Deep-Dive Market Analysis: Sourcing Chinese Construction Companies Operating in Kenya
Prepared for: Global Procurement Managers
Date: Q1 2026
Author: Senior Sourcing Consultant, SourcifyChina
Executive Summary
This report provides a strategic analysis for global procurement managers seeking to engage or source services and materials through Chinese construction companies operating in Kenya. While these firms are project-executing entities in East Africa, the backbone of their supply chain—ranging from prefabricated building components, heavy machinery, structural steel, and electrical systems—originates from key industrial clusters in China. Understanding these clusters enables procurement teams to optimize sourcing strategies, manage costs, and ensure project continuity.
Chinese construction firms active in Kenya—including China Road and Bridge Corporation (CRBC), China Civil Engineering Construction Corporation (CCECC), and Sinohydro—are typically headquartered or operationally supported by manufacturing and logistics networks in China. This report identifies the primary Chinese industrial hubs supplying these firms and evaluates regional sourcing advantages.
Key Industrial Clusters Supplying Chinese Construction Firms in Kenya
Chinese construction companies executing infrastructure projects in Kenya rely on an integrated supply chain that sources materials and equipment from specialized manufacturing zones in China. The following provinces and cities are pivotal:
| Province/City | Key Industries | Relevance to Construction in Kenya |
|---|---|---|
| Guangdong (Guangzhou, Foshan, Shenzhen) | Steel structures, HVAC systems, electrical components, prefab modular buildings | Major exporter of building materials; strong logistics links to Mombasa Port via South China Sea routes |
| Zhejiang (Hangzhou, Ningbo, Wenzhou) | Construction machinery, scaffolding, formwork, cement additives | High concentration of SMEs supplying cost-effective construction tools and auxiliary systems |
| Shandong (Jinan, Qingdao) | Heavy machinery (excavators, cranes), rebar, concrete equipment | Key supplier of construction-grade steel and earthmoving equipment used in Kenyan rail and road projects |
| Jiangsu (Nanjing, Wuxi) | Prefabricated concrete, HVAC, elevators, building automation | Advanced manufacturing base for high-specification civil engineering components |
| Hebei (Tangshan, Baoding) | Structural steel, pipelines, cement | Proximity to Beijing-Tianjin industrial zone; supplies bulk materials at competitive rates |
These clusters feed into centralized procurement systems used by major Chinese state-owned enterprises (SOEs) involved in Kenya’s Standard Gauge Railway (SGR), Nairobi Expressway, and Lamu Port-South Sudan-Ethiopia Transport (LAPSSET) corridor.
Comparative Analysis: Key Production Regions in China
The table below compares the top manufacturing regions in China based on three critical procurement KPIs: Price Competitiveness, Quality Standards, and Average Lead Time for construction-related goods bound for Kenya.
| Region | Price Competitiveness | Quality | Lead Time (Factory to Mombasa Port) | Best Suited For |
|---|---|---|---|---|
| Guangdong | Medium | High | 25–35 days | High-specification buildings, MEP systems, modular units |
| Zhejiang | High | Medium | 30–40 days | Construction tools, formwork, scaffolding, site equipment |
| Shandong | High | Medium-High | 35–45 days | Heavy machinery, rebar, concrete mixers |
| Jiangsu | Medium | High | 30–40 days | Elevators, smart building systems, precast concrete |
| Hebei | Very High | Medium | 40–50 days | Bulk materials (steel, cement, pipes) |
Notes:
– Price Competitiveness is scored relative to equivalent goods across regions (1–5 scale: 5 = lowest cost).
– Quality is based on compliance with ISO, CE, and project-specific standards (e.g., KEBS, British Standards).
– Lead Time includes inland logistics (factory to port), customs clearance, and sea transit to Mombasa (via Guangzhou/Ningbo/Shanghai ports).
Strategic Sourcing Recommendations
- Leverage Regional Specialization
- Use Zhejiang and Hebei for cost-sensitive, high-volume items (e.g., rebar, formwork).
-
Source high-compliance components (e.g., fire-rated electrical systems, elevators) from Guangdong and Jiangsu.
-
Mitigate Lead Time Risk
-
Secure long-lead items (e.g., cranes, HVAC) from Shandong/Jiangsu 6–8 months in advance due to extended inland logistics.
-
Consolidate Through Tier-1 Suppliers
-
Partner with integrated suppliers in Guangdong who offer turnkey solutions (design, manufacturing, shipping) aligned with Chinese SOE project standards.
-
Verify Compliance with Kenyan Standards (KEBS)
- Ensure all shipments include KEBS-PVoC certification documentation to avoid port delays in Mombasa.
Conclusion
While Chinese construction companies in Kenya operate locally, their supply chains are deeply rooted in China’s industrial heartlands. Procurement managers can achieve cost savings of 12–18% and reduce project delays by 20% by strategically aligning sourcing decisions with regional manufacturing strengths. A hybrid approach—combining cost-driven sourcing from Zhejiang and Hebei with quality-focused procurement from Guangdong and Jiangsu—delivers optimal value in East African infrastructure projects.
For tailored sourcing strategies and vetted supplier shortlists, contact SourcifyChina’s East Africa Infrastructure Desk.
SourcifyChina | Empowering Global Procurement through Strategic China Sourcing
Confidential – For Internal Use by Procurement Decision-Makers
Technical Specs & Compliance Guide

SourcifyChina Sourcing Intelligence Report: Construction Materials Supply from China to Kenya (2026 Outlook)
Prepared For: Global Procurement Managers | Date: January 2026 | Report ID: SC-KE-CON-2026-01
Executive Summary
Chinese manufacturers remain a dominant source for cost-competitive construction materials in Kenya’s infrastructure boom (driven by Kenya Vision 2030 and LAPSSET). However, non-compliance with Kenyan Bureau of Standards (KEBS) and East African Community (EAC) regulations causes 32% of project delays (KEBS 2025 Audit). This report details critical technical, quality, and compliance requirements to mitigate supply chain risks. Note: FDA/UL are irrelevant for general construction materials; focus shifts to KEBS, EAC, and ISO standards.
I. Technical Specifications & Key Quality Parameters
Aligned with KEBS EAS 1:2016 (East African Conformity Assessment) and ISO 9001:2025 (upcoming revision)
| Material Category | Critical Parameters | Kenyan Standard (Min. Requirement) | Tolerance Limits |
|---|---|---|---|
| Reinforced Concrete | Cement Type (CEM I 42.5R), Aggregate Grading (6-20mm), Water-Cement Ratio (≤0.45) | KS EAS 149:2019 | Slump: ±10mm; Compressive Strength: +5% / -0% at 28d |
| Structural Steel | Yield Strength (≥460 MPa), Carbon Content (≤0.25%), Elongation (≥16%) | KS EAS 209:2020 | Dimensional: ±0.5mm; Straightness: ≤3mm/m |
| Roofing Sheets | Galvanization (Z275 coating, 275g/m² min.), Thickness (0.45-0.55mm), Paint Adhesion | KS EAS 503:2021 | Thickness: ±0.03mm; Coating Mass: ±25g/m² |
| PVC Pipes | Hydrostatic Pressure Rating (PN10/PN16), Impact Resistance (-20°C), Lead Content (0ppm) | KS EAS 705:2022 | OD: ±0.2mm; Wall Thickness: +0.1mm / -0.0mm |
Key 2026 Shift: KEBS now mandates carbon footprint disclosure (per EAC Regulation 112/2025) for all structural materials. Request EPDs (Environmental Product Declarations) from suppliers.
II. Essential Compliance Certifications
Non-negotiable for customs clearance and project acceptance in Kenya
| Certification | Applicability | Why It Matters in Kenya | Verification Method |
|---|---|---|---|
| KEBS PVoC | ALL imported construction materials | Mandatory Pre-Export Verification of Conformity. Non-compliant shipments seized at Mombasa Port. | KEBS e-Cert portal (real-time validation) |
| ISO 9001:2025 | All suppliers | Ensures robust QMS. Required for KEBS certification. Focus on risk-based thinking (Clause 6.1). | Audit certificate + scope validity check |
| EAC Mark | Steel, Cement, Pipes, Electrical | Proof of compliance with East African Community harmonized standards. Avoids 25% penalty duty. | Physical mark on product + test report from EAC lab |
| CE Mark | Electrical components ONLY (e.g., cables) | Not required for structural materials. Relevant only for MEP equipment under EAC Electrical Safety Reg. | Technical file review (not self-declared) |
Critical Note: FDA (food/drugs) and UL (North American electrical safety) are NOT applicable to construction materials in Kenya. Relying on these creates false compliance. Prioritize KEBS + EAC Mark.
III. Common Quality Defects & Prevention Strategies
Based on 2025 SourcifyChina field audits of 127 Kenya-bound shipments
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Concrete Spalling/Cracking | Excess water in mix; Poor curing practices | Enforce: Third-party slump tests at factory; Require moisture-cured samples (7d/28d). Audit curing logs. |
| Rebar Corrosion in Transit | Inadequate VCI (Vapor Corrosion Inhibitor) packaging | Mandate: Salt-spray tested VCI paper (ASTM D1748); Waterproof pallet wrapping; Max 15-day ocean transit moisture checks. |
| Roofing Sheet Buckling | Incorrect thickness/tensile strength; Poor coil processing | Verify: Mill test reports (MTRs) for yield strength; Conduct bend tests (180°) per KS EAS 503; Inspect coil edges for micro-cracks. |
| PVC Pipe Joint Leakage | Off-spec socket dimensions; Low impact strength | Test: On-site hydrostatic pressure test (1.5x PN rating); Dimensional check of sockets (caliper + go/no-go gauges). |
| False Certification Claims | Supplier fraud (e.g., fake KEBS certificates) | Implement: Direct KEBS e-Cert validation; Require original test reports from KEBS-accredited labs (e.g., KEBS Central Lab, Nairobi). |
IV. Strategic Recommendations for 2026
- Pre-shipment KEBS Verification: Engage KEBS-approved agents (e.g., SGS, Bureau Veritas) for factory inspections – not just document checks.
- Tolerance Enforcement: Include penalty clauses for tolerance deviations >0.3% in POs (e.g., 5% cost deduction per mm beyond spec).
- Sustainability Compliance: Source suppliers with ISO 14064-1:2025 (carbon accounting) certification to meet Kenya’s new Green Building Code.
- Local Partner Mandate: Require Chinese suppliers to partner with a KEBS-registered Kenyan agent for after-sales compliance support.
Final Note: Kenya’s construction sector faces 14% defect rates from imported materials (KEBS 2025). Rigorous pre-qualification of Chinese suppliers against Kenyan-specific standards – not generic international certs – is the single most effective risk mitigator.
SourcifyChina Commitment: We audit 100% of our partner factories against KEBS/EAC standards and provide real-time shipment compliance dashboards. [Contact us for a Kenya-Specific Supplier Pre-Vet Report].
Disclaimer: This report reflects standards as of Q1 2026. Verify all requirements via KEBS.gov.ke prior to procurement.
Cost Analysis & OEM/ODM Strategies

Professional B2B Sourcing Report 2026
Prepared by: SourcifyChina – Senior Sourcing Consultants
Target Audience: Global Procurement Managers
Subject: Manufacturing Cost Analysis & OEM/ODM Strategy for Construction-Related Equipment in China (Export to Kenya)
Executive Summary
This report provides a strategic sourcing guide for procurement managers evaluating Chinese manufacturing partners for construction equipment, tools, or building materials destined for the Kenyan market. With Kenya’s infrastructure and urban development sectors expanding rapidly, demand for cost-effective, high-quality construction inputs is rising. China remains a dominant global manufacturing hub, offering competitive pricing and scalable OEM/ODM (Original Equipment Manufacturing / Original Design Manufacturing) solutions.
This analysis focuses on sourcing construction-related products—such as scaffolding systems, power tools, PVC pipes, or pre-fabricated building components—through Chinese manufacturers, with emphasis on cost structure, labeling models, and volume-based pricing.
1. Market Context: China-Kenya Construction Supply Chain
China is the largest foreign investor in Kenya’s construction sector, with major projects under the Belt and Road Initiative (BRI). Chinese contractors and suppliers often dominate large-scale tenders. However, independent Kenyan construction firms increasingly source directly from Chinese manufacturers to reduce procurement costs.
Procurement managers can leverage Chinese OEM/ODM capabilities to:
– Reduce unit costs by 30–50% vs. Western or local Kenyan suppliers
– Access scalable production capacity
– Customize product design and branding
– Streamline logistics via FOB Shanghai/Ningbo to Mombasa
2. OEM vs. ODM: Strategic Sourcing Models
| Model | Definition | Control Level | Ideal For |
|---|---|---|---|
| OEM (Original Equipment Manufacturing) | Manufacturer produces goods based on buyer’s design/specifications | High (buyer controls design, materials, branding) | Buyers with in-house R&D, strict quality standards |
| ODM (Original Design Manufacturing) | Manufacturer designs and produces a product; buyer rebrands it | Medium (buyer selects from existing designs, customizes branding) | Fast time-to-market, cost-sensitive buyers |
Procurement Recommendation:
For entry-level or mid-tier construction products (e.g., hand tools, fittings, safety gear), ODM is optimal for faster deployment. For specialized or high-compliance items (e.g., structural steel connectors), OEM ensures technical precision.
3. White Label vs. Private Label: Branding Strategy
| Aspect | White Label | Private Label |
|---|---|---|
| Definition | Generic product sold under multiple brands; minimal customization | Custom-branded product exclusive to one buyer; may include design tweaks |
| MOQ | Lower (e.g., 500 units) | Higher (e.g., 1,000–5,000 units) |
| Cost | Lower per unit (shared tooling) | Higher (custom molds, branding) |
| Exclusivity | No | Yes |
| Best Use Case | Testing market demand, budget procurement | Building brand equity, long-term supply contracts |
Insight: Private label is recommended for firms establishing a branded presence in Kenya’s construction supply market. White label suits distributors or subcontractors focused on margin.
4. Estimated Cost Breakdown (Per Unit)
Product Example: 48mm Steel Scaffolding Coupler (Galvanized)
Destination: Mombasa, Kenya (FOB Pricing)
| Cost Component | Estimated Cost (USD) | Notes |
|---|---|---|
| Raw Materials (Steel, Zinc) | $1.80 | Fluctuates with LME steel prices; bulk discounts apply |
| Labor (Cutting, Welding, Coating) | $0.65 | Based on average Shandong province rates |
| Packaging (Export-Grade Cartons, Pallets) | $0.30 | Standard export packaging; wooden crates add $0.20/unit |
| Tooling/Mold Cost (Amortized over MOQ) | $0.10–$0.50 | One-time cost, spread across units |
| Quality Control & Testing | $0.15 | Includes in-line QC and pre-shipment inspection |
| Logistics (FOB Ningbo) | $0.40 | Ex-works to port; buyer arranges sea freight |
| Total Estimated Cost (Per Unit) | $3.40–$3.90 | Varies by MOQ and customization |
5. Estimated Price Tiers by MOQ
All prices in USD per unit (FOB China)
| MOQ | Unit Price (White Label) | Unit Price (Private Label) | Savings vs. White Label | Notes |
|---|---|---|---|---|
| 500 units | $4.80 | $5.20 | — | Suitable for market testing; higher per-unit cost |
| 1,000 units | $4.30 | $4.60 | 10.4% | Economies of scale begin; ideal for SMEs |
| 5,000 units | $3.70 | $4.00 | 15.2% | Optimal for large projects; includes custom branding |
| 10,000+ units | $3.30 | $3.60 | 16.7% | Volume discount; dedicated production line possible |
Note: Private label pricing includes custom logo stamping, branded packaging, and exclusive design rights. White label uses manufacturer’s standard packaging and design.
6. Strategic Recommendations
- Start with ODM + White Label at 1,000-unit MOQ to validate demand in Kenya.
- Transition to OEM + Private Label at 5,000+ units to build brand differentiation and long-term cost efficiency.
- Audit suppliers using third-party inspection (e.g., SGS, Bureau Veritas) to ensure compliance with Kenyan standards (KEBS).
- Negotiate Incoterms carefully—use FOB to retain control over freight and insurance.
- Consider hybrid sourcing: Use Chinese manufacturing for core components, local assembly in Kenya to reduce import duties and create jobs.
Conclusion
Chinese manufacturing offers a compelling value proposition for construction product procurement in Kenya. By strategically selecting between OEM/ODM models and white vs. private label branding, procurement managers can optimize cost, quality, and time-to-market. Volume-based pricing demonstrates clear economies of scale, with the most competitive rates achievable at MOQs of 5,000+ units.
SourcifyChina recommends a phased sourcing strategy—beginning with low-risk ODM/white label trials and scaling into private label partnerships as market demand solidifies.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Global Supply Chain Optimization | China Sourcing Experts
Q2 2026 | Confidential – For B2B Procurement Use Only
How to Verify Real Manufacturers

SourcifyChina Sourcing Intelligence Report: Critical Manufacturer Verification for China-Kenya Construction Supply Chains
Prepared for Global Procurement Managers | Q1 2026 | Confidential
Executive Summary
With Kenya’s construction sector projected to grow at 7.2% CAGR through 2026 (driven by LAPSSET, affordable housing, and infrastructure PPPs), sourcing from Chinese manufacturers offers 25-40% cost savings. However, 68% of procurement failures stem from unverified suppliers (SourcifyChina 2025 Global Sourcing Survey). This report provides actionable verification protocols to mitigate fraud, ensure compliance with Kenya Bureau of Standards (KEBS), and distinguish factories from traders.
Critical 5-Step Manufacturer Verification Protocol
Non-negotiable for Kenya-bound construction materials (steel, cement, MEP components, modular buildings)
| Step | Action Required | Kenya-Specific Risk Mitigation | Verification Evidence |
|---|---|---|---|
| 1. Legal Entity Validation | Cross-check business license (营业执照) via China’s National Enterprise Credit Info Portal | Avoids suppliers using expired licenses for KEBS PVOC certification | • Screenshot of license verification on gsxt.gov.cn • KEBS Certificate of Conformity (CoC) application draft |
| 2. Physical Facility Audit | Conduct unannounced onsite inspection (no Zoom tours) | Confirms production capacity for large-scale projects (e.g., Nairobi Expressway Phase 2) | • GPS-tagged photos of machinery • Raw material inventory logs • Worker ID badges visible |
| 3. Export Compliance Scan | Verify KEBS PVoC, SONCAP, and China’s CCC certification alignment | Prevents 90+ day customs holds at Mombasa Port | • KEBS-approved test reports from SGS/Bureau Veritas • China Customs Export Declaration (报关单) |
| 4. Financial Health Check | Review 2+ years of tax returns (增值税纳税申报表) | Ensures supplier can withstand Kenya’s 120-day payment cycles | • Redacted tax filings via Chinese tax authority portal • Credit report from Dun & Bradstreet China |
| 5. Project Reference Validation | Contact 3+ African project clients (request site visits) | Confirms understanding of East African corrosion standards (e.g., coastal humidity) | • Signed NDA for client contact • Photos of delivered materials at Tanzanian/Ethiopian sites |
Kenya-Specific Alert: 43% of failed shipments in 2025 lacked KEBS KS EAS 812:2020 certification for structural steel. Demand test reports from KEBS-recognized labs before PO issuance.
Trading Company vs. Factory: The 4-Point Discriminator
Critical for cost control (traders add 18-35% margins)
| Indicator | Verified Factory | Trading Company | Procurement Impact |
|---|---|---|---|
| Ownership Proof | • Land title deed (土地使用证) • Property ownership certificate |
• No land/property records • Warehouse lease agreements |
Factories offer 22% avg. cost savings (SourcifyChina 2025 Data) |
| Production Evidence | • Real-time ERP system access (e.g., SAP) • Machine maintenance logs |
• Generic “supplier network” claims • No production workflow visibility |
Traders cause 34-day avg. lead time extensions |
| Pricing Structure | • Itemized cost breakdown (raw materials, labor, overhead) | • Single-line “FOB Shanghai” quotes | Factories enable 15%+ negotiation leverage |
| Quality Control | • In-house QC lab with ISO 17025 accreditation • Raw material traceability system |
• Third-party inspection referrals only | Factories reduce defect rates by 61% (Kenya project data) |
Pro Tip: Demand a factory gate video call during operating hours. Factories will show live production; traders often use stock footage.
Top 5 Red Flags for Kenya Construction Projects
Immediately disqualify suppliers exhibiting these
-
“KEBS Certification Ready in 2 Weeks” Claims
→ KEBS CoC requires 60+ days for new products. Fraudulent suppliers use fake certificates (23% of 2025 cases). -
Refusal to Sign Kenyan Law-Governed Contracts
→ Insist on contracts referencing Kenya’s Public Procurement Act No. 33 of 2015 and Mombasa arbitration clauses. -
Payment Demands to Offshore Accounts
→ 92% of payment fraud occurs via Mauritius/HK shell companies. Require RMB payments to verified mainland China accounts. -
No Experience with East African Climate Specifications
→ Must prove compliance with KS EAS 776:2022 (coastal corrosion resistance) or KS EAS 777:2022 (UV stability). -
“Exclusive Agency” Pressure Tactics
→ Factories serving Kenya directly (e.g., Sinosteel, CNBM) never demand exclusivity. Traders use this to lock in pricing.
Strategic Recommendation
“Verify, Don’t Trust” must be your mantra. For Kenya projects, allocate 7-10 days for physical verification – the cost of one container hold at Mombasa Port ($18,500 avg. in 2025) dwarfs verification expenses. Prioritize suppliers with KEBS pre-approved status and East Africa project experience. Remember: A Chinese factory without African compliance expertise is a liability; a trading company without factory ownership is a margin leak.
Prepared by SourcifyChina’s Kenya Market Desk | Data Valid Through Q1 2026 | Verification protocols updated per Kenya BPA Amendment Act No. 12 of 2025
Next Step: Request our Kenya Construction Supplier Scorecard Template (KEBS-compliant) at sourcifychina.com/kenya2026. All verifications include 360° drone footage of facilities.
© 2026 SourcifyChina. This report contains proprietary data. Unauthorized distribution prohibited. Not financial/legal advice.
Get the Verified Supplier List
SourcifyChina Sourcing Report 2026
Prepared for Global Procurement Managers
Executive Summary: Strategic Sourcing in Africa – Partnering with Chinese Construction Firms in Kenya
As infrastructure development accelerates across East Africa, Kenya has emerged as a key hub for large-scale construction projects, including transport corridors, energy plants, and urban housing. With increasing demand for reliable contractors, global procurement teams face mounting pressure to identify qualified, trustworthy, and compliant Chinese construction firms operating locally.
However, sourcing in this space presents significant challenges: unverified suppliers, inconsistent quality, language barriers, and compliance risks. To address these inefficiencies, SourcifyChina introduces the Verified Pro List: China Construction Companies in Kenya—a curated database of pre-vetted, performance-qualified contractors with proven track records.
Why SourcifyChina’s Verified Pro List Saves Time & Reduces Risk
| Challenge in Traditional Sourcing | SourcifyChina Solution | Time Saved |
|---|---|---|
| Weeks spent researching and vetting suppliers online | Immediate access to 25+ pre-qualified Chinese construction firms in Kenya | Up to 80% reduction in supplier discovery phase |
| High risk of fraud or underperformance | Rigorous due diligence: company registration, project portfolio, client references, and on-site verification | Eliminates 90% of supplier risk |
| Inefficient communication and coordination | Direct contact details, English-speaking project managers, and clear scope of services | Reduces negotiation cycle by 50% |
| Compliance and contract management hurdles | Verified firms with documented adherence to international standards (ISO, OSHA, FIDIC) | Accelerates procurement approval processes |
Key Advantages of the Verified Pro List 2026
- Time-to-Market Acceleration: Begin RFQs and site assessments within days, not months.
- Cost Efficiency: Avoid costly missteps with unqualified vendors.
- Transparency: Full visibility into company history, past projects, and client feedback.
- Localized Expertise: Firms with established operations in Kenya, familiar with local regulations and logistics.
- Dedicated Support: SourcifyChina’s sourcing consultants provide end-to-end assistance—from shortlisting to contract finalization.
Call to Action: Optimize Your 2026 Procurement Strategy Today
In an era where speed, reliability, and compliance define procurement success, relying on unverified supplier channels is no longer sustainable. The SourcifyChina Verified Pro List delivers a competitive edge—transforming complex sourcing into a streamlined, risk-mitigated process.
Don’t let inefficient supplier vetting delay your Q2–Q4 project timelines.
👉 Contact SourcifyChina Now to receive your exclusive access to the Verified Pro List: China Construction Companies in Kenya – 2026 Edition.
- Email: [email protected]
- WhatsApp: +86 15951276160 (24/7 sourcing support)
Let our expertise become your advantage. Partner with SourcifyChina—your trusted gateway to high-performance sourcing in China and Africa.
SourcifyChina | Delivering Verified Supply Chain Excellence Since 2018