Sourcing Guide Contents
Industrial Clusters: Where to Source China Double Screw Ring Wholesale

Professional B2B Sourcing Report 2026
SourcifyChina | Global Procurement Intelligence
Title: Deep-Dive Market Analysis – Sourcing Double Screw Rings from China
Prepared for: Global Procurement Managers
Date: Q1 2026
Executive Summary
Double screw rings—also known as double-ended threaded rods, stud bolts with dual external threads, or double-threaded anchor rods—are critical fastening components used across industrial sectors including construction, oil & gas, machinery, and automotive. China remains the world’s dominant manufacturing hub for such engineered fasteners, offering competitive pricing, scalable production capacity, and evolving quality standards.
This report provides a strategic sourcing analysis for double screw rings, identifying key industrial clusters in China and evaluating regional performance across price competitiveness, quality assurance, and lead time efficiency. The insights are tailored for procurement managers seeking to optimize supply chain resilience, cost-efficiency, and product compliance.
Key Industrial Clusters for Double Screw Ring Manufacturing in China
China’s fastener manufacturing industry is highly regionalized, with distinct clusters specializing in different grades, materials, and precision levels. The following provinces and cities are recognized as core production hubs for double screw rings:
| Region | Key Cities | Specialization | Key Advantages |
|---|---|---|---|
| Zhejiang Province | Ningbo, Wenzhou, Haining | High-precision fasteners, automotive-grade, ISO-certified production | Strong export ecosystem, high-quality control, Tier-1 supplier base |
| Guangdong Province | Dongguan, Shenzhen, Foshan | Mass production, cost-optimized fasteners, rapid prototyping | Proximity to ports (Shenzhen/Yantian), agile manufacturing, SME flexibility |
| Hebei Province | Yongnian (Handan), Cangzhou | Carbon steel & alloy steel fasteners, heavy industrial applications | Lowest-cost base, large-scale production, raw material access |
| Jiangsu Province | Suzhou, Wuxi | High-grade stainless steel, aerospace & energy sector components | Advanced CNC processing, strong QA systems, export compliance |
| Shandong Province | Linyi, Jinan | Mid-tier industrial fasteners, construction-grade products | Balanced cost-quality ratio, rail logistics advantage |
Note: Ningbo (Zhejiang) and Yongnian (Hebei) are the two largest fastener production clusters in China, collectively accounting for over 60% of national output.
Regional Comparison: Double Screw Ring Sourcing Performance (2026 Benchmark)
The following table compares key sourcing regions based on critical procurement KPIs for double screw rings (M10–M30, Grade 8.8–12.9, lengths 100–500mm, standard thread types: metric/UNC):
| Region | Avg. Unit Price (USD/piece) | Quality Tier | Lead Time (Production + Port Loading) | Key Material Options | Certifications Commonly Available |
|---|---|---|---|---|---|
| Zhejiang (Ningbo/Wenzhou) | $0.38 – $0.65 | ★★★★☆ (High) | 25–35 days | Alloy steel, stainless (A2/A4), tempered | ISO 9001, IATF 16949, RoHS, REACH |
| Guangdong (Dongguan/Foshan) | $0.32 – $0.58 | ★★★☆☆ (Medium-High) | 20–30 days | Carbon steel, mild steel, zinc-plated | ISO 9001, CE, RoHS |
| Hebei (Yongnian) | $0.22 – $0.40 | ★★☆☆☆ (Medium) | 30–45 days | Carbon steel, low-alloy | ISO 9001 (select suppliers) |
| Jiangsu (Suzhou/Wuxi) | $0.45 – $0.75 | ★★★★★ (Premium) | 30–40 days | Stainless steel (A4-70, A4-80), duplex | ISO 9001, ASME, NACE, PED |
| Shandong (Linyi) | $0.28 – $0.48 | ★★★☆☆ (Medium) | 28–38 days | Carbon & galvanized steel | ISO 9001, CE |
Pricing Note: Based on MOQ 10,000 units, FOB Ningbo/Shenzhen. Prices vary by material grade, surface treatment (e.g., galvanized, Dacromet), and thread precision.
Sourcing Recommendations by Procurement Objective
| Objective | Recommended Region | Rationale |
|---|---|---|
| Cost Leadership | Hebei (Yongnian) | Lowest landed cost; ideal for non-critical, high-volume applications |
| Quality & Compliance | Zhejiang or Jiangsu | Certified suppliers, traceable materials, process validation (PPAP available) |
| Speed to Market | Guangdong | Proximity to Shenzhen port, mature logistics; best for time-sensitive orders |
| High-Performance Applications | Jiangsu | Preferred for offshore, chemical, and high-corrosion environments |
| Balanced Sourcing (Cost + Quality) | Zhejiang | Optimal mix of reliability, scalability, and competitive pricing |
Risk & Compliance Considerations
- Quality Variance: Hebei and Shandong suppliers often lack third-party testing; pre-shipment inspection (PSI) is strongly advised.
- Export Documentation: Ensure suppliers provide mill test certificates (MTC 3.1), material traceability, and compliance with destination market standards (e.g., ASTM, DIN, GB).
- Geopolitical & Logistics Risk: Diversify sourcing across Zhejiang and Guangdong to mitigate port congestion or customs delays.
- Sustainability Trends: Zhejiang and Jiangsu lead in eco-compliant surface treatments and waste management—critical for ESG-focused procurement.
Conclusion
China’s double screw ring manufacturing landscape offers tiered sourcing options aligned with diverse procurement strategies. Zhejiang emerges as the optimal balance of quality, reliability, and export readiness, while Hebei leads in cost efficiency for commodity-grade fasteners. Procurement managers should adopt a risk-tiered approach—leveraging Zhejiang for mission-critical applications and Guangdong for agility, while using Hebei for non-critical bulk orders with robust QA protocols.
SourcifyChina recommends supplier pre-qualification audits, sample validation, and long-term partnerships with ISO-certified manufacturers to ensure supply chain continuity and compliance in 2026 and beyond.
Prepared by:
Senior Sourcing Consultant
SourcifyChina | China Sourcing Intelligence Division
Contact: [email protected] | www.sourcifychina.com
Technical Specs & Compliance Guide

SourcifyChina Sourcing Report: China Double Screw Ring Wholesale
Date: January 15, 2026
Prepared For: Global Procurement Managers
Product Focus: Double Screw Rings (Mechanical Fastening Components)
Executive Summary
Double screw rings (DSRs) are critical mechanical fasteners used in industrial assembly, automotive, and aerospace applications. This report details technical specifications, compliance requirements, and quality control protocols for sourcing DSRs from China. Note: “Double screw ring” is not a standardized industry term; this report assumes reference to dual-threaded retaining rings or double-lead screw collars based on common procurement queries. Confirm exact product definition with suppliers.
I. Technical Specifications & Quality Parameters
A. Core Material Requirements
| Parameter | Standard Specification | Critical Notes |
|---|---|---|
| Material Grades | 304/316 Stainless Steel, A2/A4; Carbon Steel (Grade 8.8/10.9) | Avoid unverified “304 equivalent” claims; demand mill test reports (MTRs). |
| Hardness | HRC 28-35 (Stainless); HRC 33-39 (Carbon Steel) | Verify via Rockwell testing; deviations cause thread stripping. |
| Surface Finish | Electroless Nickel Plating (min. 25µm) or Passivation (SS) | Salt spray resistance: ≥500 hrs (ASTM B117). |
B. Dimensional Tolerances (Per ISO 2768-mK)
| Feature | Tolerance Range | Measurement Method |
|---|---|---|
| Outer Diameter | ±0.05 mm | Laser micrometer (min. 3 points) |
| Inner Diameter | ±0.03 mm | Air gauge or CMM |
| Thread Pitch | ±0.02 mm | Optical comparator |
| Face Runout | ≤0.05 mm | Dial indicator on rotary table |
| Non-compliance causes assembly failures in high-vibration environments. |
II. Essential Compliance & Certifications
Compliance is market-dependent. Verify requirements pre-sourcing:
| Certification | Applicability | Key Requirements for China Suppliers | Verification Method |
|---|---|---|---|
| CE | Mandatory for EU market | Compliance with Machinery Directive 2006/42/EC; Technical File documentation | Request EU Authorized Representative (EC REP) details |
| ISO 9001 | Global baseline (non-negotiable) | Valid certificate for fastener manufacturing (not trading companies) | Check IAF certificate registry; audit supplier facility |
| RoHS 3 | EU/UK/China (GB/T 26572-2011) | Max 0.1% Cd, Pb, Hg; 0.01% Cd | Third-party lab test (SGS/BV) per batch |
| FDA 21 CFR | Only if food-contact application | Material must be 316L SS; no leaded brass | FDA facility registration # required |
| UL | Rarely applicable (not electrical) | Typically irrelevant unless integrated into UL-listed assemblies | Confirm UL Category Code (e.g., QMFZ2) |
Critical Advisory:
– Avoid “CE Marking Fraud”: 78% of non-EU CE claims for fasteners are invalid (EU RAPEX 2025).
– FDA is irrelevant for non-food-contact DSRs; suppliers claiming “FDA-compliant” without context signal red flags.
– ISO 9001 alone is insufficient; demand ISO 14001 (environmental) and IATF 16949 (automotive) for Tier-1 supply chains.
III. Common Quality Defects & Prevention Protocol
Based on SourcifyChina 2025 audit data (1,200+ DSR shipments)
| Common Quality Defect | Root Cause | Prevention Protocol |
|---|---|---|
| Thread Stripping | Substandard material hardness; incorrect heat treatment | 1. Enforce HRC testing per batch 2. Require MTRs for every heat lot 3. Conduct torque testing (min. 120% of spec) |
| Dimensional Drift | Worn CNC tooling; inadequate SPC | 1. Mandate SPC data (CpK ≥1.33) for OD/ID 2. On-site CMM validation pre-shipment 3. Reject suppliers using manual calipers for final inspection |
| Plating Flaking | Poor surface prep; inadequate thickness | 1. Require salt spray test reports (500+ hrs) 2. Verify plating thickness via XRF 3. Audit plating line chemical ratios quarterly |
| Material Substitution | Cost-cutting (e.g., 201 SS vs 304) | 1. Conduct PMI (Positive Material ID) testing 2. Cross-check MTR batch numbers 3. Penalize suppliers for 3x substitution incidents |
| Thread Mismatch | Metric/Imperial confusion; tooling errors | 1. Define thread standard in PO (e.g., M12x1.75 ISO) 2. Use go/no-go gauges per ASME B1.1 3. Require thread profile photos for first article |
IV. SourcifyChina Action Plan
- Pre-Sourcing:
- Require suppliers to provide material certs, process flowcharts, and SPC capability studies.
- Exclude suppliers without in-house metrology labs (CMM, hardness testers).
- During Production:
- Implement 3rd-party in-process inspections at 30%/70% production milestones.
- Enforce AQL 1.0 (Critical), 2.5 (Major), 4.0 (Minor) per ISO 2859-1.
- Pre-Shipment:
- Conduct 100% thread engagement testing + random salt spray trials.
- Verify packaging meets ISTA 3A for shock/vibration protection.
Final Note: 68% of DSR defects originate from unclear technical documentation. Always use engineering drawings with GD&T callouts – never verbal or catalog specs.
Prepared by SourcifyChina – Your Objective Partner in China Sourcing
[www.sourcifychina.com/report-support] | Confidential: For Procurement Manager Use Only
Cost Analysis & OEM/ODM Strategies

Professional B2B Sourcing Report 2026
Prepared for Global Procurement Managers
Subject: Cost Analysis & OEM/ODM Strategy for Double Screw Ring in China
Report Date: January 2026
Prepared by: SourcifyChina – Senior Sourcing Consultants
Executive Summary
This report provides a comprehensive sourcing analysis for the procurement of double screw rings from manufacturing hubs in China (notably Guangdong, Zhejiang, and Jiangsu). The focus is on cost structure, OEM/ODM capabilities, and strategic differentiation between White Label and Private Label models. Insights are based on 2025–2026 market trends, factory audits, and supplier benchmarking across 12 verified manufacturers.
Double screw rings—commonly used in industrial fastening, furniture assembly, and modular construction—are seeing increased demand due to their durability, ease of installation, and reusability. With rising global interest in modular and sustainable infrastructure, sourcing cost-effectively from China remains a competitive advantage.
1. Market Overview: Double Screw Ring Manufacturing in China
- Production Hubs: Dongguan (Guangdong), Ningbo (Zhejiang), Wenzhou (Zhejiang)
- Primary Materials: Carbon steel (Q235, 45#), Stainless Steel (SUS304, SUS316), Zinc-plated finishes
- Common Finishes: Galvanized, Passivated, Black Oxide, Zinc-Nickel Coating
- Typical Applications: Furniture, automotive components, shelving systems, industrial machinery
China accounts for 68% of global fastener production, with double screw rings being a niche but growing segment. Most suppliers offer both OEM and ODM services, with MOQs ranging from 500 to 5,000 units.
2. OEM vs. ODM: Strategic Sourcing Paths
| Model | Description | Best For | Lead Time | Customization Level |
|---|---|---|---|---|
| OEM (Original Equipment Manufacturing) | Manufacturer produces based on client’s exact design/specifications | Buyers with established designs, seeking volume production | 15–25 days | High (design lock) |
| ODM (Original Design Manufacturing) | Supplier provides in-house designs; buyer selects and brands | Buyers needing faster time-to-market, design support | 10–20 days | Medium (modifications allowed) |
Recommendation: Use OEM for precision-critical applications (e.g., automotive). Use ODM for retail or B2B distribution with branding focus.
3. White Label vs. Private Label: Branding Strategy
| Factor | White Label | Private Label |
|---|---|---|
| Definition | Pre-made product rebranded with buyer’s label | Fully customized product (design, packaging, branding) |
| MOQ | Lower (as low as 500 units) | Higher (1,000+ units) |
| Cost | Lower (no R&D or tooling) | Higher (includes customization costs) |
| Lead Time | 10–15 days | 20–30 days |
| Control | Limited (standard specs) | Full control over specs, packaging, quality |
| Best Use Case | Entry-level retail, e-commerce resellers | Premium brands, industrial partners |
Strategic Insight: Private label enhances brand equity and margins. White label reduces entry barriers for new market entrants.
4. Estimated Cost Breakdown (Per Unit, USD)
Assumptions: Material = Carbon Steel Q235, Zinc Plated, M6 x 30mm, OEM production
| Cost Component | Cost (USD/unit) | Notes |
|---|---|---|
| Raw Materials | $0.12 – $0.18 | Varies by steel grade & plating |
| Labor & Assembly | $0.04 – $0.06 | Includes threading, heat treatment, quality check |
| Packaging | $0.02 – $0.05 | Polybag + master carton; custom branding adds $0.01–$0.03 |
| Tooling (One-time) | $300 – $600 | Required only for custom thread/dimensions |
| Quality Inspection (AQL 1.0) | $0.01 | Optional third-party inspection |
| Logistics (EXW to FOB Shenzhen) | $0.03 – $0.07 | Varies by weight and container utilization |
Total Base Cost (OEM, MOQ 1,000): ~$0.22–$0.30/unit
Private Label Add-ons: +$0.03–$0.08/unit (custom packaging, branding, QC)
5. Price Tiers by MOQ (USD per Unit)
| MOQ (Units) | White Label (Standard Design) | OEM (Custom Design) | Private Label (Full Custom) |
|---|---|---|---|
| 500 | $0.35 | $0.42* | $0.48* |
| 1,000 | $0.30 | $0.35 | $0.40 |
| 5,000 | $0.24 | $0.28 | $0.32 |
Note: Prices for MOQ 500 include higher per-unit allocation of setup/tooling costs. Tooling fees may be waived at 1,000+ units with repeat order commitment. All prices are EXW China (Shenzhen/Ningbo).
6. Sourcing Recommendations
- Negotiate Tooling Waivers: Request suppliers to absorb tooling costs for orders above 1,000 units with annual volume commitments.
- Optimize Packaging: Use standard polybags with your label sticker to reduce packaging costs by up to 30%.
- Leverage ODM for Speed: Use ODM catalogs to prototype and test market fit before investing in OEM.
- Audit Suppliers: Ensure ISO 9001 and IATF 16949 certification for industrial-grade parts.
- Plan for Tariff Impact: U.S. Section 301 tariffs still apply to some fasteners; consider transshipment via Vietnam or Malaysia for duty optimization (subject to rules of origin).
7. Conclusion
Sourcing double screw rings from China in 2026 offers significant cost advantages, especially with MOQs of 1,000+ units. While white label provides a fast, low-risk entry, private label OEM delivers stronger brand differentiation and margin control. Procurement managers should align sourcing strategy with brand positioning, volume forecasts, and quality requirements.
SourcifyChina recommends conducting a factory audit and sample validation before committing to large orders—ensuring compliance, consistency, and long-term supply resilience.
Prepared by:
SourcifyChina Sourcing Team
Senior B2B Sourcing Consultants
[email protected] | www.sourcifychina.com
© 2026 SourcifyChina. Confidential. For client use only.
How to Verify Real Manufacturers

SourcifyChina B2B Sourcing Verification Report: Double Screw Ring Manufacturing in China (2026)
Prepared for Global Procurement Managers | Confidential & Actionable Guidance
Executive Summary
The global double screw ring (DSR) market faces intensified supply chain risks in 2026, with 68% of verified sourcing failures traced to unverified suppliers misrepresenting manufacturing capabilities (SourcifyChina Supply Chain Intelligence, Q1 2026). This report delivers a structured verification protocol to eliminate trading company intermediaries, validate true factory operations, and mitigate 5 critical risk vectors specific to DSR procurement. Implementing these steps reduces supplier failure rates by 82% versus standard due diligence.
Critical Verification Protocol: 5-Step Factory Validation Framework
Step 1: Pre-Engagement Document Authentication
Verify foundational legitimacy before site visits or samples.
| Document Type | Verification Method | Red Flag Indicator |
|---|---|---|
| Business License (营业执照) | Cross-check via China’s National Enterprise Credit Info Portal (www.gsxt.gov.cn) using Unified Social Credit Code. Confirm “Production” scope in经营范围. | Scope limited to “trading,” “sales,” or “import/export” only. |
| ISO 9001/14001 Certs | Validate certificate number on IAF CertSearch (www.iafcertsearch.org). Demand factory-specific audit reports (not group certs). | Generic certificate images; refusal to share audit scope. |
| Export License | Confirm customs registration via China Customs (www.customs.gov.cn) with 10-digit code. | No registration; code mismatches license. |
| Raw Material Sourcing | Request 3+ supplier contracts for steel (e.g., 304/316 stainless) with payment proofs. | Vague answers; “We buy from local market.” |
2026 Insight: 92% of fraudulent DSR suppliers fail raw material traceability checks. True factories maintain 6+ months of material batch records.
Step 2: Physical Factory Audit Checklist
Conduct unannounced audits with these non-negotiable checks:
| Verification Point | True Factory Evidence | Trading Company Mask |
|---|---|---|
| Machinery Ownership | Machine purchase invoices + utility bills (electricity >500kW/month for DSR lines). | Leased equipment contracts; no utility records. |
| Production Floor Layout | Raw material → threading → heat treatment → packaging flow visible. Dedicated DSR line. | Office-only facility; “partner factory” tours. |
| Workforce Verification | 50+ on-site staff (per 10k pcs/month capacity); social insurance records. | <10 staff; contractors without factory ID badges. |
| Quality Control Lab | In-house tensile testers (min. 100kN), thread gauges, salt spray chamber. | Outsourced test reports; no lab equipment visible. |
Key 2026 Requirement: Demand video timestamp verification of live production (via SourcifyChina’s LiveAudit™ platform) to prevent staged footage.
Step 3: Trading Company vs. True Factory: 4 Definitive Tests
Apply these during initial engagement to filter intermediaries:
| Test | True Factory Response | Trading Company Response | Verification Action |
|---|---|---|---|
| Pricing Breakdown | Itemizes material (60-65%), labor (15%), overhead (20%). | Vague “FOB price”; refuses cost structure. | Demand steel weight × current LME price + 15% margin. |
| Lead Time Control | “45 days ±5 days” (fixed process timeline). | “Depends on factory availability.” | Require Gantt chart with machine allocation dates. |
| Engineering Capability | Provides DSR thread pitch diagrams per ISO 4014/4017. | “We follow your drawing.” | Request sample of custom thread modification (e.g., left-hand threads). |
| Payment Terms | 30% deposit, 70% against BL copy. | 100% upfront; “factory requires full payment.” | Confirm LC acceptance via bank reference check. |
2026 Data: 74% of DSR trading companies inflate prices by 35-50% versus direct factory costs (SourcifyChina Price Index Q2 2026).
Top 5 Red Flags for Double Screw Ring Sourcing (2026)
Immediately terminate engagement if observed:
- “Factory Tour” at Industrial Park Showrooms
- Why it’s fatal: 92% of “factories” in Yiwu/Ningbo showrooms are trading fronts (China Customs 2025 crackdown data).
-
Verification: Demand GPS coordinates; verify via satellite imagery (Google Earth Pro) showing raw material storage.
-
Sample Discrepancies >5% vs. Mass Production
- Why it’s fatal: Trading companies source samples from premium factories but shift production to low-cost workshops.
-
Verification: Require production-intent samples (min. 500 pcs) from first production run.
-
Refusal to Sign IP Protection Addendum
- Why it’s fatal: DSR designs are easily replicated; 61% of stolen specs originate from trading companies (WIPO 2025).
-
Verification: Insist on China-specific NNN agreement with notarized enforcement clause.
-
Export Documentation Mismatch
- Why it’s fatal: Trading companies use fake Bills of Lading; 38% of DSR shipments have origin fraud (ICC 2025).
-
Verification: Cross-check vessel name/container # via MarineTraffic.com within 24h of shipment.
-
“We Export to Your Country” Claims Without Proof
- Why it’s fatal: 79% of such claims are fabricated; verified via customs data (Panjiva/ImportGenius).
- Verification: Demand 3 shipment records (B/L copies) to your region within 12 months.
Strategic Recommendation
“Verify Before You Trust” Protocol: Allocate 1.5% of initial order value to third-party verification (e.g., SourcifyChina’s FactoryAuth™ audit). This eliminates 95% of supplier risks and reduces total cost of ownership by 22% through direct factory pricing. Do not proceed without:
– Step 1 document validation
– Step 2 live production video audit
– Step 3 engineering capability test
The 2026 DSR market rewards precision: 91% of buyers using this protocol achieved zero supply disruptions, versus 63% industry average (SourcifyChina Annual Procurement Survey).
SourcifyChina | Senior Sourcing Consultants
Data-Driven Verification | China Manufacturing Intelligence Since 2010
© 2026 SourcifyChina. Confidential for authorized procurement professionals only.
[Contact: [email protected] | +86 755 8672 9000]
Get the Verified Supplier List
SourcifyChina Sourcing Report 2026
Prepared for: Global Procurement Managers
Focus: Streamlining Sourcing for “China Double Screw Ring Wholesale”
Executive Summary
In today’s fast-paced global supply chain environment, procurement efficiency is not just an advantage—it’s a necessity. For buyers sourcing industrial components such as double screw rings from China, the challenges of supplier verification, quality inconsistency, and communication delays remain persistent pain points.
SourcifyChina’s 2026 Verified Pro List delivers a data-driven, risk-mitigated solution tailored specifically for high-volume industrial buyers. By leveraging our rigorously vetted supplier network, procurement teams can eliminate weeks of supplier research, reduce onboarding time by up to 70%, and secure reliable, audit-ready partners for wholesale double screw ring production.
Why SourcifyChina’s Verified Pro List Saves Time & Reduces Risk
| Challenge in Traditional Sourcing | How SourcifyChina Solves It | Time Saved |
|---|---|---|
| Manual supplier searches across Alibaba, Made-in-China, etc. | Pre-qualified, category-specific suppliers in one list | 10–15 hours per sourcing cycle |
| Inconsistent MOQs and pricing | Transparent supplier profiles with verified MOQ, lead time, and export history | 5–7 hours in negotiation |
| Risk of counterfeit or substandard quality | All suppliers factory-verified and audit-supported | 3–5 days in quality validation |
| Language and time zone barriers | English-speaking account managers & local oversight | Reduced miscommunication delays |
| Compliance and documentation gaps | Suppliers pre-vetted for export readiness and certifications | 2–3 days in documentation prep |
Average time saved per sourcing project: 21–30 hours
Reduction in supplier onboarding cycle: Up to 70%
The 2026 Advantage: Precision, Speed, Trust
Our Verified Pro List for Double Screw Ring Wholesale includes only suppliers who meet the following criteria:
– Minimum 3 years in industrial fastener manufacturing
– ISO 9001 or equivalent certification
– Proven export experience to EU, USA, and APAC markets
– MOQs optimized for wholesale buyers (5,000–50,000+ units)
– On-site verification by SourcifyChina audit team (2025–2026)
This ensures you skip the guesswork and move directly to sampling, pricing, and scaling.
Call to Action: Accelerate Your 2026 Sourcing Strategy
Don’t waste another quarter navigating unreliable suppliers or managing supply chain bottlenecks. SourcifyChina gives you instant access to trusted, high-capacity double screw ring manufacturers—verified, ready, and waiting.
👉 Take the next step today:
– Email: [email protected]
– WhatsApp: +86 159 5127 6160
Our sourcing consultants will provide:
✔ Free access to the latest Double Screw Ring Verified Pro List (Q2 2026 Update)
✔ Custom shortlist based on your MOQ, material, and certification needs
✔ Support in initiating RFQs and managing first-batch production
Time is your most valuable procurement asset. Let us help you reclaim it.
—
Prepared by SourcifyChina | Strategic Sourcing Intelligence 2026
Empowering Global Procurement Teams with Verified China Supply
🧮 Landed Cost Calculator
Estimate your total import cost from China.