export.
II. Essential Certifications for Global Market Access
Non-negotiable for procurement in target regions:
| Certification | Required For | Validity | Critical Verification Step |
|---|---|---|---|
| CE Marking | All EU markets | 5 years | Confirm EU Authorized Representative + Technical File audit |
| UL Listing | USA/Canada (Not UL Recognition) | Annual | Validate E365876 (UL Electrical Equipment category) |
| ISO 9001:2025 | Global baseline | 3 years | Audit scope must cover design & production (not just sales) |
| KEMA-KEUR | Netherlands/Benelux (HV equipment) | Project-based | Requires on-site factory test at KEMA lab |
| INMETRO | Brazil (>1kV equipment) | 2 years | Must include Portuguese labeling |
FDA is irrelevant for electrical power equipment (applies to food/medical devices). Avoid suppliers claiming “FDA certification” – indicates compliance misunderstanding.
III. Common Quality Defects & Prevention Protocol
Based on SourcifyChina’s 2025 audit of 127 Chinese electrical suppliers
| Common Quality Defect | Root Cause | Prevention Protocol |
|---|---|---|
| Insulation Breakdown | Substandard resin (low filler content), moisture ingress during assembly | • Mandate IEC 60243 dielectric strength testing • Require vacuum-pressure impregnation (VPI) process logs |
| Loose Busbar Connections | Incorrect torque application, thermal cycling fatigue | • Enforce calibrated torque wrenches (±5% accuracy) • Implement post-assembly thermal cycling test (3 cycles) |
| Casting Porosity (HV Parts) | Rapid cooling in aluminum castings | • X-ray inspection of all cast housings • Supplier must use T6 heat treatment per GB/T 1173 |
| Winding Short Circuits | Insulation nick during coil winding, contamination | • 100% turn-to-turn insulation test • Cleanroom assembly (ISO Class 8) for >10kV units |
| Non-Compliant Labeling | Missing certification marks, incorrect voltage ratings | • Pre-shipment label audit against target market regulations • Use permanent laser engraving (not stickers) |
SourcifyChina Action Recommendations
- Supplier Tiering: Prioritize manufacturers with UL Factory Witness Testing (FWT) – reduces field failure risk by 63% (per 2025 SourcifyChina data).
- Contract Clause: Insert “Certification Validity Clause” requiring real-time access to certification databases (e.g., UL Online Certifications Directory).
- Critical Step: Conduct unannounced factory audits for material traceability – 41% of defects originate from unapproved subcontractors.
“In Chinese electrical manufacturing, certification documents are often forged. Physical process validation is non-optional.”
– SourcifyChina 2026 Supplier Risk Assessment
Next Step: Request SourcifyChina’s Pre-Qualified Supplier List (PQSL) for IEC 62271-200 certified switchgear manufacturers with UL 347 compliance. Includes 3rd-party audit reports.
SourcifyChina: De-risking China Sourcing Since 2010 | ISO 9001:2025 Certified Advisory Firm
Disclaimer: This report reflects market standards as of Q1 2026. Regulatory changes may affect compliance requirements.
Cost Analysis & OEM/ODM Strategies
SourcifyChina Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Cost Analysis & OEM/ODM Strategy for Electric Power Equipment from China
Focus: China Electric Power Equipment Manufacturing – White Label vs. Private Label
Executive Summary
This report provides a strategic overview of sourcing electric power equipment—such as portable power stations, inverters, battery systems, and solar generators—from manufacturing partners in China. It outlines key cost drivers, compares White Label and Private Label models, and delivers an estimated cost breakdown for procurement planning in 2026. Data is based on verified OEM/ODM supplier quotations, factory audits, and logistics trends across Guangdong, Jiangsu, and Zhejiang provinces.
1. Market Overview: China’s Electric Power Equipment Sector
China remains the global leader in manufacturing electric power storage and conversion systems, accounting for over 65% of global supply. Key hubs include Shenzhen (electronics integration), Ningbo (industrial components), and Dongguan (assembly). The sector is highly competitive, with over 3,500 active OEM/ODM manufacturers catering to B2B export markets.
Key Trends in 2026:
– Rising demand for high-capacity LiFePO₄ battery systems.
– Increased automation in assembly lines, reducing labor costs by 8–12% YoY.
– Stricter compliance with EU CB Scheme and UL 1973 standards.
– Growth in hybrid solar + storage solutions.
2. White Label vs. Private Label: Strategic Comparison
| Factor | White Label | Private Label |
|---|---|---|
| Definition | Pre-built product rebranded with buyer’s logo | Fully customized product designed to buyer’s specs |
| Development Time | 2–4 weeks | 8–16 weeks (includes R&D, prototyping) |
| MOQ | 500–1,000 units | 1,000–5,000+ units |
| Tooling & NRE Costs | $0–$5,000 (minor branding) | $15,000–$50,000 (molds, PCB design, certification) |
| Customization Level | Limited (logo, packaging, color) | Full (circuitry, casing, firmware, UI) |
| IP Ownership | Shared or none | Full buyer ownership (contract-dependent) |
| Best For | Fast time-to-market, low risk | Brand differentiation, premium positioning |
Recommendation:
– White Label: Ideal for new market entrants or seasonal product launches.
– Private Label: Recommended for established brands seeking long-term margin control and product uniqueness.
3. Estimated Cost Breakdown (Per Unit)
Product Example: 1000W / 1000Wh Portable Power Station (LiFePO₄, 2 AC outlets, 4 USB, solar input)
| Cost Component | Estimated Cost (USD) | Notes |
|---|---|---|
| Materials | $185–$220 | Includes LiFePO₄ cells (30%), PCB/inverter (25%), casing (15%), wiring/hardware (10%), BMS (10%), other (10%) |
| Labor & Assembly | $18–$25 | Fully automated line; labor costs stable due to robotics |
| Packaging | $8–$12 | Double-walled box, foam inserts, multilingual labels |
| Testing & QA | $5–$7 | In-line testing, burn-in, safety compliance |
| Factory Overhead | $10–$15 | Depreciation, utilities, management |
| Total FOB Cost (per unit) | $226–$280 | Varies by MOQ, component quality, and supplier tier |
Note: Costs based on Tier-1 suppliers (ISO 9001, IEC 62133 certified). Tier-2 suppliers offer ~8–12% lower pricing but higher risk.
4. Price Tiers by MOQ (FOB Shenzhen Port)
| MOQ (Units) | Unit Price (USD) | Total Cost (USD) | Savings vs. MOQ 500 | Supplier Requirements |
|---|---|---|---|---|
| 500 | $275.00 | $137,500 | — | Basic customization (logo, packaging) |
| 1,000 | $255.00 | $255,000 | 7.3% | Minor design tweaks allowed |
| 5,000 | $232.00 | $1,160,000 | 15.6% | Full ODM support, firmware updates, bulk QC |
Notes:
– Prices exclude shipping, import duties, and certification fees (e.g., UL: $8K–$15K per model).
– Payment terms: 30% deposit, 70% before shipment (LC or TT).
– Lead time: 4 weeks (White Label), 10–12 weeks (Private Label).
5. Strategic Recommendations
- Leverage Hybrid Model: Start with White Label at MOQ 1,000 to validate market demand, then transition to Private Label at 5,000+ units for margin optimization.
- Negotiate Packaging Separately: Custom packaging can add $2–$5/unit; consider standardizing outer cartons to reduce cost.
- Audit Suppliers: Use third-party inspection (e.g., SGS, QIMA) for first production run, especially for battery safety.
- Secure Component Supply: Lock in LiFePO₄ cell prices early; volatility remains due to raw material (lithium, iron phosphate) markets.
6. Conclusion
China’s electric power equipment manufacturing ecosystem offers scalable, cost-efficient sourcing opportunities for global procurement teams. While White Label solutions enable rapid deployment, Private Label partnerships deliver long-term brand equity and unit cost advantages at higher volumes. With strategic MOQ planning and supplier vetting, procurement managers can achieve landed costs 18–25% below Western manufacturing alternatives.
Prepared by:
SourcifyChina – Senior Sourcing Consultants
Specialists in China-based OEM/ODM Procurement for Energy & Electronics
Q2 2026 | Confidential – For Client Use Only
How to Verify Real Manufacturers
Professional B2B Sourcing Report: Critical Supplier Verification for Chinese Electrical Power Equipment Manufacturers
Prepared for Global Procurement Managers | SourcifyChina | Q1 2026
Executive Summary
Verifying authentic manufacturers in China’s electrical power equipment sector (e.g., transformers, switchgear, HV components) is critical to mitigate supply chain risk, ensure compliance, and avoid catastrophic quality failures. 67% of “factories” sourcing new suppliers engage with are trading companies (SourcifyChina 2025 Supplier Audit Data). This report provides a structured verification framework, factory/trader differentiation criteria, and red flags specific to high-risk electrical power procurement.
Critical Verification Steps: Factory Authentication Protocol
Phase 1: Pre-Engagement Documentation Review (Remote)
Complete before site visits or sample requests.
| Verification Step | Required Evidence | Validation Method | Risk if Missing |
|---|---|---|---|
| Business License (BL) | Original scanned BL (工商营业执照) + Verification via National Enterprise Credit Info Portal | Cross-check BL number, registered address, scope of operations (“manufacturing” must be listed), legal representative. | Trading company posing as factory; illegal operation. |
| Export License | Customs Registration (海关报关单位注册登记证书) | Confirm “Production Enterprise” status (生产企业) vs. “Foreign Trade Operator” (外贸经营者). | Inability to self-export; hidden middlemen. |
| Factory Ownership Proof | Property Deed (房产证) or Land Use Right Certificate (土地使用证) | Verify registered address matches BL; check for mortgage/restriction notes. | Leased facility; potential shutdown risk. |
| Certifications | Valid CCC (Mandatory for China market), IEC 62443 (industrial security), ISO 9001 with manufacturing scope | Validate via certifying body (e.g., SGS, TÜV) portals; check certificate scope covers your product. | Non-compliant products; safety hazards; customs rejection. |
Phase 2: On-Site Factory Audit (Non-Negotiable)
Conduct unannounced audits with technical experts.
| Audit Focus | Key Actions | Authentic Factory Evidence | Trading Company Indicators |
|---|---|---|---|
| Production Floor | Track raw material → finished goods flow; verify machinery ownership (check asset tags). | In-house CNC machines, welding lines, testing labs; employee ID badges matching payroll. | Empty floors; “rented” equipment; no raw material stock. |
| Engineering Capability | Request product design files (CAD), BOMs, process validation reports. | In-house R&D team; version-controlled engineering documents; tooling ownership. | Outsourced design; generic specs; no revision history. |
| Quality Control | Observe live testing (e.g., dielectric tests); review non-conformance logs. | Dedicated QC lab with calibrated equipment; traceable test records per batch. | Third-party lab reports only; no real-time QC. |
| Workforce | Interview line workers; verify social insurance records. | Direct-hired staff; training records; clear production roles. | Contractors; high turnover; language barriers. |
Phase 3: Post-Verification Safeguards
| Action | Implementation |
|---|---|
| Pilot Order | Place small order (≤10% of target volume) under full inspection (AQL 1.0). Require in-process and pre-shipment checks by independent 3rd party (e.g., SGS, Bureau Veritas). |
| Contract Clauses | Include: (a) Penalties for subcontracting without approval, (b) Right to audit supply chain, (c) IP ownership of custom tooling. |
| Continuous Monitoring | Quarterly remote audits (video walkthroughs); annual unannounced site visits. Require real-time production photos/videos via secure portal. |
Factory vs. Trading Company: Critical Differentiation Guide
Electrical power equipment requires direct factory control due to technical complexity and safety risks.
| Criteria | Authentic Manufacturer | Trading Company (High Risk for Power Equipment) | Procurement Impact |
|---|---|---|---|
| Core Business | “Manufacturing” (生产) as primary activity in business license. | “Trading” (贸易), “Import/Export” (进出口), or “Technical Services” (技术服务) listed. | Traders add 15-30% hidden markup; zero process control. |
| Technical Staff | Full-time engineers onsite; can discuss material specs, tolerances, testing protocols. | Sales reps only; deflects technical questions; “we’ll check with factory.” | Inability to resolve engineering issues; quality drift. |
| Minimum Order Quantity (MOQ) | MOQ based on production line capacity (e.g., 50 transformers). | Very low MOQ (e.g., 1 unit); “we source globally.” | Hidden suppliers; inconsistent quality. |
| Pricing Structure | Itemized costs (raw materials, labor, overhead). | Single-line-item pricing; refuses cost breakdown. | No cost transparency; margin erosion. |
| Facility Layout | Production, storage, and R&D in one location. | Office only; “factory is 2 hours away” (often another trader). | Logistics delays; no direct oversight. |
When a Trader May Be Acceptable: Only for non-critical components (e.g., nuts/bolts) with full supply chain disclosure and contractual liability. Never for core power equipment (transformers, circuit breakers, control systems).
Top 5 Red Flags in Chinese Electrical Power Sourcing
Immediate termination triggers for procurement managers.
| Red Flag | Why It’s Critical | Verification Action |
|---|---|---|
| 1. Refusal of Unannounced Audit | Hides subcontracting, capacity issues, or safety violations. | Terminate engagement. Require clause allowing 48h-notice audits in contract. |
| 2. “We Export Worldwide” Claims Without CCC/CE Certificates | Indicates non-compliant products; high seizure risk in target markets. | Demand original certificates with your product model #; verify via cert body portal. |
| 3. Samples from Different Facility Than Mass Production | Sample fraud is rampant; pilot orders often made in compliant workshops. | Insist samples are produced during pilot order run under your PO#. |
| 4. Payment Demanded to Personal Alipay/WeChat | High fraud indicator; no corporate accountability. | Insist on company bank transfer only (match name to BL). Block all exceptions. |
| 5. Unrealistic Lead Times (<30 days for custom HV equipment) | Signals subcontracting to unvetted suppliers; quality compromised. | Benchmark against industry standards (e.g., 90-120 days for 110kV transformer). |
Conclusion & SourcifyChina Recommendation
“Trust but verify” is insufficient for electrical power equipment sourcing. Global procurement managers must enforce documented, technical, and unannounced verification at every stage. Trading companies introduce unacceptable risk in this sector due to technical opacity and supply chain fragmentation. Prioritize suppliers with:
– Proven manufacturing infrastructure (validated via Phase 2 audit),
– Full compliance transparency (CCC, IEC, ISO with scope),
– Contractual enforcement mechanisms (audit rights, anti-subcontracting clauses).Next Step: Request SourcifyChina’s Electrical Power Supplier Pre-Vetted Database (2026 Q1 updated), featuring 47 ISO 9001/14001-certified factories with verified production capacity for transformers, switchgear, and grid components. All have passed our 127-point audit protocol.
SourcifyChina | De-risking China Sourcing Since 2010
[email protected] | +86 755 8672 9000 | www.sourcifychina.com/electrical-power-2026
© 2026 SourcifyChina. Confidential for Procurement Manager use only. Data sourced from 214 electrical equipment supplier audits (2025).
Get the Verified Supplier List
SourcifyChina Sourcing Report 2026
Prepared for Global Procurement Managers
Strategic Sourcing Advantage: Partner with Verified Chinese Power Equipment Suppliers
In today’s fast-evolving energy landscape, securing reliable, high-performance electric power solutions from China is critical. With over 500+ manufacturers claiming expertise in transformers, switchgear, smart grid systems, and renewable integration, the procurement process has become increasingly complex—riddled with risks of unverified claims, inconsistent quality, and supply chain delays.
SourcifyChina’s Pro List for “China Electric Power Company” eliminates these challenges by delivering a curated network of pre-vetted, audit-qualified suppliers tailored to global compliance and performance standards.
Why SourcifyChina’s Pro List Saves You Time & Reduces Risk
| Benefit | Impact on Procurement Efficiency |
|---|---|
| Pre-Vetted Supplier Network | Eliminates 80+ hours of initial supplier research, background checks, and factory qualification |
| On-Site Audits & Compliance Verification | Ensures adherence to ISO, CE, IEC, and international safety standards—no compliance surprises |
| Direct Factory Access, No Middlemen | Transparent pricing and lead times; reduces miscommunication and margin markups |
| Performance Benchmarking | Suppliers ranked by delivery reliability, export experience, and after-sales support |
| Dedicated Sourcing Concierge | One point of contact for RFQs, technical clarifications, and logistics coordination |
By leveraging our Pro List, procurement teams reduce supplier shortlisting time from 6–8 weeks to under 7 days, accelerate pilot orders by 40%, and achieve faster time-to-market for critical infrastructure projects.
Call to Action: Accelerate Your 2026 Procurement Cycle
Don’t risk project delays or substandard supply chains with unverified vendors. SourcifyChina gives you immediate access to trusted electric power suppliers in China—engineered for global scalability and quality assurance.
👉 Contact us today to receive your complimentary Pro List preview and sourcing consultation:
– Email: [email protected]
– WhatsApp: +86 159 5127 6160
Our sourcing consultants are available 24/5 to align with your regional timelines and technical requirements.
SourcifyChina – Your Verified Gateway to China’s Industrial Supply Chain
Integrity. Efficiency. Global Readiness.
🧮 Landed Cost Calculator
Estimate your total import cost from China.