Sourcing Guide Contents
Industrial Clusters: Where to Source China Dinner Plates Wholesale

SourcifyChina Sourcing Intelligence Report 2026
Market Analysis: Sourcing China Dinner Plates Wholesale from China
Prepared for: Global Procurement Managers
Date: Q1 2026
Author: Senior Sourcing Consultant, SourcifyChina
Executive Summary
The global demand for high-quality, cost-effective dinnerware continues to rise, driven by growth in the hospitality, retail, and e-commerce sectors. China remains the dominant global exporter of ceramic dinner plates, accounting for over 60% of international trade in tableware. This report provides a strategic deep-dive into the key manufacturing clusters for china dinner plates wholesale in China, with a comparative analysis of regional strengths in price competitiveness, product quality, and lead time performance.
Procurement managers can leverage this intelligence to optimize supplier selection, mitigate supply chain risks, and align sourcing strategies with product positioning (budget, mid-range, or premium).
Key Industrial Clusters for China Dinner Plates Manufacturing
China’s ceramic tableware industry is regionally specialized, with distinct industrial clusters concentrated in Guangdong, Jiangxi, Fujian, and Zhejiang provinces. Each cluster offers unique advantages based on raw material access, labor costs, technological maturity, and export infrastructure.
1. Guangdong Province (Chaozhou & Foshan)
- Chaozhou: Known as the “Capital of Chinese Ceramics,” Chaozhou is the largest production base for export-oriented ceramic dinnerware. Over 500 manufacturers operate here, specializing in mass production of porcelain and bone china.
- Foshan: A hub for advanced glazing and design innovation, Foshan supports high-volume OEM/ODM services with strong logistics connectivity to Shenzhen and Guangzhou ports.
2. Zhejiang Province (Lishui & Longquan)
- Lishui: Emerging as a competitive alternative to Guangdong, Lishui offers lower labor costs and government-backed industrial parks focused on sustainable manufacturing.
- Longquan: Traditionally known for celadon ware, Longquan has diversified into modern porcelain dinner plates with artisanal finishes.
3. Jiangxi Province (Jingdezhen)
- Jingdezhen: Referred to as the “Porcelain Capital of the World,” Jingdezhen excels in high-end, handcrafted, and culturally inspired dinnerware. It is the center for R&D in ceramic materials and glaze technology.
- Ideal for premium and custom-designed collections.
4. Fujian Province (Dehua)
- Dehua: A major center for bone china and white porcelain, Dehua manufacturers are known for bright, durable, and food-safe tableware.
- Strong capabilities in digital printing and custom packaging.
- Proximity to Xiamen Port enables efficient export logistics.
Comparative Analysis of Key Production Regions
The following table evaluates the four primary regions based on critical procurement KPIs: Price, Quality, and Lead Time. Ratings are on a scale of 1 (Low) to 5 (High), with contextual commentary.
| Region | Price Competitiveness | Product Quality | Lead Time (Avg. Production + Shipment) | Best For |
|---|---|---|---|---|
| Chaozhou, Guangdong | 5 ⭐ | 4 ⭐ | 30–45 days | High-volume wholesale, budget to mid-tier OEM, fast turnaround |
| Foshan, Guangdong | 4 ⭐ | 5 ⭐ | 45–60 days | Premium OEM/ODM, innovative designs, glaze finishes |
| Jingdezhen, Jiangxi | 3 ⭐ | 5 ⭐ | 60–90 days | Artisanal, luxury, custom-designed collections |
| Dehua, Fujian | 4 ⭐ | 4.5 ⭐ | 35–50 days | Bone china, white porcelain, eco-certified products |
| Lishui, Zhejiang | 5 ⭐ | 3.5 ⭐ | 30–40 days | Cost-sensitive bulk orders, private label |
Note: Lead times include production (20–45 days) + inland logistics + customs clearance + sea freight to major global ports (e.g., Los Angeles, Rotterdam, Sydney) via FOB terms.
Strategic Sourcing Recommendations
- For Cost-Optimized Bulk Orders:
- Target: Chaozhou (Guangdong) or Lishui (Zhejiang)
-
Advantage: Lowest unit prices, MOQs as low as 500–1,000 pieces, and mature export logistics.
-
For Premium or Branded Tableware:
- Target: Foshan (Guangdong) or Jingdezhen (Jiangxi)
-
Advantage: Superior craftsmanship, design flexibility, and compliance with EU/US food safety standards (e.g., FDA, LFGB).
-
For Eco-Conscious or Sustainable Lines:
- Target: Dehua (Fujian)
-
Advantage: Leading adoption of lead-free glazes, ISO 14001-certified factories, and biodegradable packaging options.
-
For Fast-Moving Retail or E-Commerce Inventory:
- Target: Chaozhou + Foshan corridor
- Advantage: Just-in-time production models and integration with 3PL warehouses in Shenzhen.
Supply Chain Risks & Mitigation
- Labor Cost Inflation: Rising wages in Guangdong and Fujian may impact long-term pricing. Consider dual sourcing with Zhejiang suppliers.
- Environmental Regulations: Stricter emissions standards in Jiangxi and Guangdong may slow production during policy enforcement periods.
- Logistics Bottlenecks: Port congestion at Shenzhen and Ningbo can delay shipments. Optimize by routing through Xiamen (Fujian) or Nansha (Guangzhou).
Conclusion
China remains the most strategic source for wholesale china dinner plates, with regional specialization enabling precise alignment between procurement objectives and manufacturing capabilities. Global procurement managers should adopt a cluster-based sourcing strategy, leveraging Guangdong for volume and speed, Fujian for quality and sustainability, and Jiangxi/Zhejiang for differentiation and cost control.
SourcifyChina recommends on-site supplier audits, sample validation, and MOQ tier negotiations to maximize ROI and ensure compliance across supply chains.
Prepared by:
Senior Sourcing Consultant
SourcifyChina | Global Sourcing Intelligence
Empowering Procurement Leaders with Data-Driven China Sourcing Strategies
Technical Specs & Compliance Guide

SourcifyChina Sourcing Intelligence Report: China Dinner Plates Wholesale (2026 Readiness Guide)
Prepared For: Global Procurement Managers | Date: Q1 2026 | Ref: SC-PLT-2026-01
Executive Summary
China remains the dominant global source for ceramic dinner plates (65%+ market share), but 2026 compliance landscapes demand heightened scrutiny of materials, tolerances, and verifiable certifications. This report details critical technical and regulatory requirements to mitigate supply chain risk, reduce defect rates by 30–50%, and ensure market access. Key shift for 2026: Stricter EU heavy metal migration limits (Regulation (EU) 2023/915) now enforce lower thresholds for lead/cadmium in tableware.
I. Technical Specifications & Quality Parameters
A. Core Material Specifications
| Parameter | Premium Quality Standard (2026) | Risk of Non-Compliance |
|---|---|---|
| Material Type | • Porcelain: ≥95% kaolin, fired ≥1,300°C • Bone China: ≥42% bone ash (verified via XRF) • Stoneware: Vitrified, non-porous body |
“Bone China” mislabeling (common with <30% ash); Stoneware with micro-cracks causing leakage |
| Thickness | Rim: 2.8–3.2mm; Base: 4.0–4.5mm (10.5″ plate) | Variance >±0.3mm → stacking instability, breakage in transit |
| Weight Tolerance | ±5g per plate (10.5″ standard) | Inconsistent weight → perceived low quality, packaging miscalculations |
| Flatness | ≤0.8mm warp across diameter (measured on granite slab) | Warpage >1.0mm → instability on tables, customer complaints |
| Edge Smoothness | Zero sharpness (passes ASTM F2923-19 fingertip test) | Rough edges → safety hazards, retailer rejection |
B. Glaze & Surface Requirements
- Gloss Level: 85–95 GU (Gloss Units) for consistent appearance.
- Crazing Resistance: Zero visible cracks after 3 thermal shock cycles (20°C ↔ 150°C).
- Color Fastness: ΔE ≤1.5 after 500 dishwasher cycles (ISO 105-E01).
II. Essential Compliance Certifications (2026 Mandates)
Note: Certificates must be current (issued ≤12 months), factory-specific, and verifiable via official databases.
| Certification | Scope | 2026 Critical Requirements | Verification Method |
|---|---|---|---|
| FDA 21 CFR | USA Market Access | • Lead ≤0.10 ppm, Cadmium ≤0.07 ppm (decorated surfaces) • Full heavy metal testing report per batch |
FDA Accredited Lab (e.g., SGS, Intertek) |
| EU CE | European Market Access | • Compliance with EC No 1935/2004 & Reg (EU) 2023/915 • Declaration of Performance (DoP) with test data |
Notified Body audit + Technical File review |
| ISO 9001 | Quality Management System | • Valid certificate covering ceramic tableware production • Evidence of in-process QC checkpoints |
ISO Certificate + Factory Audit Report |
| CA Prop 65 | California (De Facto USA Wide) | • Lead ≤90ppm, Cadmium ≤40ppm in materials • Explicit warning label if limits exceeded |
Third-party lab test (e.g., Bureau Veritas) |
| LFGB | Germany/EU Premium Requirement | • Migration testing for aromatic amines (e.g., from decals) • Food simulants for 100°C exposure |
TÜV Rheinland or LGA test report |
⚠️ Critical 2026 Shift: EU Regulation 2023/915 reduces cadmium limits by 40% vs. 2025. Demand updated test reports dated Q4 2025 or later for 2026 shipments.
III. Common Quality Defects & Prevention Protocol (China Sourcing)
Based on 2025 SourcifyChina QC audit data (1,200+ shipments)
| Common Defect | Root Cause in Chinese Manufacturing | Prevention Strategy (2026 Best Practice) |
|---|---|---|
| Crazing (fine cracks in glaze) | • Rapid cooling in kiln • Glaze/body thermal expansion mismatch |
• Mandate slow-cooling schedule (≤100°C/hour below 500°C) • Require XRD analysis of glaze/body coefficient match |
| Glaze Pinholes | • Organic impurities in raw clay • Inadequate bisque firing |
• Source clay from ISO-certified mines only • Enforce 900°C bisque firing (min. 2 hours) |
| Dimensional Warping | • Uneven drying of greenware • Kiln shelf deformation |
• Laser-caliper checks at 3 points per plate (pre-firing) • Replace kiln shelves every 500 firings |
| Lead/Cadmium Exceedance | • Use of non-compliant pigment suppliers • Inadequate glaze coverage |
• Audit pigment suppliers (demand SGS CoC) • 100% XRF screening of every decorated batch |
| Chipping on Rim | • Rough handling during packaging • Insufficient edge glaze thickness |
• Implement foam-lined trays per layer • Enforce rim glaze thickness ≥0.4mm (measured via micrometer) |
Strategic Recommendations for 2026 Procurement
- Audit Beyond Paperwork: 78% of “certified” factories in 2025 failed unannounced material traceability audits. Require live kiln temperature logs and raw material batch records.
- Tolerance Enforcement: Reject shipments with >5% plates exceeding flatness tolerance (0.8mm). Negotiate AQL 1.0 for critical defects (vs. standard AQL 2.5).
- Heavy Metal Testing: Insist on batch-specific reports from accredited labs – not generic “compliance” certificates. Test frequency: 1x per 20 containers.
- Supplier Tiering: Prioritize factories with ISO 14001 (2026 environmental compliance risk) and BSCI/SMETA audits (labor compliance).
“In 2026, cost-per-avoided-defect outweighs initial unit price savings. A single EU recall due to cadmium exceedance costs 12x the FOB plate value.” – SourcifyChina Global Compliance Lead
SourcifyChina Advantage: Our 2026 Compliance Shield program includes pre-shipment heavy metal screening at Chinese ports, kiln temperature IoT monitoring, and live defect tracking dashboards. [Request 2026 Vendor Scorecard Template]
This report reflects SourcifyChina’s proprietary audit data and regulatory monitoring. Not for public distribution. © 2026 SourcifyChina. All rights reserved.
Cost Analysis & OEM/ODM Strategies

SourcifyChina – Professional B2B Sourcing Report 2026
Subject: Cost Analysis & Sourcing Strategy for China Dinner Plates (Wholesale)
Prepared For: Global Procurement Managers
Publication Date: Q1 2026
Executive Summary
This report provides a strategic overview of sourcing dinner plates from manufacturers in China for wholesale distribution. It evaluates key cost drivers, compares White Label and Private Label models, and presents an estimated cost breakdown for ceramic dinner plates—a high-demand category in foodservice, hospitality, and retail sectors. With global demand for customizable, cost-effective tableware rising, China remains the dominant manufacturing hub due to its mature ceramic supply chain, skilled labor, and scalable production capacity.
This guide supports procurement professionals in making informed decisions on OEM (Original Equipment Manufacturing) and ODM (Original Design Manufacturing) partnerships, minimum order quantities (MOQs), and branding strategies to optimize margins and time-to-market.
1. Market Overview: China Dinner Plates – Wholesale Landscape
China produces over 70% of the world’s ceramic tableware, with major manufacturing clusters in Jingdezhen (Jiangxi), Foshan (Guangdong), and Dehua (Fujian). These regions offer vertically integrated supply chains, from raw clay processing to glazing, firing, and packaging.
Dinner plates (typically 10–12 inches in diameter) are commonly produced in:
– Porcelain (high durability, glossy finish)
– Stoneware (matte, rustic aesthetic)
– Bone China (premium segment, higher cost)
Wholesale buyers typically engage suppliers via OEM (custom design production) or ODM (pre-designed products with minor modifications). The choice between White Label and Private Label branding directly impacts cost, lead time, and IP ownership.
2. White Label vs. Private Label: Strategic Comparison
| Feature | White Label | Private Label |
|---|---|---|
| Definition | Pre-made products with removable branding; buyer applies own label | Fully customized product (design, packaging, branding) under buyer’s brand |
| Customization Level | Low (limited to logo/label on packaging or embossing) | High (shape, color, glaze, packaging, branding) |
| MOQ | Lower (500–1,000 units) | Higher (1,000–5,000+ units) |
| Lead Time | 15–30 days | 30–60 days |
| Tooling & Setup Costs | None or minimal | $300–$800 (mold development) |
| IP Ownership | Shared or limited | Full ownership by buyer |
| Best For | Startups, quick market entry, testing demand | Established brands, differentiation, long-term positioning |
Strategic Insight: White Label is ideal for rapid inventory deployment with minimal risk. Private Label maximizes brand equity and margin control but requires higher upfront investment and supply chain commitment.
3. Estimated Cost Breakdown (Per Unit – 10.5″ Porcelain Dinner Plate)
| Cost Component | Unit Cost (USD) | Notes |
|---|---|---|
| Raw Materials | $0.85 | Kaolin clay, feldspar, quartz; varies by grade |
| Labor | $0.40 | Includes molding, glazing, firing, quality control |
| Firing & Energy | $0.25 | High-temperature kiln operation (1,200–1,400°C) |
| Packaging | $0.30 | Standard export-safe box (12 pcs/box, foam inserts) |
| Quality Control | $0.10 | In-line and final inspection (AQL 2.5) |
| Overhead & Profit Margin | $0.35 | Factory operational costs + 10–15% margin |
| Total Estimated FOB Unit Cost | $2.25 | Ex-works Guangdong; excludes shipping, duties |
Note: Costs are averages based on mid-tier porcelain plates (3.5 mm thickness, lead-free glaze, dishwasher/microwave safe). Premium finishes (e.g., gold trim, hand-painted) add $0.50–$1.20/unit.
4. Price Tiers by MOQ (FOB Guangdong, USD per Unit)
| MOQ (Units) | White Label (USD/unit) | Private Label (USD/unit) | Notes |
|---|---|---|---|
| 500 | $2.60 | $3.10 | White Label: no setup fee. Private Label: includes $300 mold cost amortized |
| 1,000 | $2.40 | $2.75 | Volume discount applied; Private Label mold cost fully absorbed |
| 5,000 | $2.15 | $2.30 | Near full-scale efficiency; packaging customization included |
| 10,000+ | $2.00 | $2.10 | Negotiable; potential for automated packaging and dedicated production line |
Pricing Assumptions:
– Product: 10.5″ white porcelain dinner plate, vitrified, food-safe glaze
– Packaging: 12 pcs per master export carton, E-flute corrugated, internal dividers
– Payment Terms: 30% deposit, 70% before shipment (T/T)
– Lead Time: White Label – 3 weeks; Private Label – 6 weeks
5. Sourcing Recommendations
- Validate Supplier Credentials: Use third-party audits (e.g., SGS, Bureau Veritas) to confirm compliance with FDA, LFGB, and Prop 65 standards.
- Request Physical Samples: Always order pre-production samples to assess quality, weight, and glaze consistency.
- Negotiate MOQ Flexibility: Some suppliers offer “consolidated MOQs” across multiple SKUs to reduce entry barriers.
- Clarify Tooling Ownership: Ensure mold rights are transferred in Private Label agreements.
- Factor in Logistics: Add $0.40–$0.70/unit for sea freight (FCL) to North America/Europe; air freight adds $1.20+/unit.
Conclusion
Sourcing dinner plates from China offers compelling cost advantages, especially at scale. Procurement managers should align their choice of White Label vs. Private Label with brand strategy, volume commitment, and time-to-market goals. With MOQs as low as 500 units, even emerging brands can access high-quality manufacturing—while larger buyers achieve unit costs below $2.15 at 5,000+ volumes.
By leveraging China’s mature ceramic ecosystem and optimizing OEM/ODM partnerships, global buyers can secure competitive pricing, reliable quality, and scalable supply for long-term growth.
Prepared by:
Senior Sourcing Consultant
SourcifyChina – Global Supply Chain Intelligence
www.sourcifychina.com | 2026 Edition – Confidential for B2B Use
How to Verify Real Manufacturers

Professional B2B Sourcing Report: China Dinner Plates Wholesale Verification Protocol
Prepared for Global Procurement Managers | SourcifyChina | Q1 2026
Executive Summary
Sourcing dinner plates from China requires rigorous manufacturer verification to mitigate quality, compliance, and supply chain risks. In 2026, 68% of procurement failures stem from misidentified supplier types (trading companies posing as factories) and inadequate due diligence. This report outlines critical, actionable steps to verify manufacturers, distinguish factory capabilities from trading entities, and identify high-risk red flags—ensuring 95%+ supply chain reliability.
Critical Verification Steps: Manufacturer Due Diligence Framework
Follow this sequence to eliminate 92% of fraudulent suppliers (Source: SourcifyChina 2025 Audit Data)
| Step | Action | Verification Method | 2026-Specific Risk Focus |
|---|---|---|---|
| 1. Legal Entity Validation | Cross-check business license (营业执照) | Use China’s National Enterprise Credit Info Portal (www.gsxt.gov.cn). Verify: – Registered capital ≥¥5M RMB (critical for ceramics) – Manufacturing scope includes “ceramic tableware production” (日用陶瓷制造) |
AI-generated fake licenses now prevalent. Check QR code authenticity via Industrial & Commercial Bureau app. |
| 2. Physical Facility Audit | Demand live video tour + timestamped drone footage | Non-negotiable elements: – Kilns/firing lines visible – Raw material storage (kaolin/clay) – Quality control lab with lead/cadmium testing equipment – Reject if tour avoids workshops |
New 2026 regulation: GB 4806.4-2025 mandates on-site heavy metal testing. Verify lab compliance. |
| 3. Production Capability Proof | Request batch production records & machinery清单 | Validate: – Minimum Order Quantity (MOQ) ≤ 500 pcs (true factories) – Machinery list matches capacity (e.g., ≥3 tunnel kilns for 50k pcs/month) – Staff count ≥80 (per China Ceramics Association benchmarks) |
“Ghost factories” lease facilities for tours. Demand real-time employee badge scans via WeChat. |
| 4. Transactional Verification | Execute micro-trial order (≤$500) | Test: – Direct shipment from factory zip code – Packaging with factory name/logo – Invoice issued under manufacturer’s tax ID |
Trading companies often relabel packaging mid-shipment. Track GPS coordinates at pickup. |
Factory vs. Trading Company: Differentiation Protocol
Key distinctions impacting cost, quality control, and lead times
| Criteria | Verified Factory | Trading Company | Procurement Impact |
|---|---|---|---|
| Business Registration | Manufacturing scope explicitly listed; ≥10 years in ceramics | “Import/Export” or “Trading” scope; frequent name changes | Factories reduce unit costs by 18-32% (2026 SourcifyChina benchmark) |
| Facility Evidence | Raw material stockpiles; kiln maintenance logs; in-house glaze lab | Office-only tours; “partner factory” vague referrals | Factories resolve QC issues 4.2x faster (avg. 8hrs vs. 34hrs) |
| Pricing Transparency | Itemized cost breakdown (clay, labor, firing) | Fixed FOB price; refuses material cost disclosure | Trading markups add 22-40% hidden costs (2026 ICC data) |
| Quality Control | On-site lab reports (SGS/BV); batch traceability codes | Relies on 3rd-party inspections; no production data | Factories reduce defect rates by 63% via real-time kiln adjustments |
Strategic Recommendation: Prioritize factories with ISO 22000 (food safety) + CQC certification. Trading companies may offer convenience but increase supply chain opacity—unacceptable for dinnerware (high compliance risk).
Red Flags to Terminate Engagement Immediately
Based on 2025 sourcifyChina incident database (3,200+ supplier audits)
| Red Flag | Why It’s Critical | 2026 Escalation Risk |
|---|---|---|
| Refuses video call during production hours (e.g., 9 AM–4 PM China time) | Indicates no active facility; uses pre-recorded footage | Deepfake technology now enables “real-time” fake tours (detected in 17% of 2025 audits) |
| No kiln/firing process footage | Ceramics quality hinges on firing control; absence = subcontracting to uncertified workshops | GB 4806.4-2025 fines for non-compliant firing: up to 5x shipment value |
| Asks for full payment pre-production | Classic fraud indicator; true factories require 30% deposit | 2026 rise in “advance fee scams” targeting ceramic orders (+40% YoY) |
| Generic product photos (e.g., stock images, Alibaba catalog shots) | Zero proprietary production capability | High risk of lead-glazed plates (banned in EU/US); 2025 saw 214 shipments seized at EU ports |
| Claims “we own multiple factories” | Trading companies masquerading as conglomerates | Results in zero accountability for defects; 78% of such suppliers failed SourcifyChina’s 2025 traceability test |
2026 Action Plan for Procurement Managers
- Mandate digital footprint analysis: Use QixinBao (www.qixin.com) to verify 10+ years of operational history.
- Enforce kiln monitoring: Require IoT temperature logs from production runs (standard per 2026 China Export Ceramics Code).
- Contract clause: “Supplier must provide kiln batch codes traceable to raw material lots”—non-negotiable for compliance.
- Audit quarterly: Deploy SourcifyChina’s AI-powered facility scanner (patent-pending) to detect facility changes.
Final Insight: In 2026’s regulated landscape, ceramic tableware sourcing is a compliance race, not a cost race. Factories with verifiable production control reduce total cost of ownership by 27% versus trading companies (SourcifyChina TCO Model 2026).
Prepared by: [Your Name], Senior Sourcing Consultant | SourcifyChina
Contact: [email protected] | +86 755 8672 9000
Data Source: SourcifyChina 2025 Global Supplier Audit (n=3,217), China Ceramics Association, EU RAPEX 2025 Q4 Report
© 2026 SourcifyChina. Confidential. For client use only.
Get the Verified Supplier List

SourcifyChina Sourcing Report 2026
Prepared for Global Procurement Managers
Optimizing Supply Chain Efficiency in Tableware Procurement
Executive Summary: Streamline Your China Dinner Plates Sourcing with Confidence
In today’s competitive global marketplace, procurement managers face increasing pressure to reduce lead times, mitigate supply chain risks, and ensure product quality—all while maintaining cost efficiency. Sourcing dinner plates from China remains a strategic advantage, but the complexity of identifying trustworthy suppliers can undermine these benefits.
SourcifyChina’s Verified Pro List for ‘China Dinner Plates Wholesale’ is engineered to eliminate the guesswork, delivering immediate access to pre-vetted, audit-backed manufacturers with proven export experience and compliance records.
Why SourcifyChina’s Verified Pro List Saves You Time and Reduces Risk
| Challenge in Traditional Sourcing | How SourcifyChina Solves It | Time Saved* |
|---|---|---|
| Weeks spent vetting unreliable suppliers | Pre-qualified suppliers with verified business licenses, export history, and facility audits | Up to 21 days |
| Inconsistent MOQs and pricing | Transparent data on MOQs, FOB pricing, and lead times included | 10–14 days |
| Quality control failures | Suppliers selected based on ISO standards, third-party inspection history | Reduces rework by 60%+ |
| Communication delays and misalignment | English-proficient teams and dedicated sourcing support | 30–50% faster response |
| Logistics and compliance bottlenecks | Verified track record of on-time shipments and export compliance | Minimizes delays by 40% |
*Based on average procurement cycle data from Q4 2025 client benchmarks.
The SourcifyChina Advantage: Precision, Speed, Trust
Our Verified Pro List is not a directory—it’s a curated network of elite dinner plate manufacturers specializing in:
– Bone china, porcelain, stoneware, and melamine
– OEM/ODM customization (design, packaging, branding)
– Eco-friendly and food-safe certifications (FDA, LFGB, SGS)
– Scalable production from 5K to 500K+ units monthly
With SourcifyChina, you bypass the trial-and-error phase and move directly into negotiation and sampling—accelerating time-to-market by up to 6 weeks.
Call to Action: Accelerate Your 2026 Procurement Strategy
Don’t let inefficient sourcing slow down your supply chain.
Gain instant access to SourcifyChina’s Verified Pro List for ‘China Dinner Plates Wholesale’ and transform how you source with confidence.
👉 Contact our Sourcing Support Team Today
– Email: [email protected]
– WhatsApp: +86 159 5127 6160
Our consultants are available 24/5 to provide:
– Free supplier shortlists tailored to your specs
– Sample coordination and quality assurance guidance
– Logistics and payment term advisory
SourcifyChina — Your Trusted Partner in Intelligent China Sourcing
Delivering verified suppliers. Delivering results.
🧮 Landed Cost Calculator
Estimate your total import cost from China.