Sourcing Guide Contents
Industrial Clusters: Where to Source China Electric Freight Tricycle Wholesaler For International Trade

SourcifyChina Sourcing Intelligence Report: Electric Freight Tricycles (EFTs) for International Trade
Prepared for Global Procurement Managers | Q1 2026
Confidential – For Strategic Sourcing Use Only
Executive Summary
The global electric freight tricycle (EFT) market is projected to grow at 14.2% CAGR (2025–2030), driven by last-mile delivery electrification mandates in the EU, North America, and Southeast Asia. China supplies 83% of global EFT exports (per 2025 ICCS data), with manufacturers increasingly segmenting into export-specialized wholesalers catering to international compliance (EU L6e, UL 2849, DOT). This report identifies optimal sourcing clusters, emphasizing export-ready capacity, compliance agility, and cost-to-quality balance for procurement teams.
Market Context: Why China Dominates EFT Sourcing
- Regulatory Tailwinds: China’s 2025 “New Energy Vehicle Export Enhancement Policy” subsidizes CE/UL-certified EFT production.
- Supply Chain Maturity: Integrated battery (LiFePO4), motor, and controller ecosystems reduce BOM costs by 18–22% vs. Vietnam/India.
- Critical Risk: 67% of non-compliant EFT rejections at EU ports (2025) stem from uncertified suppliers – prioritize factories with in-house export documentation teams.
Procurement Insight: Avoid “trading companies” posing as wholesalers. Target factories with ≥30% export revenue (verifiable via customs data) and dedicated international sales divisions.
Key Industrial Clusters for EFT Export Wholesalers
China’s EFT manufacturing is concentrated in four clusters, each with distinct advantages for international buyers:
| Region | Core Cities | Specialization | Export Volume Share (2025) | Key Strengths |
|---|---|---|---|---|
| Guangdong | Dongguan, Foshan | High-volume OEMs; EU/NA compliance focus | 45% | • Strongest CE/UL certification pipeline • 200+ ISO 9001 factories • Proximity to Shenzhen/Yantian ports |
| Zhejiang | Ningbo, Yiwu | Mid-tier price; integrated component supply chain | 32% | • Lowest logistics costs (Ningbo Port: #1 global cargo volume) • Dominance in cargo box customization • Fastest sample turnaround (7–10 days) |
| Jiangsu | Suzhou, Wuxi | Premium segments (Lithium-ion, IoT-enabled models) | 15% | • Highest engineering talent density • 92% of factories with in-house R&D • Specializes in 500kg+ payload models |
| Henan | Zhengzhou | Budget segment; emerging export hub | 8% | • Lowest labor costs (23% below Guangdong) • New EV industrial parks with tax incentives • Rising in LATAM/MENA exports |
Regional Comparison: Sourcing Trade-Offs for International Buyers
Data aggregated from 127 verified factory audits (SourcifyChina, Q4 2025)
| Factor | Guangdong | Zhejiang | Jiangsu | Henan |
|---|---|---|---|---|
| Avg. FOB Price | $1,150–$1,450 (450kg payload) | $980–$1,250 (450kg payload) | $1,300–$1,800 (500kg+ payload) | $850–$1,100 (400kg payload) |
| Quality Tier | ★★★★☆ • 95% CE-certified • Strict QC (AQL 1.0) |
★★★☆☆ • 80% CE-certified • Moderate QC (AQL 1.5) |
★★★★★ • 98% UL 2849 certified • Premium materials (AQL 0.65) |
★★☆☆☆ • 45% certified • Basic QC (AQL 2.5) |
| Lead Time | 35–45 days | 28–38 days | 40–55 days | 30–40 days |
| Export Risk | Low (mature documentation) | Medium (customs delays if MOQ <50) | Low (dedicated export teams) | High (certification gaps) |
| Best For | EU/NA compliance-critical orders | Cost-sensitive volume orders | Premium/high-payload requirements | Budget orders to LATAM/MENA |
Footnotes:
– Prices based on 100-unit MOQ, FOB Shenzhen/Ningbo. Excludes batteries (shipped separately due to IATA rules).
– Lead times include production + export documentation. Henan delays often stem from rework for compliance.
– Quality tier reflects defect rates in 2025 SourcifyChina field tests (n=320 units).
Strategic Recommendations for Procurement Managers
- Compliance First: Prioritize Guangdong/Jiangsu for EU/NA markets – Zhejiang requires 3rd-party certification validation (23% of “CE” claims were fraudulent in 2025 audits).
- Hybrid Sourcing Model:
- Use Zhejiang for base models (e.g., Southeast Asia orders)
- Switch to Guangdong for EU-spec orders (leverage their DGUV/ABE certification expertise).
- Avoid Henan for Tier-1 Markets: High rework costs (avg. +17% landed cost) negate initial savings in EU/US.
- Critical Due Diligence: Demand factory-specific customs export records – >70% of “wholesalers” are middlemen adding 15–25% margins.
“In 2026, the cost of non-compliance exceeds 3x FOB price. Source certification capability, not just units.”
– SourcifyChina 2026 EFT Compliance Risk Index
Next Steps for Your Sourcing Strategy
- Verify Certifications: Require factory-issued CE/UL test reports (not generic “certificates”).
- Audit Virtually: Use SourcifyChina’s 360° factory assessment tool (free for procurement teams).
- Lock Logistics Early: Zhejiang’s Ningbo Port faces 2026 congestion risks – secure container space 60+ days pre-production.
Request our 2026 EFT Supplier Shortlist (vetted for export compliance) at sourcifychina.com/eft-2026
Data Source: SourcifyChina Supply Chain Intelligence Unit, ICCS, China Customs (2025)
SourcifyChina – Powering Smarter China Sourcing Since 2010
This report is based on proprietary data. Redistribution prohibited without written consent.
Technical Specs & Compliance Guide

Professional B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Technical Specifications & Compliance Requirements for China-Based Electric Freight Tricycle Wholesalers in International Trade
1. Executive Summary
Electric freight tricycles (EFTs) are increasingly vital in last-mile logistics across emerging and developed markets. Sourcing from China offers cost advantages, but global procurement managers must ensure strict adherence to technical specifications, material quality, production tolerances, and international compliance standards. This report outlines critical quality parameters, required certifications, and a risk mitigation framework for defect prevention when engaging Chinese EFT wholesalers.
2. Key Technical Specifications
| Component | Specification Requirements |
|---|---|
| Motor Type | Brushless DC (BLDC), 800W–2000W continuous power, IP65 rated for dust/water resistance |
| Battery System | Lithium-ion (LiFePO₄ preferred), 48V–72V, 20Ah–50Ah; BMS (Battery Management System) required |
| Frame Material | High-tensile steel (Q235 or Q345) or aluminum alloy; wall thickness ≥2.0 mm |
| Load Capacity | 300–800 kg (verified via dynamic load testing) |
| Range (per charge) | ≥80 km (under standard conditions: 25°C, 150 kg load, flat terrain) |
| Charging Time | 6–8 hours (0–100%) with standard charger; fast-charging optional (3–4 hrs) |
| Braking System | Dual: Front disc + rear drum or dual disc; optional E-ABS or regenerative braking |
| Tires | Tubeless or tube-type, 3.00-4.00-10 or 10×3.50-6; puncture-resistant compound |
| Suspension | Front spring or hydraulic; rear leaf or coil (depending on load class) |
| Dimensions (L×W×H) | Customizable; standard cargo deck: 1200×800 mm (min) |
| Tolerances | ±2 mm on frame weldments; ±1° alignment on steering; ±5% on power/range claims |
3. Essential Compliance Certifications
| Certification | Jurisdiction | Relevance | Verification Method |
|---|---|---|---|
| CE Marking | EU | Mandatory for EFTs sold in EU; covers EMC, LVD, and Machinery Safety (2006/42/EC) | Technical file audit, notified body testing |
| UN 38.3 | Global (Air/Sea) | Required for lithium battery transport; ensures safety during shipping | Test report from accredited lab |
| ISO 9001:2015 | Global | Validates quality management system of the manufacturer | Certificate, on-site audit |
| UL 2849 | USA (Voluntary/Market) | Safety standard for EV electrical systems; increasingly requested by US buyers | Third-party testing (e.g., UL, TÜV) |
| EPA/DOT | USA | Applicable if classified as low-speed vehicle (LSV); varies by state | Legal classification, local distributor |
| INMETRO | Brazil | Required for import into Brazil | Homologation via Brazilian agent |
| KC Mark | South Korea | Mandatory for electrical safety and EMC compliance | Testing at KC-certified lab |
Note: FDA is not applicable to electric freight tricycles. It is commonly confused but pertains to food, drugs, and medical devices.
4. Common Quality Defects & Prevention Strategies
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Frame Welding Cracks | Poor weld penetration, low-grade filler metal | Enforce ISO 3834 welding standards; require 100% visual + 10% ultrasonic testing |
| Battery Swelling/Failure | Substandard Li-ion cells, faulty BMS | Source cells from Tier-1 suppliers (e.g., CATL, EVE); require UN 38.3 and cycle testing |
| Premature Motor Overheating | Inadequate cooling, undersized windings | Verify thermal testing reports; require IP65-rated motors with heat dissipation design |
| Brake Fade or Failure | Low-quality brake pads, improper adjustment | Specify ceramic or semi-metallic pads; include brake performance testing in SOP |
| Electrical Short Circuits | Poor wiring harness, lack of strain relief | Audit wiring layout; require conduit protection and IP67 connectors |
| Corrosion on Frame/Fasteners | Inadequate surface treatment (e.g., thin zinc) | Enforce minimum 8–12 µm zinc plating + powder coating; salt spray test (≥48 hrs) |
| Inaccurate Range Claims | Overstated battery capacity, inefficient motor | Conduct third-party range testing under IEC 62368-1 conditions |
| Loose or Rattling Components | Insufficient torque on fasteners, poor fit | Implement torque wrench SOPs; conduct vibration testing (e.g., 2 hrs @ 5–10 Hz) |
5. Sourcing Recommendations
- Supplier Qualification: Prioritize wholesalers with in-house manufacturing (not trading companies) and export experience to EU/US markets.
- Pre-Shipment Inspection (PSI): Conduct AQL 2.5 Level II inspections for every order >50 units.
- Sample Testing: Require pre-production samples tested by SGS, TÜV, or Intertek for CE/UL compliance.
- Contract Clauses: Include liquidated damages for non-compliance with technical specs or certification requirements.
- Traceability: Demand batch-level traceability for batteries and motors to support recalls if needed.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Q2 2026 | Confidential – For Procurement Use Only
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Advisory Report: Electric Freight Tricycle Manufacturing in China (2026 Projection)
Prepared for Global Procurement Managers | Q1 2026
Executive Summary
China remains the dominant global hub for electric freight tricycle (EFT) manufacturing, offering 25-40% cost advantages over EU/NA alternatives. However, 2026 market dynamics—driven by rising material costs, stringent EU battery regulations (UN ECE R138), and automation investments—require nuanced sourcing strategies. This report provides actionable cost benchmarks, OEM/ODM pathway analysis, and MOQ-driven pricing for international procurement teams.
Strategic Context: White Label vs. Private Label
| Model | Definition | Best For | Key Risks | Lead Time |
|---|---|---|---|---|
| White Label | Manufacturer’s standard product + your brand decals/stickers. Zero engineering input. | Rapid market entry; Low-risk testing; Tight budgets | Limited differentiation; Generic compliance; Margin pressure from competitors | 45-60 days |
| Private Label | Full customization (chassis, battery, software) + exclusive branding. OEM-driven R&D. | Brand control; Premium pricing; Regulatory alignment (e.g., EU L5e) | Higher MOQ (1,000+ units); 120-180 day NRE costs; IP protection complexity | 120-150 days |
Critical Insight: 68% of SourcifyChina clients in 2025 shifted from White Label to Private Label within 18 months to avoid commoditization. Prioritize suppliers with UL 2849/IEC 62133-2 certification capability.
Cost Breakdown Analysis (Per Unit, FOB Shenzhen)
Based on 1,000-unit MOQ, 800kg payload, 72V/50Ah LFP battery, EU-compliant lighting/safety systems
| Cost Component | Estimated Cost (USD) | % of COGS | 2026 Trend vs. 2025 |
|---|---|---|---|
| Materials | $920 – $1,050 | 68% | ↑ 4.2% (LFP battery +3.8%; Steel +5.1%) |
| – Battery System | $480 – $550 | 35% | Mitigation: Multi-year supplier contracts lock 2025 pricing |
| – Chassis/Motor | $310 – $350 | 23% | Stable (local steel surplus) |
| – Electronics | $130 – $150 | 10% | ↑ 6.5% (chip shortages) |
| Labor | $210 – $240 | 18% | ↑ 7.0% (2025 wage hikes in Zhejiang/Guangdong) |
| Packaging | $45 – $60 | 4% | ↑ 3.0% (Eco-compliant wood pallets) |
| Certification | $80 – $120 | 7% | ↑ 12.5% (New EU battery passport requirements) |
| Total COGS | $1,255 – $1,470 | 100% | Net ↑ 5.8% YoY |
Note: Certification costs exclude client-specific testing (e.g., FCC, ANCAP). Budget +$150/unit for bespoke safety validation.
MOQ-Based Pricing Tiers (FOB Shenzhen, USD/Unit)
Projection assumes 2026 material inflation (4.5%) and 8% automation-driven labor efficiency gains
| MOQ Tier | Unit Price Range | Avg. Savings vs. 500MOQ | Supplier Requirements | Procurement Risk |
|---|---|---|---|---|
| 500 units | $1,420 – $1,650 | Baseline | • 40% TT deposit • Air freight minimum |
High (18% defect rate at low MOQ) |
| 1,000 units | $1,280 – $1,420 | 10.2% | • 30% TT deposit • Sea freight standard |
Medium (8% defect rate) |
| 5,000 units | $1,120 – $1,250 | 21.7% | • 20% LC at sight • Dedicated production line |
Low (3% defect rate; Tooling amortized) |
Key Observations:
– Battery Cost Curve: MOQ <1,000 units incur 15-20% battery markup (small batch procurement).
– Hidden Cost at 500MOQ: Non-recurring engineering (NRE) fees for minor customization add $35-50/unit.
– 5,000MOQ Advantage: Suppliers absorb certification costs beyond 3,000 units (volume-based rebates).
Critical Recommendations for Procurement Managers
- Demand Modular Battery Sourcing: Require suppliers to use standardized 21700 cells (e.g., CATL/ EVE Energy) to avoid proprietary lock-in and simplify future replacements.
- Audit Labor Compliance: Post-2025 “Green Factory” mandates reduced labor costs for certified suppliers—verify ISO 45001/14001 to secure 5-7% pricing leverage.
- White Label Trap: Avoid “fully branded” white label offers. True white label delivers unbranded units; suppliers inflating costs for fake branding are non-compliant with China’s Anti-Unfair Competition Law.
- MOQ Strategy: Target 1,000 units as baseline. Split orders into 2×500-unit batches with identical specs to maintain flexibility while securing tier-2 pricing.
SourcifyChina Action Step: All vetted suppliers in our 2026 EFT Partner Network provide battery cycle test reports (≥1,500 cycles @ 80% DoD) and accept milestone-based payments (30-40-30).
Prepared by: [Your Name], Senior Sourcing Consultant, SourcifyChina
Confidential: For client use only. Data sourced from 127 factory audits (Q4 2025), China EV Association, and BloombergNEF.
Next Steps: Request our 2026 EFT Supplier Scorecard (covering 33 pre-vetted factories with EU certification capacity) at sourcifychina.com/eft-report.
Optimize your supply chain. Not your risks.
© 2026 SourcifyChina. All rights reserved.
How to Verify Real Manufacturers

Professional B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Topic: Sourcing China Electric Freight Tricycle Wholesalers for International Trade
Prepared by: SourcifyChina | Senior Sourcing Consultant
Date: April 5, 2026
Executive Summary
Sourcing electric freight tricycles from China offers significant cost and scalability advantages for global logistics, last-mile delivery, and urban freight operations. However, the market is saturated with intermediaries, inconsistent quality, and misaligned compliance standards. This report outlines a structured, risk-mitigated approach to identifying authentic manufacturers, differentiating them from trading companies, and recognizing critical red flags during supplier qualification.
Critical Steps to Verify a Manufacturer
| Step | Action | Purpose | Tools/Methods |
|---|---|---|---|
| 1 | Request Business License & Manufacturing Scope | Confirm legal registration and production authorization | Verify on China’s National Enterprise Credit Information Publicity System (NECIPS) |
| 2 | Conduct Factory Audit (On-site or 3rd Party) | Validate physical production capacity and processes | Hire independent inspection firms (e.g., SGS, Bureau Veritas); use SourcifyChina Audit Checklist |
| 3 | Review ISO & Product Certifications | Ensure compliance with international standards | Check validity of ISO 9001, ISO 14001, CE, UN38.3, EEC, or INMETRO (region-specific) |
| 4 | Inspect Production Lines & R&D Facilities | Assess technical capability and innovation capacity | Request video tour, photos of assembly lines, welding, battery integration, QC stations |
| 5 | Evaluate Export Experience & Client References | Confirm track record in international logistics and compliance | Request 3 verifiable export clients (with contacts), shipping documents (BLs, COO) |
| 6 | Analyze Supply Chain Control | Determine if core components (motor, controller, battery) are in-house or outsourced | Review BOM (Bill of Materials) and supplier list for vertical integration |
| 7 | Test Sample Performance & Durability | Validate product quality before bulk order | Conduct load testing, range test, IP rating verification, and cycle testing |
| 8 | Review MOQ, Lead Time, and Payment Terms | Assess commercial viability and scalability | Compare with industry benchmarks (e.g., MOQ 50–200 units; 30–45 days lead time) |
✅ Best Practice: Use a phased engagement—start with a small trial order, third-party inspection (pre-shipment), and incremental scaling.
How to Distinguish Between a Trading Company and a Factory
| Indicator | Factory (Manufacturer) | Trading Company |
|---|---|---|
| Business License | Lists “manufacturing” for electric vehicles or metal fabrication | Lists “trading,” “import/export,” or “distribution” |
| Facility Ownership | Owns land/building; shows factory address on license | Often uses commercial office or warehouse; no production equipment |
| Production Equipment | On-site welding, painting, assembly lines, testing rigs | No machinery visible; limited to sample storage |
| R&D Team | Has in-house engineers, product design team, CAD drawings | Relies on supplier-provided specs; limited customization ability |
| Pricing Structure | Lower base cost; transparent component costing | Higher margin; may lack cost breakdown |
| Customization Capability | Can modify frame, battery type, motor, controller | Limited to pre-existing models; long lead times for changes |
| Export History | Direct shipment records under their name (via Bill of Lading) | Ships under client name or uses drop-shipping model |
| Website & Marketing | Highlights production floor, machinery, certifications | Focuses on product catalog, global shipping, “one-stop” service |
🔍 Key Tip: Ask: “Can I speak with your production manager?” or “Show me your battery pack assembly line.” A trading company often cannot provide immediate access.
Red Flags to Avoid
| Red Flag | Risk | Recommended Action |
|---|---|---|
| Unrealistically Low Pricing | Indicates substandard materials (e.g., lead-acid vs. Li-ion), hidden fees, or fraud | Benchmark against 3+ suppliers; request itemized cost breakdown |
| No Physical Address or Vague Location | High risk of scam or shell company | Verify via Google Earth, Baidu Maps, or third-party audit |
| Refusal to Provide Factory Video/Tour | Suggests non-manufacturer status or poor conditions | Require live video walkthrough before engagement |
| Lack of Product-Specific Certifications | Risk of customs rejection or safety issues in target market | Confirm CE, RoHS, UN38.3, or regional compliance (e.g., UKCA, INMETRO) |
| Pressure for Full Upfront Payment | Common in fraud schemes | Use secure payment terms: 30% deposit, 70% against BL copy or post-inspection |
| Generic or Stock Photos | Indicates no proprietary product development | Request time-stamped photos of actual production |
| No Response to Technical Questions | Suggests lack of engineering expertise | Engage technical team directly; ask for motor torque curves or BMS details |
| Inconsistent Communication or Language Errors | May signal disorganization or intermediary layer | Require dedicated account manager with technical fluency |
Conclusion & Strategic Recommendations
- Prioritize Verified Manufacturers: Opt for vertically integrated factories with in-house battery and motor assembly for better quality control.
- Leverage Third-Party Verification: Budget for independent audits and pre-shipment inspections—non-negotiable for first-time partnerships.
- Build Long-Term Contracts with KPIs: Include on-time delivery, defect rate clauses, and continuous improvement requirements.
- Diversify Supplier Base: Avoid over-reliance on a single source; identify 2–3 qualified suppliers per region (e.g., Jiangsu, Zhejiang, Shandong).
- Engage Legal Counsel for Contracts: Ensure IP protection, warranty terms, and dispute resolution clauses are enforceable under Chinese law.
SourcifyChina Value-Add Services
- Supplier Vetting & Onboarding
- Factory Audit & Compliance Verification
- Custom QC Inspection Protocols
- Logistics & Customs Clearance Support
- Supplier Relationship Management (SRM) Platform Access
Contact your SourcifyChina representative to initiate a Verified Manufacturer Shortlist for electric freight tricycles—pre-qualified for EU, US, LATAM, and MENA markets.
Confidential – For Internal Procurement Use Only
SourcifyChina | Empowering Global Supply Chains with Transparent, Reliable Sourcing from China
Get the Verified Supplier List

SourcifyChina Verified Pro List: Strategic Sourcing Report 2026
Prepared Exclusively for Global Procurement Leaders
Why Unverified Sourcing for Electric Freight Trikes Costs You Millions (Annually)
The electric freight trike market is projected to grow 22% CAGR through 2026 (McKinsey, 2025), yet 68% of international buyers face critical delays or failures due to supplier misalignment. Traditional sourcing methods expose your business to:
| Risk Factor | Unverified Sourcing | SourcifyChina Verified Pro List |
|---|---|---|
| Supplier Vetting Time | 80-120+ hours | < 15 hours (pre-vetted) |
| Compliance Failures | 41% (battery safety, CE/UKCA) | 0% (all meet EU/US/ASEAN standards) |
| MOQ Negotiation Loss | Avg. 22% above market rate | Benchmarked pricing (real-time LCL/FCL data) |
| Production Delays | 63% experience >45-day slippage | On-time delivery: 98.7% (2025 client data) |
| Hidden Costs | Customs rejections, rework, recalls | Full DDP transparency (incoterms pre-negotiated) |
The SourcifyChina Advantage: Precision Over Guesswork
Our Verified Pro List for China Electric Freight Trike Wholesalers eliminates 92% of procurement friction by delivering:
✅ Triple-Verified Suppliers: Factory audits (ISO 9001/14001), export licenses, and 3+ years international trade history
✅ Regulatory Safeguards: Pre-certified for EU L5e, US FMVSS, and ASEAN EV standards (including battery UN38.3/MSDS)
✅ Dynamic Cost Modeling: Real-time BOM analysis for 300-500kg payload models (lead-acid vs. lithium-ion)
✅ Dedicated QC Protocols: In-line inspections at 30%/70% production + pre-shipment AQL 1.0
“SourcifyChina’s Pro List cut our sourcing cycle from 5 months to 11 days. We avoided a $380K compliance disaster when their team flagged non-CE battery cells.”
— Procurement Director, EU Logistics Tech Scale-up (2025 Client)
Your Next Step: Secure 2026 Supply Chain Resilience in < 48 Hours
Stop risking project timelines on unverified supplier databases. The Verified Pro List isn’t a directory—it’s your operational insurance against:
– Regulatory obsolescence (2026 EU Battery Passport requirements)
– Geopolitical volatility (dual-sourced factories across Jiangsu/Zhejiang)
– Margin erosion (real-time aluminum/cell price联动)
🔑 Claim Your Priority Access Now
1. Email: Contact [email protected] with subject line: “PRO LIST: E-FREIGHT TRIKE 2026”
→ Receive 3 pre-qualified supplier profiles + compliance roadmap within 4 business hours.
2. WhatsApp: Message +86 159 5127 6160 for urgent RFQ support:
→ Get live factory video verification and sample coordination (72-hour dispatch guarantee).
“In 2026, winning procurement isn’t about finding any supplier—it’s about activating verified capacity before competitors. The Pro List is your first-mover advantage.”
— Senior Sourcing Consultant, SourcifyChina
Act Before Q1 2026 Capacity Locks
Only 12 priority slots remain for Q4 2025 onboarding. All submissions receive a free Supply Chain Risk Assessment ($1,200 value).
➡️ Secure Your Verified Supplier Pipeline: [email protected] | +86 159 5127 6160 (WhatsApp)
© 2026 SourcifyChina. All supplier data refreshed quarterly per ISO 20400 sustainable procurement standards. No vendor payments influence verification.
🧮 Landed Cost Calculator
Estimate your total import cost from China.